• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Why weren’t 379s chosen for Heathrow?

Status
Not open for further replies.

TT-ONR-NRN

Veteran Member
Joined
30 Dec 2016
Messages
12,909
Location
Cambridge
This really confuses me.

379s and 387s are practically the same, except that 379s have a more premium interior.

So why didn’t Great Western Railway choose to take the thirty 379s for Heathrow Express instead of taking some of the 387s? The 379s are currently destined for the sidings and using these would mean they wouldn’t have a shortage of 387s for the stopping services, meaning the rather makeshift looking 769s would not have to be introduced. They’re so similar to 387s too, they wouldn’t be hard to maintain.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Agent_Squash

Established Member
Joined
22 Jul 2016
Messages
1,271
Already trained staff, 110mph and Crossrail was meant to be removing the shortage.
 

superalbs

Verified Rep - Superalbs Travels
Joined
3 Jul 2014
Messages
2,864
Location
Kraków
I think it would be much better, and could lessen GWR's need for 769s.

Btw, I would recommend this went in the Speculative Ideas section, but I am unsure whether you have the power to move it now.
 

43096

On Moderation
Joined
23 Nov 2015
Messages
18,895
This really confuses me.

379s and 387s are practically the same, except that 379s have a more premium interior.

So why didn’t Great Western Railway choose to take the thirty 379s for Heathrow Express instead of taking some of the 387s? The 379s are currently destined for the sidings and using these would mean they wouldn’t have a shortage of 387s for the stopping services, meaning the rather makeshift looking 769s would not have to be introduced. They’re so similar to 387s too, they wouldn’t be hard to maintain.
Because GWR have too many 387s in the longer term, once Crossrail takes over the majority of the stopping service.
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,955
Location
Mold, Clwyd
The 379 and 387 fleets have different owners (ROSCOs), and GWR only needs 14 units for Heathrow Express and will modify their 387s accordingly.
The 379s would not be guaranteed to be available from GA in time anyway.
With Crossrail delays it remains to be seen how the 345s are rolled out west of Paddington to free up the 387s.
The 379s will have to take their chances in the market when they come off-lease.
 

AndyW33

Member
Joined
12 Aug 2013
Messages
541
This really confuses me.

379s and 387s are practically the same, except that 379s have a more premium interior.

So why didn’t Great Western Railway choose to take the thirty 379s for Heathrow Express instead of taking some of the 387s? The 379s are currently destined for the sidings and using these would mean they wouldn’t have a shortage of 387s for the stopping services, meaning the rather makeshift looking 769s would not have to be introduced. They’re so similar to 387s too, they wouldn’t be hard to maintain.
The 379s would be really useful for the partly unelectrified routes the 769s are intended for, wouldn't they! Had the DfT not cancelled part of the GW electrification programme, the 379s might have found a role, as it is, the appearance of 387s on Heathrow services is a stopgap, these are meant to be operated by Crossrail, not GW, using Crossrail's own units. There will be ample 387s once Crossrail operates its full timetable.
 

JN114

Established Member
Joined
28 Jun 2005
Messages
3,530
the appearance of 387s on Heathrow services is a stopgap, these are meant to be operated by Crossrail, not GW, using Crossrail's own units.

Erm, no.

Heathrow Express services were never meant to be operated by crossrail.

Crossrail are now running their own services to Heathrow (former connect services) with Rolling stock they lease from Heathrow Airport.

387s on Heathrow Express services is enabled by Crossrail, but it isn’t because of Crossrail.
 

DanNCL

Established Member
Joined
17 Jul 2017
Messages
5,124
Location
County Durham
Put simply the reason is cost. GWR already have the 387s so there's no extra leasing costs for them. IIRC the 387s are getting some interior modifications before being used on the Heathrow Express, so they shouldn't be operating it with the current interior.
 

rebmcr

Established Member
Joined
15 Nov 2011
Messages
4,005
Location
St Neots
Do 379s even have ERTMS capability? That's a hard requirement.

Erm, no.

Heathrow Express services were never meant to be operated by crossrail

I think that depends how far in the future one looks, and whether one takes the official policy, or reads between the lines. Certainly the 387 fleet is intended to run services never intended to be Crossrail, at least for the next two years...
 

MatthewRead

On Moderation
Joined
21 Nov 2014
Messages
1,643
Location
West london
This really confuses me.

379s and 387s are practically the same, except that 379s have a more premium interior.

So why didn’t Great Western Railway choose to take the thirty 379s for Heathrow Express instead of taking some of the 387s? The 379s are currently destined for the sidings and using these would mean they wouldn’t have a shortage of 387s for the stopping services, meaning the rather makeshift looking 769s would not have to be introduced. They’re so similar to 387s too, they wouldn’t be hard to maintain.
Not necessarily 379's might end up on the Midland Main line working services to Corby.
 

43074

Established Member
Joined
10 Oct 2012
Messages
2,253
That’s a huge fantasy.

Why? They come off lease by August 2020 and the Corby electric timetable is supposed to start in December 2020, they would be the logical option in many ways (although clearly it depends what options bidders for the new franchise come up with).
 

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
18,359
Location
Glasgow
This really confuses me.

379s and 387s are practically the same, except that 379s have a more premium interior.

So why didn’t Great Western Railway choose to take the thirty 379s for Heathrow Express instead of taking some of the 387s? The 379s are currently destined for the sidings and using these would mean they wouldn’t have a shortage of 387s for the stopping services, meaning the rather makeshift looking 769s would not have to be introduced. They’re so similar to 387s too, they wouldn’t be hard to maintain.

I would say the primary reasons are:

Common fleet - maintainance and traction knowledge.

110mph running, 379s are 100mph IIRC though it is possible they could be uprated with minimal work.
 

TT-ONR-NRN

Veteran Member
Joined
30 Dec 2016
Messages
12,909
Location
Cambridge
Interiors are easily changeable. The units that will be dedicated to HEx services will have altered interiors to make them suitable for HEx work.
Let’s face it though, the Heathrow Express sets aren’t going to lose the ironing board seats are they?
 

TT-ONR-NRN

Veteran Member
Joined
30 Dec 2016
Messages
12,909
Location
Cambridge
Are they really going to replace the entire interior? The reported changes on here have suggested some minor tweaks and the addition of First Class.
And this addition of first class will almost DEFINITELY be the same seat. Almost definitely. Think Gatwick Express, it’ll be just like that. (Another huge downgrade)
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,951
Location
"Marston Vale mafia"
Are they really going to replace the entire interior? The reported changes on here have suggested some minor tweaks and the addition of First Class.

Given GatEx, I'd expect "the addition of First Class" to mean "the addition of antimacassars to a few rows of seats", personally.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,773
Location
Nottingham
Heathrow Express has always been upmarket compared with the other airport shuttles, mainly because Heathrow is mostly full-service airlines where Gatwick and Stansted are dominated by no-frills. The last refurbishment of the 332s made them even more luxurious.

Having a bog-standard interior removes what will be for most people the only reason to choose HEx over Crossrail, given that the latter will cancel out the journey time benefit for those continuing east of Paddington.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,951
Location
"Marston Vale mafia"
Having a bog-standard interior removes what will be for most people the only reason to choose HEx over Crossrail, given that the latter will cancel out the journey time benefit for those continuing east of Paddington.

Then HEx can be left to die, and the paths and EMUs used for something useful, e.g. 4tph non-stop 12-car EMU Paddington to Reading, then the commuters can finally be banned from the 800s and the overcrowding issue finally end.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,773
Location
Nottingham
Then HEx can be left to die, and the paths and EMUs used for something useful, e.g. 4tph non-stop 12-car EMU Paddington to Reading, then the commuters can finally be banned from the 800s and the overcrowding issue finally end.
Well yes, I think something like that will happen eventually, but the people specifying HEx will want a different outcome!
 

Starmill

Veteran Member
Joined
18 May 2012
Messages
27,364
Location
Bolton
Then HEx can be left to die, and the paths and EMUs used for something useful, e.g. 4tph non-stop 12-car EMU Paddington to Reading, then the commuters can finally be banned from the 800s and the overcrowding issue finally end.
Haven't they just signed a 10 year contract to operate Heathrow Express?
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,951
Location
"Marston Vale mafia"

ainsworth74

Forum Staff
Staff Member
Global Moderator
Joined
16 Nov 2009
Messages
31,142
Location
Redcar
Haven't they just signed a 10 year contract to operate Heathrow Express?
They have but if it starts to haemorrhage money how long will it be before Heathrow or GWR decide to throw in the towel and terminate the contract?

One can only hope that this move does finish off HEx so we can use the paths for something more useful.
 

cactustwirly

Established Member
Joined
10 Apr 2013
Messages
8,430
Location
UK
Put simply the reason is cost. GWR already have the 387s so there's no extra leasing costs for them. IIRC the 387s are getting some interior modifications before being used on the Heathrow Express, so they shouldn't be operating it with the current interior.

Erm no! There isn't the depot capacity at Reading for extra 379s and there will be a surplus of 387s once Crossrail operates to Reading.
 

cactustwirly

Established Member
Joined
10 Apr 2013
Messages
8,430
Location
UK
They have but if it starts to haemorrhage money how long will it be before Heathrow or GWR decide to throw in the towel and terminate the contract?

One can only hope that this move does finish off HEx so we can use the paths for something more useful.

But it won't haemorrhage money, even after Crossrail!
Heathrow has a lot of business travellers and rich tourists from China & America etc, who'll prefer to use HEx.

I'm not sure what you'd replace HEx with, as the paths aren't available to Reading.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,773
Location
Nottingham
Erm no! There isn't the depot capacity at Reading for extra 379s and there will be a surplus of 387s once Crossrail operates to Reading.
Presumably the spare 387s could have been replaced by 379s if that was thought to be the best course of action. But there are several reasons why it obviously isn't:
  • 387s already on lease, so someone is paying for them whether used or not.
  • 379s not yet released from Stansted, release date presumably depends on the smooth introduction of FLIRTs, but it's critical to replace the 332s so their depot can close and make way for HS2.
  • No good reason to have Reading depot dealing with two different classes, even if they are very similar.
  • No good reason to re-certify the 379s for 100mph.
What joins the GWML fast lines between Heathrow Junction and Reading which would cause them not to be available?
I think the issue is that when a 100mph HEx leaves the GWML at Heathrow Junction there is a 125mph HST/IET close behind it. If it carried on to Reading it would delay that following train (and similarly in the opposite direction). Replacing the 332 by a 110mph 387 would help a bit, but probably not enough to create a path all the way. This logic suggests there might be Reading paths available if more 125mph units can be used.
 

Starmill

Veteran Member
Joined
18 May 2012
Messages
27,364
Location
Bolton
They have but if it starts to haemorrhage money how long will it be before Heathrow or GWR decide to throw in the towel and terminate the contract?
Oh no no absolutely. I completely agree. But given the contract was signed just a matter of months ago the Airport management must be confident in their financials in the short term at the very least, so I was pointing out it's much more a case of 'wait and see' than tje foregone conclusion many seem to jump to when Heathrow Express is brought up.
 
Status
Not open for further replies.

Top