Bombardier and Hitachi do meet this requirements. In fact Hitachi come extremely close to this requirement.
Do you mean that Hitachi only just meet the requirements and Bombardier clearly meet it?
A key difference here, though, is that Bombardier's product is theoretical whereas Hitachi's definitely exists and is running successfully on GWR. Given how much of an issue most of the new fleets have been, this has to have huge value.
Can Hitachi make an 8-car 802 with 6 generator units? Might be able to make up the power deficit of the standard 802 (plus one less 24m carriage). Capacity around ~560. With 802s on GWR, HT and TPE, I'd say Hitachi are in pole position for EMR.I'd personally go for a uniform fleet of 7 or 8x26m and vary the timetable and Advance fares to make best use of them.
Can Hitachi make an 8-car 802 with 6 generator units? Might be able to make up the power deficit of the standard 802 (plus one less 24m carriage). Capacity around ~560. With 802s on GWR, HT and TPE, I'd say Hitachi are in pole position for EMR.
Hitachi could but the Bombardier concept is 1 engine raft per car (no intermediate car only Hitachi limitiations) using the same MTU raft has Hitachi. This allows Bombarider to be flexible with the number of car/unit if requiredCan Hitachi make an 8-car 802 with 6 generator units? Might be able to make up the power deficit of the standard 802 (plus one less 24m carriage). Capacity around ~560. With 802s on GWR, HT and TPE, I'd say Hitachi are in pole position for EMR.
Hitachi have done Bombardier a big favour in providing several years of real in UK service learning with the MTU rafts to MTU and Bombardier can design around know issues and limitations to optimise overall costs. How hard the engines are worked has an effect on maintenance intervals and extending the intervals could mean fewer units need to be ordered overall.A key difference here, though, is that Bombardier's product is theoretical whereas Hitachi's definitely exists and is running successfully on GWR. Given how much of an issue most of the new fleets have been, this has to have huge value.
Where are the transformers located on the Aventra bi-mode?Hitachi could but the Bombardier concept is 1 engine raft per car (no intermediate car only Hitachi limitiations) using the same MTU raft has Hitachi. This allows Bombarider to be flexible with the number of car/unit if required
Bombardiers design will be about 30-35tons lighter than an equivalent 9car IEPs (assume the same number of engines as current IEPs) so won't need as much power to achieve performance targets in the first place.
This allow the engines to be run more gently most of the time (as per 100mph IEP on diesel thinking but for 125mph this time) and no performance loss if an engine is switched off as the others can pick up the slack.
The doubling up is at least as much about the limited number of paths as the platforms. A unit too long to be doubled but shorter than the platforms at St Pancras would be a reduction is passenger space on the busiest services - but not necessarily a reduction in seating is it would probably use that space more efficiently than a 222 (this may or may not involve face-to-back ironing boards).Wouldn't that cause issues with flighting services in the morning and evening peaks at STP? At present they regularly double up the units because of the meagre 4 platforms they got stuck with. I suppose they could slash the turnaround times and not do any cleaning...
On the opposite end of the car to the pantograph well but the aventra transformers (like the new desiro city ones) are of a newer design that is more compact and has new cooling design. Hence more space underneath for the raft. The other key bit with the Aventras is that the traction motor electronics don't have to be on the same car as the traction motors (4 or 6 motors of control electronics along with auxiliary 415V 110V supplies per "grey" box)Where are the transformers located on the Aventra bi-mode?
Much as I am inclined to question the wisdom of the DfT's specification of IEP, and the value for money of it, there is surely a big long term benefit to all the major inter city operators in the country sharing a common fleet type.
If we can move away from the fragmentation of the late 90s, won't the industry be in a better long term position?
http://the-japan-news.com/news/article/0005741120
・・・・・・
Hitachi officials said the company is considering expanding its rail car production plant in Newton Aycliffe, northern England.
Hitachi will make its final decision after the course of Britain’s exit from the European Union is fixed, according to the officials. Several billion yen would likely be invested.
In Britain, Hitachi assembles train cars from components made mainly at the Kasado plant in Kudamatsu, Yamaguchi Prefecture.
“We’ll cut transportation costs. We’ll build train cars at the British plant,” Kasado plant manager Junichi Kawahata said.Speech
Much as I am inclined to question the wisdom of the DfT's specification of IEP, and the value for money of it, there is surely a big long term benefit to all the major inter city operators in the country sharing a common fleet type.
If we can move away from the fragmentation of the late 90s, won't the industry be in a better long term position?
Hitachi officials said the company is considering expanding its rail car production plant in Newton Aycliffe, northern England.
japan-news May 16, 2019
Regarding the production plan of Newton Aycliffe plant after the end of IEP vehicle production,
As a rumor of a certainty person,
"At present, the backlog of general-purpose vehicles called AT-300, which is the same type as IEP, has reached more than 1000 cars,"
It emphasizes that there is no anxiety in the plant operation for the time being.
HITACHI recently secured a large volume order?
red herring!Hitachi officials said the company is considering expanding its rail car production plant in Newton Aycliffe, northern England.
japan-news May 16, 2019
Regarding the production plan of Newton Aycliffe plant after the end of IEP vehicle production,
As a rumor of a certainty person,
"At present, the backlog of general-purpose vehicles called AT-300, which is the same type as IEP, has reached more than 1000 cars,"
It emphasizes that there is no anxiety in the plant operation for the time being.
HITACHI recently secured a large volume order?
Apparently Stadler’s offer struggles to meet journey time requirements so despite people thinking it would be in pole position it does not look that way as if it cannot meet journey time requirements on diesel then it is less likely to be chosen. Bombardier and Hitachi do meet this requirements. In fact Hitachi come extremely close to this requirement.
So, do Hitachi meet it or come close? You've rather contradicted yourself there.
I think whatever follow-on orders are place now,there will be mechanisms in place to ensure most of the manufacturing is done in UK.In these days where populism outweighs everything else I think it inconceivable this will go to anyone except derby based bombardier. Which is a shame as a larger fleet of nationwide 802s makes more sense.
CAF seem to have carved out a niche for building stuff that nobody else wants to touch,so maybe they get the direct 14x/153 replacements?
I was hoping that the new trains would be Stadler, as the trains are definitely the best, with solid build quality.
TBH, the 800s are also not a bad train - they just have rubbish seats, but there's nothing stopping someone else funding the testing of a different seat for 125mph use on new stock - the FISA LEAN would be a good bet. Stadler's "killer app", though, is low floor, removing the need for passenger assistance (something the railway are having difficulties delivering properly and consistently, and are always cruising for a court case) in a stroke. I still think this should be made mandatory.
I'm pretty sure that might have something to do with them being operated by First Great Western, because the Southeastern Javelins have neither of those and are very well built (except for couple that are rattly, but that's not many).Um, the build quality is absolutely terrible!
The GWR 800s have crackly PAs and about 50,000 rattles in each coach