Scottish Electrification updates & discussion

Status
Not open for further replies.

mcmad

Member
Joined
11 Mar 2015
Messages
1,072
The Scottish Govt has already set out its rail priorities for 2019/20:
https://www.gov.scot/publications/scottish-budget-2019-20/

So no new projects in 19/20? The rolling program has hit the buffers?

Edit:

A bit further digging reveals table 10.05 which reveals that after a sharp drop from £310m in 17/18 to £183m in 18/19, franchise spending more than doubles in 19/20 to £417m, presumably the impact of the new sleeper franchise?

Actual infrastructure spending is harder to quantify given the new split of enhancements.

Total Infra and major projects spend in 17/18 was £462m in 17/18, rising to £619m in 18/19 as EGIP and SDA were delivered but drops to £569 in 19/20 with £207 allocated to major projects (the final bill for Shotts and Glasgow QS making up most of that?)





 
Last edited:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

kilonewton

Member
Joined
19 Apr 2010
Messages
152
Location
Scotland no more
There are regular pictures of the work on their Twitter. According to the timetable, Sunday services resume on 31st March, so I take it that the works are scheduled to be completed by then. That's why I don't understand why the project appears in next year's budget.
Surely there’s works to be undertaken under normal rules of the route to complete after 31 March. You’ve also got the footbridge at Stirling to go back in, which is part of the rolling electrification programme.
 

InOban

On Moderation
Joined
12 Mar 2017
Messages
4,537
Development at Stirling station is mentioned. But the fact remains that the first item in the list is the continuation of the Rolling Program. And since Shotts will be at least 99% complete by March 31st, there clearly is no rolling program.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,594
Location
Nottingham
No...
Thank you, exactly as I said... so the empty one could easily have a restricted-clearance pan fitted which would power the whole train when it was up, instead of one of the other two..
But Pendolinos don't go over the Forth Bridge and are unlikely ever to do so.
 

YorkshireBear

Established Member
Joined
23 Jul 2010
Messages
9,661
But Pendolinos don't go over the Forth Bridge and are unlikely ever to do so.

Have you not heard of the proposal for Virgin West Coast to run from London Euston to Inverness via Carlisle, Falkirk, Kirkcaldy, Perth, Dundee and Aberdeen? :lol::lol::lol::lol:
 

AndrewE

Established Member
Joined
9 Nov 2015
Messages
7,301
But Pendolinos don't go over the Forth Bridge and are unlikely ever to do so.
That's as maybe. We are just debating with the "It can't be done" contingent.
As the UK never seems to be able to afford rolling stock for our railway, and with all the EMU's that are apparently coming off lease it is worth thinking about how a big enough fleet can be created economically for future work. Now that roof-top 25kV jumpers are established on the Pendolinos perhaps the redundant EMUs could have an extra pan well put into the roof of the car next to the existing pan for our Forth Bridge special fleet!
 

59CosG95

Established Member
Joined
18 Aug 2013
Messages
6,853
Location
Beeston (Notts)

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,594
Location
Nottingham
That's as maybe. We are just debating with the "It can't be done" contingent.
The Pendolino only has a spare pan well due to the vagaries of the procurement of the extra coaches, and it's unlikely to be repeated on any future build. Instead future intercity stock, if not fully bi-mode, may have an auxiliary diesel like the electric 80x variants or perhaps a battery with similar size and range. As they wouldn't be stopping at the stations either end of the bridge these units would coast across most of the time and the auxiliary engine could get them out of trouble if they did have to stop.

The problem is much more with future stopping trains, which would more likely be off-the-shelf EMU designs so a second pantograph and attendant 25kV jumper would be a non-standard and expensive design change. Again I think it's more likely that these units would be available with a battery option which could be specified for trains diagrammed to use these routes. Always assuming some means isn't found of extending the wires over the bridge...
 

ScottDarg

Member
Joined
27 Apr 2017
Messages
718
Location
South Lanarkshire
https://twitter.com/RailFreight/status/1098998165456519169?s=19
Freightliner have spilled the beans - 2 Cans (86s) are due to test the Shotts OLE on Sunday!
The path is in too - Mossend to Midcalder Jct, reverse, Midcalder Jct to Holytown Jct, reverse, Holytown Jct to Midcalder Jct, reverse again, Midcalder Jct back to Mossend.
http://www.realtimetrains.co.uk/train/B15223/2019/02/24/advanced

86638 is doing the honours on its own.

Vid on Facebook last night indicated it would be 86638 + IKA wagon + 86627. No idea if there was some issue that meant only 638 could go out or if that was always the plan
 

Southsider

Member
Joined
10 Aug 2015
Messages
937
https://twitter.com/RailFreight/status/1098998165456519169?s=19
Freightliner have spilled the beans - 2 Cans (86s) are due to test the Shotts OLE on Sunday!
The path is in too - Mossend to Midcalder Jct, reverse, Midcalder Jct to Holytown Jct, reverse, Holytown Jct to Midcalder Jct, reverse again, Midcalder Jct back to Mossend.
http://www.realtimetrains.co.uk/train/B15223/2019/02/24/advanced
It appears to be running
https://twitter.com/JackPGBRf/status/1099598281854865409?s=20
 

Highlandspring

Established Member
Joined
14 Oct 2017
Messages
2,777
I don’t see why that would be required..? They’ll be Route Cleared when the time comes, which is a paper exercise, but there’s no need for dynamic on load testing of each different type of traction over a route.
 

Class 170101

On Moderation
Joined
1 Mar 2014
Messages
8,661
I don’t see why that would be required..? They’ll be Route Cleared when the time comes, which is a paper exercise, but there’s no need for dynamic on load testing of each different type of traction over a route.

Don't the Pendolinos get used to test the OLE at maximum load though as they are very power hungry? They have been on the Manchester to Liverpool, Preston to Blackpool, Preston to Manchester schemes so far.
 

gsnedders

Established Member
Joined
6 Sep 2015
Messages
1,472
Don't the Pendolinos get used to test the OLE at maximum load though as they are very power hungry? They have been on the Manchester to Liverpool, Preston to Blackpool, Preston to Manchester schemes so far.
Are those not all routes that VT drivers sign anyway, though? Which presumably makes it relatively easy to do, given you don't also need to get a route conductor in…
 

Highlandspring

Established Member
Joined
14 Oct 2017
Messages
2,777
For the record some Virgin drivers sign the Benhar. As I say, from the perspective of a reasonably well informed insider I don’t see class 390 traction specific test runs as being particularly likely but who knows.
 

CEN60

Member
Joined
17 Dec 2018
Messages
299
I don’t see why that would be required..? They’ll be Route Cleared when the time comes, which is a paper exercise, but there’s no need for dynamic on load testing of each different type of traction over a route.

Pendo's are route cleared in passive mode for Shotts Line.
 

CEN60

Member
Joined
17 Dec 2018
Messages
299
I assume this is the same mode for the recent NW schemes in England and not specific to Shotts?

I would imagine so - without checking the sectional appendix, the only "tilt active" route i have been involved in the the West Coast - the route need TASS transponders fitted lineside - plus there is a whole lot of pain with passing clearances, vehicle to vehicle clearances - not to mention clearances when the tilt mechanism fails - hence "passive mode"
 