greatvoyager
Established Member
Short term future will be with XC.
Long term I expect will be scrap.
Long term I expect will be scrap.
Hmmm. What routes did you have in mind? There's not many suitable for heavy trains with a top speed of 125mph.To Northern, please!
Not to mention that the interior layout isn't appropriate.Hmmm. What routes did you have in mind? There's not many suitable for heavy trains with a top speed of 125mph.
Not to mention that the interior layout isn't appropriate.
Agreed, that would be a logical option.Quite. Northern passengers would never put up with such a cramped layout. Except of course Coach D with its almost-all-tables layout which is similar to a 195 but with all the seats aligned to the windows.
(To be honest, if the TOC could take the capacity hit and use a layout like that, maybe replacing a bay with a large luggage rack, they'd not be at all bad...)
Agreed, that would be a logical option.
And maybe replace one of the disabled toilets with a standard toilet and additional luggage or seating.You could possibly also make the overheads bigger if whatever runs inside the rack could be moved elsewhere, replacing them with a more usual glass and steel one at the same height and gaining a few inches and a more useful shape a bit more like the Pendolino rack.
Short term future will be with XC.
Long term I expect will be scrap.
And maybe replace one of the disabled toilets with a standard toilet and additional luggage or seating.
True, although there must be a way. Either way, it will all depend on demand.I mean in the long term everything will be scrapped eventually! I expect that they'll migrate to XC as they come free from West Coast but honestly doubt that they'll all see out the 2020s. Whether that counts as long term I'll to you!
That has been looked at previously (I think even whilst they were still under construction even!) and ruled out as being to challenging (read: expensive) to be justifiable as it would require work on the body shell. If they couldn't make the case stack up when they were younger no one is going to manage it when their twenty years old...
Hmmm. What routes did you have in mind? There's not many suitable for heavy trains with a top speed of 125mph.
Very true - and take on board the comments from others. Whilst my post was a little in jest, on a serious note - could the Voyager sets work in 3-car formation to be cascaded to operators with smaller stations but whose journeys run on high speed line? Using Northern again as an example - if Northern had Voyagers on the Airport to Windermere run, they could get some good speed up between NLW and OXN.
An interesting thought, but I believe Voyagers need at least the two intermediate carriages because of the electrical equipment.Very true - and take on board the comments from others. Whilst my post was a little in jest, on a serious note - could the Voyager sets work in 3-car formation to be cascaded to operators with smaller stations but whose journeys run on high speed line? Using Northern again as an example - if Northern had Voyagers on the Airport to Windermere run, they could get some good speed up between NLW and OXN.
I mean in the long term everything will be scrapped eventually!
Very true - and take on board the comments from others. Whilst my post was a little in jest, on a serious note - could the Voyager sets work in 3-car formation to be cascaded to operators with smaller stations but whose journeys run on high speed line? Using Northern again as an example - if Northern had Voyagers on the Airport to Windermere run, they could get some good speed up between NLW and OXN.
It doesn't help that 22x units were designed and built during a time when emissions were not as much a priority as they are today. If they were designed in the present day, they'd probably be very different.If John Maynard Keynes had been on the Forum...
They'd be restricted to paths as slow as the slowest stock that they'd be able to allocate to it 100% of the time - hence why Northern are running 158/195s on 75mph paths through Lancaster (and therefore unable to stop at Lancaster because there's chance that they'll have to allocate a 156 at some stage).
A three coach Voyager would probably have about as many seats as a two coach Sprinter anyway (given the "crumple zones", the big toilets, the poor seating layout etc)
Like I've been saying about the 397s, the Voyagers are too short to take on (m)any 125mph services at other TOCs but too wasteful in space to be cascaded to any 100mph services
If John Maynard Keynes had been on the Forum...
They'd be restricted to paths as slow as the slowest stock that they'd be able to allocate to it 100% of the time - hence why Northern are running 158/195s on 75mph paths through Lancaster (and therefore unable to stop at Lancaster because there's chance that they'll have to allocate a 156 at some stage).
A three coach Voyager would probably have about as many seats as a two coach Sprinter anyway (given the "crumple zones", the big toilets, the poor seating layout etc)
Like I've been saying about the 397s, the Voyagers are too short to take on (m)any 125mph services at other TOCs but too wasteful in space to be cascaded to any 100mph services
One thing in the 221s favour is that they are used by more than one operator. XC operates the rest, so my guess will be going there, even if in the short term in preparation for a new fleet.Ah of course, I hadn't even taken into account the timings for other units that could turn up on the service! As a novice I'm still learning the ins and outs of everything, so thanks for pointing that out as it's clearly crucial to any timing considerations when planning the paths (which I know is a whole other story!). Could it be that a class of train, whilst still completely service worthy, is "deemed" no longer fit for any franchise and is therefore sold to markets abroad or scrapped "ahead of their time"?. I'm sure that won't be the case for the 221s but you never know.
One thing in the 221s favour is that they are used by more than one operator. XC operates the rest, so my guess will be going there, even if in the short term in preparation for a new fleet.
It's a possibility, but I would say for Scotrail, it would probably be preferable to order newer more efficient machines with a longer lifespan.I guess they have a proven track record as well, serving so many people on such diverse services over the years. Whether you like them or you don't, they've stood up to the Pendolino competition (it's not competition as such but.... comparison let's say!) on the west coast and delivered the same speeds and journeys as the 390s with their mods/cons. If you were the average Joe, I think you'd struggle to pick apart the Pendolino and Voyager features (although to us there's a lot). I know Scotrail have employed shorter 125 sets on some routes, could Voyagers assist with this or even replace them?
It's a possibility, but I would say for Scotrail, it would probably be preferable to order newer more efficient machines with a longer lifespan.
That said, proven trains would be easier to introduce than new ones, skipping teething problems and technical glitches.You're absolutely right. New trains = new start. Fab marketing aspect from a region that's been there done that with cast offs.
Also, the 22x trains still have at least 10 years left in them, so could fulfil short term roles. It will depend if the leasing company or operator want to invest though.You're absolutely right. New trains = new start. Fab marketing aspect from a region that's been there done that with cast offs.
That said, proven trains would be easier to introduce than new ones, skipping teething problems and technical glitches.
There probably needs to be a balance with cost too, and work out if its cheaper to lease older stock or order new stock.I know what you mean. To general public yes - new trains are amazing. Whatever their status and wherever they've come from. But they could be old units that have stood the test of time. This is the problem with Northern, we have such a mix of old and new. We take on the old, treat as new to us (because it is, from what we've had!) but we still get problems.
There are more 22x ideas here...I know what you mean. To general public yes - new trains are amazing. Whatever their status and wherever they've come from. But they could be old units that have stood the test of time. This is the problem with Northern, we have such a mix of old and new. We take on the old, treat as new to us (because it is, from what we've had!) but we still get problems.
Regarding the 22* class my apologies I hadn't seen your messages. They could so easily be applied to current franchisees to double up their units. They're going to be confined to limited services soon once electrification rolls out further.
There probably needs to be a balance with cost too, and work out if its cheaper to lease older stock or order new stock.
True. With regard to the ex Virgin 221s, I would probably say that if ever introduced on another route/franchise, they will need work on interiors. Not just to make better use if space, but to also give them a fresher feel.Absolutely. Cost is always the key thing. Our 319s at Northern are so much more cost efficient than building new 331s its so obvious!; but we have to look at how our demographic treat our stock. You could almost induce a class-map based on where our new units serve, I'm not suggesting to do that but you could do, and then the units could be decided. The 142 passengers aren't bothered![]()
True. With regard to the ex Virgin 221s, I would probably say that if ever introduced on another route/franchise, they will need work on interiors. Not just to make better use if space, but to also give them a fresher feel.
True. With regard to the ex Virgin 221s, I would probably say that if ever introduced on another route/franchise, they will need work on interiors. Not just to make better use if space, but to also give them a fresher feel.
Like I've been saying about the 397s, the Voyagers are too short to take on (m)any 125mph services at other TOCs but too wasteful in space to be cascaded to any 100mph services