Jorge Da Silva
Established Member
Planning to make a fantasy map of the CrossCountry Network and need some ideas. This is assuming all phases of NPR, HS2 and EWR are completed what services could be operated after capacity is free.
Good Luck with that!![]()
Glasgow/Edinburgh via WCML.
You've got very little chance with that one, although I agree it would be nice to see XC serve Brighton - possibly accessed via Kensington Olympia from the north?
I'd personally like to see Blackpool, Norwich, Dover, Scarborough, Portsmouth, Swansea and Wrexham/Holyhead served by XC but appreciate that not all of those stations are likely to see such services.
Norwich and Swansea could be possible but Blackpool and Scarborough I cannot see the need to add it in to the network. The others very difficult with capacity.
My suggestions are
- Hull (by diverting Newcastle services post-HS2)
- Liverpool
- Swansea
- Norwich
Possibly Blackpool and Scarborough during the summer and then 'as normal' during the winter.
That is based on more people holidaying at home after April 2019 (I won't mention that word in a non-politics thread!)
Never thought of Hull - that is a good shout!
Is there enough capacity post-HS2 for that?
Good point - might have to go over the Waverley![]()
Won’t you have a whole load of suggestions from all your previous similar threads?Planning to make a fantasy map of the CrossCountry Network and need some ideas. This is assuming all phases of NPR, HS2 and EWR are completed what services could be operated after capacity is free.
Blackpool, Liverpool, Bolton, LLandudno
Hull would be plausible via Leeds assuming a long Edinburgh via Doncaster/York.
Swansea is also entirely possible if pathing is appropriate.
Would be nice to see a regular service to Paignton to supplement the ‘stoppers’; even if only two-hourly as extension of the soon-to-be enhanced Exeters.
Not sure about Blackpool or Llandudno but post HS2 I doubt the Euston > Brum > Scotland will exist so perhaps a through service via Brum and Preston from somewhere like Bristol or Southampton can be done.
Liverpool seems the most obvious city missing.
Some services going via Worcester Shrub Hill could prove fruitful.
Portsmouth via Winchester and Fareham? Weymouth? Weston Super Mare (part of the two-hourly Exeter)?
Even one of the two ‘fast’ Reading - Oxford paths currently used for a GWR to Oxford given over to Cross Country (Chiltern MainLine can be used instead) to allow them to operate some form of Reading - Oxford - Bedford - Leicester - Nottingham or up towards Sheffield?
There use to be a service from Blackpool to Brighton. I think it had about 4tpd in each direction, and they called at Bolton and Piccadilly.Blackpool could be summer only, Liverpool could be hourly to Bristol and possibly hourly to Reading? Bolton and Llandudno probably not
There use to be a service from Blackpool to Brighton. I think it had about 4tpd in each direction, and they called at Bolton and Piccadilly.
The “Brighton service” was anything but. In the 2002/3 “Operation Princess” attempted timetable there were quite a number of trains extended to the east through Reading, variously to Portsmouth, Guildford, Gatwick and Brighton, over the course of the whole day, but Brighton only ever maxed out at 4 or 5 trains for that one timetable period. Portsmouth was withdrawn almost immediately in the post “Princess” retrenchment, Gatwick and Brighton were reduced gradually and then eventually withdrawn in 2008 because DfT considered the limited Brighton line capacity was better used for Southern, Thameslink and GWR services.Where did the other 4 go then? Was it Portsmouth? I read that there were 8tpd to Birmingham by Virgin CrossCountry
The “Brighton service” was anything but. In the 2002/3 “Operation Princess” attempted timetable there were quite a number of trains extended to the east through Reading, variously to Portsmouth, Guildford, Gatwick and Brighton, over the course of the whole day, but Brighton only ever maxed out at 4 or 5 trains for that one timetable period. Portsmouth was withdrawn almost immediately in the post “Princess” retrenchment, Gatwick and Brighton were reduced gradually and then eventually withdrawn in 2008 because DfT considered the limited Brighton line capacity was better used for Southern, Thameslink and GWR services.
AFAICT nothing has changed and any new proposals to re-extend XC East of Reading are pretty much a waste of time, even if trotted out here every few months, often by people who think they’re the only person ever to think of it.
To be clear I meant East to include both routes, via Wokingham and via Ealing and Kensington, rather than reversing and heading via Basingstoke to the south, but as you point out there’d be no capacity to the east.Thank you for the summary. Extending East of Reading is a stupid suggestion no capacity.
To be clear I meant East to include both routes, via Wokingham and via Ealing and Kensington, rather than reversing and heading via Basingstoke to the south, but as you point out there’d be no capacity to the east.
Just for completeness there’s currently no spare capacity for additional trains through Basingstoke towards Southampton or Bournemouth, however in the very unlikely event of additional rolling stock being available they could probably extend beyond the latter station.
Theoretically, but personally I’m not sure there’d be enough demand.Poole or Weymouth maybe?
Theoretically, but personally I’m not sure there’d be enough demand.
But who would operate the longer journeys such as Newcastle to Reading and Manchester to Bournemouth?My suggestion would involve just a blank piece of paper / computer screen, i.e. abolish XC and spread the services over other TOCs. (e.g. EM to take Birmingham - Leicester & East Anglian services)
Yes, could well be done at start and end of service, but bearing in mind if they still used Eastleigh depot overnight as now it would add to ECS miles.Surely a couple of trains per day would be enough?
Gatwick and Brighton were reduced gradually and then eventually withdrawn in 2008 because DfT considered the limited Brighton line capacity was better used for Southern, Thameslink and GWR services.
You've got very little chance with that one, although I agree it would be nice to see XC serve Brighton - possibly accessed via Kensington Olympia from the north?
I'd personally like to see Blackpool, Norwich, Swindon, Dover, Scarborough, Portsmouth, Swansea and Wrexham/Holyhead served by XC but appreciate that not all of those stations are likely to see such services.
Glasgow/Edinburgh via WCML.
Norwich and Swansea could be possible but Blackpool and Scarborough I cannot see the need to add it in to the network. The others very difficult with capacity.
My suggestions are
- Hull (by diverting Newcastle services post-HS2)
- Liverpool
- Swansea
- Norwich
Blackpool, Liverpool, Bolton, LLandudno
But who would operate the longer journeys such as Newcastle to Reading and Manchester to Bournemouth?