One would hope (maybe over-optimistically) that once the software issues on the 710s are resolved, it ought to be quick to apply the fix(es) to other Aventras. Loading updated software should be quicker and easier than physical re-engineering (like the Hitachi windscreens).There have been photos of one in the wild, but I haven't seen any footage of it on the test track at Derby yet. I think Anglia are rightly aware that the 710 delay means 720s are not forthcoming any time soon so are focusing on the trains that are actually visible out testing on the network and have a good chance of actually being in service this year.
Ordinarily speaking, yes, hence why they aren't commonly used in the UK. Splitting the unit into six coupled sections, however, plus the lighter weight of modern designs, evidently means they can get away with it. That said, there were suggestions that the 755s would be given a lower speed limit on certain sections of track in rural areas due to the higher axle weight. I don't recall if that's going ahead.
This it the spec sheet Stadler have on their website for the 755: https://www.stadlerrail.com/media/pdf/feabmu0916e.pdfHow heavy is a 775? There aren't any kind of specs sheets or documents that I can find.
Except if those software updates also require hardware modifications.Loading updated software should be quicker and easier than physical re-engineering (like the Hitachi windscreens).
For all we associate Jacobs bogies with "continental" trains (mostly because of TGV and its derived designs, I think), it's worth noting that Gresley was an early enthusiast for them on the LNER. The Gresley Silver Jubilee coaches, which were designed to match the new A4 Pacific locomotives, consisted of two articulated pairs and one articulated triple, making for seven coaches with ten bogies.
Also the LNER third rail Tyneside Electrics trains in circa 1937 were articulated - I feel sure they were also articulated twins, like the present-day Tyneside metro trains which largely ply the same routes.
Exciting! Looking forward to seeing it.a 755 is due to move to Cambridge tomorrow for testing//commissioning, unit is due to stay there for 4 months and will eventually be joined by 4 other units.
Exciting! Looking forward to seeing it.
Is it running under its own power, or being dragged? Presumably the latter?Believe this will be the move/path for the unit.
http://www.realtimetrains.co.uk/tra...FTIoXYrP8y8SQP4WDhTt-frBwOo7ggLNztBomu6NclOMo
Is it running under its own power, or being dragged? Presumably the latter?
It doesn't look like it's timed for 45mph Lakenheath-Ely North.Is it running under its own power, or being dragged? Presumably the latter?
Is the nose cover off just for testing or will they operate like that in service?
There is no nose cover!Is the nose cover off just for testing or will they operate like that in service?
I thought the coupling would be covered when not in use. My bad!What nose cover? Looks normal to me.
That combination is quite a picture!755407 - photo taken by James Pilbeam
parked mostly out of sight between a GA 317 and a 700
View attachment 58189
Not sure if this has been covered previously but one thing that concerns me about Stadler units is their crash worthiness. They've been involved in a few accidents on the continent and never appeared to stand up too well. Maybe it's the nature of the incident and any other train would've suffered the same damage and sure they meet modern standards but would still rather take my chance in a mark III than one of these. Perhaps those in the know can prove me wrong?