krus_aragon
Established Member
The modernisation of the West Coast route promised 140mph operation by 2002. It famously didn't. But if it had, Pendolinos would have been able to operate at their design speed of 140mph. SuperVoyagers, on the other hand, were only designed for 125mph.
Today, the southern portions of the WCML are designed around fast passenger trains operating at 125mph, slow pasenger trains operating at 110mph, and some freight paths too. (Correct me if I'm wrong.)
Let's assume for the sake of argument that the upgrades had all been delivered as planned. That would mean that there'd be three different speeds of passenger train: 140mph, 125mph, and 110mph.
What sort of impact would this have on the pathing constraints of the route? Would capacity be reduced compared to what we have today, for example?
Today, the southern portions of the WCML are designed around fast passenger trains operating at 125mph, slow pasenger trains operating at 110mph, and some freight paths too. (Correct me if I'm wrong.)
Let's assume for the sake of argument that the upgrades had all been delivered as planned. That would mean that there'd be three different speeds of passenger train: 140mph, 125mph, and 110mph.
What sort of impact would this have on the pathing constraints of the route? Would capacity be reduced compared to what we have today, for example?