Moderator note: Split from https://www.railforums.co.uk/threads/worcestershire-parkway-station-progress.103108/page-23
Interesting thread.
I’m dismayed at the lack of calls by the Ply-Edi and Bri-Man services. The whole point of the station when it was first envisaged in the 1970’s was to connect Worcester to major cities such as Manchester, Leeds and Bristol that it wasn’t served by.
And yet all we’re getting is a Cardiff - Nottingham 2 or 3 carriage train - the same one that we had running through Shrub hill under Central Trains in the 2000’s.
Unless stops are made for the long distance trains, this is going to be a white elephant.
Interesting thread.
I’m dismayed at the lack of calls by the Ply-Edi and Bri-Man services. The whole point of the station when it was first envisaged in the 1970’s was to connect Worcester to major cities such as Manchester, Leeds and Bristol that it wasn’t served by.
And yet all we’re getting is a Cardiff - Nottingham 2 or 3 carriage train - the same one that we had running through Shrub hill under Central Trains in the 2000’s.
Unless stops are made for the long distance trains, this is going to be a white elephant.
Last edited by a moderator: