It was a bit before my time, but my recollection from family members is that 47/7 reliability was absolutely diabolical towards the end, bear in mind they would've been 25 years old with ten hard years on the E&G by then. Although to be fair they were probably well maintained and perky enough for most of the 1980s.
In fact my very earliest proper railway memory is being sent into a siding, which I now know to be the Newbridge loop, on an Edinburgh to Glasgow express probably in 1990, and overtaken many times until we were rescued by a following set and tipped out at Linlithgow.
I have a very clear recollection of the words of explanation drily delivered by the guard. 'This is due to a fault in the locomotive.'
Sadly that's my, possibly unfair, lasting image of the 47/7s.
Up until about 1988 they were about as reliable as a normal 47/4, after that while they were maintained as well as possible I think it became known they were getting replaced and so there perhaps wasn't the same level of impetus as before.
While we're reminiscing - I recall one journey north from Queen Street to Elgin on a push-pull set. My mother tends to be a nervous traveller and hates having to change trains, so when she found out there was a Glasgow - Inverness via Aberdeen run on a Sunday she made sure that was the train we caught on the way back from visiting grandparents. I'm fairly sure it was a blue/grey mk3 push-pull set (I'd been used to Mk2s, and this was something entirely different). The loco was definitely 47706 Strathclyde. I recall the section north of Dundee being quite exhilarating (was this bit 100mph?) with all the wee diddy stations flying past. I spent much of that journey with my head partially out of the window (Hindsight: not cool, don't try this, kids), and while the rest of those memories may have become a bit hazy as the years have progressed, my overwhelming recollection about that journey is of the old dear having a fit because my face was black with clag from the loco
Certainly in the late 1980s there was a booked Sunday Inverness-Aberdeen-Glasgow formed of a Mk2 air-con push-pull rake but booked for a 47/4. The Mk3 stock was all in ScotRail by 1985.
100mph was only authorised from May 1985 and only at that point on Edinburgh-Glasgow. From May 1986 it applied on Glasgow-Aberdeen as well. Until those dates the 47/7s were still 95mph machines, indeed if a 47/7 missed it 'special maintenance' as it were, it reverted to 95mph.
The 100mph sections in the 1980s are broadly as now, Dundee-Arbroath is mostly HST 100 and 47/7 push-pull sets were allowed to use these differentials at the time.
Worth remembering that the 47/7s were all converted from 47/4s, ie they were primarily passenger locos from new and as such had spent many hours/miles being worked hard at decent speeds even before entering the E&G maelstrom. It's actually a great credit to ScR maintenance staff that they performed as well as they did but also no surprise that they were rather tired by the time they were replaced by 158s on the route. Given that background it should have come as no surprise that they began to struggle on the WoE route; those 159s couldn't come soon enough!
They only managed as they did in Scotland because of the care and attention they were given.
A question about something though:
What were the extra pipes next to the fuel tanks for on the original push-pull batch?
Were they fuel or braking related?
Braking. They are part of the compressor cooling system for the air brakes. Normal 47s' compressors only ran when a key was in the desk, the 47/7s were modified so they would run without a key in, when in propelling mode. The compressors were running for longer and note frequently and thus getting hotter.
They were effectively part of an aftercooler to deal with excessive moisture build up which was causing failures, these were an addition, the first batch of locos didn't have them from conversion, the later batch did.
Nevertheless, it didn't succeed in increasing reliability as I understand it.