Charlie Smythe
Member
- Joined
- 18 Aug 2018
- Messages
- 704
I managed to catch 37800 and 755407 at a level crossing near Ely whilst out for a walk today:
https://twitter.com/mrpj100/status/1087012414435012618
Class 37's do look good in ROG livery.
I managed to catch 37800 and 755407 at a level crossing near Ely whilst out for a walk today:
https://twitter.com/mrpj100/status/1087012414435012618
I guessed that they must - just seems real life situations don't always reflect regulations. I know mark IIIs have generally had a loco or power car to help provide some protection in serious accidents so maybe that's giving a skewed idea as to crash worthiness? Still welded aluminium units don't seem to perform too well in accidents (guessing these are welded aluminium)?The Stadler FLIRTs comply with the latest most stringent crash worthiness regulations, the Marks 3s do not (through grandfather rights)....
And VW complied with emission regulations...The Stadler FLIRTs comply with the latest most stringent crash worthiness regulations, the Marks 3s do not (through grandfather rights)....
And VW complied with emission regulations...
Thanks for clarification, generally it was the older FLIRTs that I'd seen involved in accidents so obviously Stadler have improved the design since then. Nothing against the company just an observation from continental accidents that had involved Stadler trains (seemed unfortunate that many recent accidents had involved Stadlers as opposed to other types).The FLIRT 3 has a good crash construction. I would be more concerned if GA had ordered GTWs or the older FLIRT. In those trains, there is almost no protection for the driver, whereas with the FLIRT 3, the cab is inside the crash construction to prevent the cab from being greatly deformed.
Which doesn't mean that the cab provide enough security for a high speed head on collision with another train.
couldn't see the unit at Cambridge, I guess it had been shunted into the shed? There was an ROG class 37 in the reception sidings.
Thanks for clarification, generally it was the older FLIRTs that I'd seen involved in accidents so obviously Stadler have improved the design since then. Nothing against the company just an observation from continental accidents that had involved Stadler trains (seemed unfortunate that many recent accidents had involved Stadlers as opposed to other types).
would still rather take my chance in a mark III than one of these

It translates from german or Dutch to 'crash wall'.Well if nothing else, today was the day I learned of the word 'crashwand'![]()
It translates from german or Dutch to 'crash wall'.
There's a fair chance we passed each other! Given the loco was on the south end on arrival, and by the time I saw it it had white lights on the north end of the loco with electric units on either side, the only explanation is that the 755 had shunted, under its own power, to the shed.Same here - saw the ROG 37800 waiting to depart for Leicester, but no sign of the 755 (had a good look around from both the cycle bridge and Mill Road bridge).
It doesn't look like it's timed for 45mph Lakenheath-Ely North.
Very surprising especially as there's also a 40mph ESR just after Mile End too.With the Class 37 I would have thought it should be. However RTT seems to suggest it didn't lose time against the schedule.
With the Class 37 I would have thought it should be. However RTT seems to suggest it didn't lose time against the schedule.
The crash regs in the UK are more stringent than in Europe I seem to recall someone mentioning.
Roger Ford's monthly email available online at http://live.ezezine.com/ezine/archives/759/759-2019.01.21.04.02.archive.txt
says the Stadlers are late
"And now, Stadler is the new Hitachi, with high expectations for an immaculate entry into service with Greater Anglia.
But even Swiss precision cannot avoid delivery slippage with a new design. Originally due for completion by December 2019, the latest forecast is ‘by the end of Quarter 1 2020’." Doesnt make clear whether this is the bi-modes or the EMUs.
For reference the lease termination dates for DMUs are:
5x153 - 31 Aug 2019
9x2car156 - 30 Dec 2019
4x2car170 - 1 Oct 2019
8x3car170 - 1 Oct 2019
Presumably GA will be focussed on getting rid of Mk3s by the PRM deadline, and so will use any Stadler EMUs they have in service 1 Jan 2020 to replace the Mk3s and keep 379s on Stansted Express into 2020 - lease on 379s runs to 1 Aug 2020.
But who knows what will replace all the nonPRM 321s and 317s, that is for another thread
Not surprising, I think the current estimate is May which seems about right, further issues notwithstanding, versus an original expectation of Jan/Feb for the first unit back when the order was first announced. That email doesn't concern me much, at least not yet.Roger Ford's monthly email available online at http://live.ezezine.com/ezine/archives/759/759-2019.01.21.04.02.archive.txt
says the Stadlers are late
"And now, Stadler is the new Hitachi, with high expectations for an immaculate entry into service with Greater Anglia.
But even Swiss precision cannot avoid delivery slippage with a new design. Originally due for completion by December 2019, the latest forecast is ‘by the end of Quarter 1 2020’." Doesnt make clear whether this is the bi-modes or the EMUs.
For reference the lease termination dates for DMUs are:
5x153 - 31 Aug 2019
9x2car156 - 30 Dec 2019
4x2car170 - 1 Oct 2019
8x3car170 - 1 Oct 2019
Presumably GA will be focussed on getting rid of Mk3s by the PRM deadline, and so will use any Stadler EMUs they have in service 1 Jan 2020 to replace the Mk3s and keep 379s on Stansted Express into 2020 - lease on 379s runs to 1 Aug 2020.
But who knows what will replace all the nonPRM 321s and 317s, that is for another thread
Noticed today on a GA twitter response on the new trains they said new fleet will be introduced by 2021, so more slippage!
Some interesting photos can be seen at https://bahnbilder.ch/picture/31641 of a 745 (102) in the land of its birth. Click on the photo in the link to start then click on the arrow at the top right to view them all. There are a handful showing it being hauled by a SBB Re460.