• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Arriva Rail North DOO

Status
Not open for further replies.

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,379
Location
"Marston Vale mafia"
It is indeed, and probably highlights that the only service in Northernland that would justify genuine DOO i.e. with no second member of staff even for revenue is probably Metrolink, which is of course already DOO (or Merseyrail, which appears to have an agreement based on a second member of staff with no actual role thus far). Might be justified on the Hadfields at a push, but for the rest OBS is probably going to work quite well.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Ken H

Established Member
Joined
11 Nov 2018
Messages
6,718
Location
N Yorks
The Aire Valley (as well as the Wharfe) route is now a Penalty Fare line, with TVMs at all stations along the route & passengers are expected to buy a ticket, or obtain a 'Promise To Pay' if they don't have a suitable payment card & buy onboard. This will be the norm across the entire Northern network in the coming months. There is a separate thread on this subject, where the application of it can be discussed in more detail. There are however now barriers at Leeds (and have been for some time), as well as both Bradford stations and many others (not sure about Skipton, its been a while since I've been through there). Most others remain un-barriered, however semi-regular checks are made by Revenue Protection teams who move from station to station, as well as having routine checks at some.

Skipton has barriers

Settle has a TVM
 

Shaw S Hunter

Established Member
Joined
21 Apr 2016
Messages
3,495
Location
Over The Hill
The hold up to the training programme has nothing to do with DOO.

Thanks for the corrective update. However it (Northern's position) is full of apparent contradictions.

It hasn't even been discussed with ASLEF. Northern tried to include responsibility for SDO but this was rejected by ASLEF and is now in the guards training package.

Not sure how you can include SDO training using controls on the cab desk without making reference to DOO: those controls are there for a reason!

The training programme was agreed with ASLEF. The sticking point is that Northern are now saying the training programme (and agreed payments for undertaking training on rest days) only applies to fully qualified drivers (non PQA) and newly qualified drivers will get less.

How can some drivers receive more training than others? A basic principle of railway training is that you are either competent or not, there is no partial competence.

Also as the training needs to be over 7 consecutive days (5 days if not signing both 331s and 195s) there is debate over whether drivers can be forced to work rest days to cover this even if it's been agreed with ASLEF is there anything the company can do if individual drivers refuse it?

Does this mean that the specific traction instructors will have to work 7 days a week for the duration of the training programme? What am I missing?

There are also some minor details regarding travel and lodging agreements for specific depots to be resolved.

Lodging issues are not new, they arise every time a new recruit for a "remote" depot enters the training school. The costs (and other implications) would surely have been included in the franchise bid so why are they an issue now?

At the moment ASLEF are in a 'fail to agree' position with the company, although that could escalate to industrial action this is unlikely as it's in Northerns interest to resolve it quickly.

Are Northern really interested in resolving the issues? ISTM quite possible that they still hope that RMT will give up their opposition before any talks with ASLEF are necessary. In fact we may even end up with lots of shiny new trains laid up in sidings all over the Northern network while passengers continue to suffer both overcrowding and continued use of the hated Pacers all because there is an unwillingness on the part of Northern/DfT to actually resolve the dispute through a negotiated settlement.

None of the new trains have been signed off yet so training cannot even begin with an agreement. The latest ive heard is very limited introduction in March (not diagrammed) with more from May. Northern are still misinforming passengers on Twitter though that these trains will be introduced this year!

Sadly it seems that clear and open communication is an alien concept to Northern under Arriva.

It is indeed, and probably highlights that the only service in Northernland that would justify genuine DOO i.e. with no second member of staff even for revenue is probably Metrolink, which is of course already DOO (or Merseyrail, which appears to have an agreement based on a second member of staff with no actual role thus far). Might be justified on the Hadfields at a push, but for the rest OBS is probably going to work quite well.

Not the first time you have made such a suggestion but it makes no sense. Hadfield/Glossop route has a basic half-hourly service just as on many other Northern routes. Using your parameters the Leeds "triangle" is a much better candidate.
 

LowLevel

Established Member
Joined
26 Oct 2013
Messages
8,912
The RMT have issued a statement saying they will suspend this weekend's action if Northern agree that -

100% of trains will run with a second on board crew member, no exceptions

The second crew member will be safety critical

The second crew member will be involved in the dispatch of the train/platform train interface.

It sounds like they're angling for a deal along the lines of ScotRail (and why shouldn't they, I suppose) and to try and pull what the company are really after out into the open whether they accept that as a basis for talks or not.

Presumably using the principle that TfN have stated they expect a deal to be made and for changes to a contract to be looked at as a result if required.
 

scrapy

Established Member
Joined
15 Dec 2008
Messages
2,304
Thanks for the corrective update. However it (Northern's position) is full of apparent contradictions.



Not sure how you can include SDO training using controls on the cab desk without making reference to DOO: those controls are there for a reason!



How can some drivers receive more training than others? A basic principle of railway training is that you are either competent or not, there is no partial competence.



Does this mean that the specific traction instructors will have to work 7 days a week for the duration of the training programme? What am I missing?



Lodging issues are not new, they arise every time a new recruit for a "remote" depot enters the training school. The costs (and other implications) would surely have been included in the franchise bid so why are they an issue now?



Are Northern really interested in resolving the issues? ISTM quite possible that they still hope that RMT will give up their opposition before any talks with ASLEF are necessary. In fact we may even end up with lots of shiny new trains laid up in sidings all over the Northern network while passengers continue to suffer both overcrowding and continued use of the hated Pacers all because there is an unwillingness on the part of Northern/DfT to actually resolve the dispute through a negotiated settlement.



Sadly it seems that clear and open communication is an alien concept to Northern under Arriva.



Not the first time you have made such a suggestion but it makes no sense. Hadfield/Glossop route has a basic half-hourly service just as on many other Northern routes. Using your parameters the Leeds "triangle" is a much better candidate.
I never suggested some drivers receive more training than others. Northern considers a driver as fully qualified after 3 years. Before that time they are still competent and have had full training. There are some differences though for example they can't have route learners in the cab and get paid less.

It's unlikely instructors will have to work 7 days consecutive, different aspects of the training will probably be with different instructors, it's the drivers being instructed that will do a one off 7 consecutive days.

The issues with ASLEF are totally unrelated to the RMT and Northern will be wanting to resolve them and get the new trains in service. As said issues regarding lodging and travel are only minor.
 

northwichcat

Veteran Member
Joined
23 Jan 2009
Messages
32,692
Location
Northwich
The RMT have issued a statement saying they will suspend this weekend's action if Northern agree that -

100% of trains will run with a second on board crew member, no exceptions

The second crew member will be safety critical

The second crew member will be involved in the dispatch of the train/platform train interface.

It sounds like they're angling for a deal along the lines of ScotRail (and why shouldn't they, I suppose) and to try and pull what the company are really after out into the open whether they accept that as a basis for talks or not.

Presumably using the principle that TfN have stated they expect a deal to be made and for changes to a contract to be looked at as a result if required.

So in short they want more than what they settled for on Merseyrail, despite previously saying it was ludicrous they had come to an agreement with Merseyrail but not with Northern.
 

Shaw S Hunter

Established Member
Joined
21 Apr 2016
Messages
3,495
Location
Over The Hill
How does this:
I never suggested some drivers receive more training than others. Northern considers a driver as fully qualified after 3 years. Before that time they are still competent and have had full training. There are some differences though for example they can't have route learners in the cab and get paid less.
reconcile with this:
The sticking point is that Northern are now saying the training programme (and agreed payments for undertaking training on rest days) only applies to fully qualified drivers (non PQA) and newly qualified drivers will get less.

Is it that Northern intend to pay PQA drivers less for the training rather than giving them less actual training?
 

Sonic1982

Member
Joined
22 Dec 2017
Messages
8
So in short they want more than what they settled for on Merseyrail, despite previously saying it was ludicrous they had come to an agreement with Merseyrail but not with Northern.
How do you know what’s been agreed with Merseyrail no details of the deal agreed in principle have been announced yet.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,379
Location
"Marston Vale mafia"
The RMT have issued a statement saying they will suspend this weekend's action if Northern agree that -

100% of trains will run with a second on board crew member, no exceptions

The second crew member will be safety critical

The second crew member will be involved in the dispatch of the train/platform train interface.

It sounds like they're angling for a deal along the lines of ScotRail (and why shouldn't they, I suppose) and to try and pull what the company are really after out into the open whether they accept that as a basis for talks or not.

Presumably using the principle that TfN have stated they expect a deal to be made and for changes to a contract to be looked at as a result if required.

So that means driver release is now acceptable? If so I'd suggest Northern should go for that. It'd at least give an improvement in running times on stopping services and improve the effectiveness of on-board revenue protection.
 

30907

Veteran Member
Joined
30 Sep 2012
Messages
21,950
Location
Airedale
The RMT have issued a statement saying they will suspend this weekend's action if Northern agree that -

100% of trains will run with a second on board crew member, no exceptions

The second crew member will be safety critical

The second crew member will be involved in the dispatch of the train/platform train interface.

It sounds like they're angling for a deal along the lines of ScotRail (and why shouldn't they, I suppose) and to try and pull what the company are really after out into the open whether they accept that as a basis for talks or not.

Presumably using the principle that TfN have stated they expect a deal to be made and for changes to a contract to be looked at as a result if required.

The Bradford T and A reports the third precondition as below
https://www.thetelegraphandargus.co.uk/news/17264400.amp/?__twitter_impression=true

"3. That the second member of staff will retain the full suite of safety and operational competencies of the guard, including a direct role at the platform/train interface and train despatch."

To me, that makes them a Guard by another name, and I am not sure whether they are agreeing Driver Release or not. Others who know the detail will no doubt correct me.
 

Robertj21a

On Moderation
Joined
22 Sep 2013
Messages
7,691
The RMT have issued a statement saying they will suspend this weekend's action if Northern agree that -

100% of trains will run with a second on board crew member, no exceptions

The second crew member will be safety critical

The second crew member will be involved in the dispatch of the train/platform train interface.

It sounds like they're angling for a deal along the lines of ScotRail (and why shouldn't they, I suppose) and to try and pull what the company are really after out into the open whether they accept that as a basis for talks or not.

Presumably using the principle that TfN have stated they expect a deal to be made and for changes to a contract to be looked at as a result if required.


I'm struggling to see any real change from their stated position - or is it just simply that the driver may release the doors ?
 

northwichcat

Veteran Member
Joined
23 Jan 2009
Messages
32,692
Location
Northwich
How do you know what’s been agreed with Merseyrail no details of the deal agreed in principle have been announced yet.

The agreement is nothing more than a person in Merseyrail uniform on the train, any duties or training that person will have are dependent on how much Merseyrail/travel can get by increasing fares, cutting costs elsewhere and cracking down on fare evasion.
 

Killingworth

Established Member
Joined
30 May 2018
Messages
6,474
Location
Sheffield
The RMT have issued a statement saying they will suspend this weekend's action if Northern agree that -

100% of trains will run with a second on board crew member, no exceptions

The second crew member will be safety critical

The second crew member will be involved in the dispatch of the train/platform train interface.

It sounds like they're angling for a deal along the lines of ScotRail (and why shouldn't they, I suppose) and to try and pull what the company are really after out into the open whether they accept that as a basis for talks or not.

Presumably using the principle that TfN have stated they expect a deal to be made and for changes to a contract to be looked at as a result if required.

To bring all into the open RMT's full statement is here;" https://www.rmt.org.uk/news/rmt-off...dzAv4bkZ8R5pSvVne7r8DBac2DMDNDvNJmZ3PAgSIHj60 "

Doesn't give much time to get a full service up and running for this Saturday!
 
Last edited:

Carlisle

Established Member
Joined
26 Aug 2012
Messages
4,509
I'm struggling to see any real change from their stated position - or is it just simply that the driver may release the doors ?
Yes it’s not very clear whether the RMT is offering the chance of a similar deal to the Greater Anglia one or nothing more than driver release guard close
 

Ken H

Established Member
Joined
11 Nov 2018
Messages
6,718
Location
N Yorks
Yes it’s not very clear whether the RMT is offering the chance of a similar deal to the Greater Anglia one or nothing more than driver release guard close

Driver release guard close would be a major step forward. The number of times I have stood when the train has stopped waiting for the doors to open...* Getting this would mean we could probably cut time out of schedules. and speed elasticity would mean more passengers -and more revenue. Ian Walmsley rants about this a fair bit. Combine that with allowing the door opening sequence to start when the train is doing (say) 3mph.

Cross city line trains at New St, and at Worcester Foregate St seem to be worst in my experience.
 

Shaw S Hunter

Established Member
Joined
21 Apr 2016
Messages
3,495
Location
Over The Hill
Driver release guard close would be a major step forward. The number of times I have stood when the train has stopped waiting for the doors to open...* Getting this would mean we could probably cut time out of schedules. and speed elasticity would mean more passengers -and more revenue. Ian Walmsley rants about this a fair bit. Combine that with allowing the door opening sequence to start when the train is doing (say) 3mph.

Cross city line trains at New St, and at Worcester Foregate St seem to be worst in my experience.

Guards are free to key in to the DKS before the train stops. In fact it used to be common practice on some units for the DKS to be left active almost continuously during a journey. The speed is a non-factor, it's down to the door operator being available in good time. If drivers take that role then the availability question is dealt with. But in the contemporary safety culture there can be no question of a door open sequence starting before the train stops: the essential first stage in the process is to confirm the train is not only stopped but stopped at a safe position. This is just as true for automated, even driverless, systems.
 

Ken H

Established Member
Joined
11 Nov 2018
Messages
6,718
Location
N Yorks
Guards are free to key in to the DKS before the train stops. In fact it used to be common practice on some units for the DKS to be left active almost continuously during a journey. The speed is a non-factor, it's down to the door operator being available in good time. If drivers take that role then the availability question is dealt with. But in the contemporary safety culture there can be no question of a door open sequence starting before the train stops: the essential first stage in the process is to confirm the train is not only stopped but stopped at a safe position. This is just as true for automated, even driverless, systems.
so how does 'start door opening before train stops' work on Berlin S-bahn? is that intrinsically unsafe?
 

northwichcat

Veteran Member
Joined
23 Jan 2009
Messages
32,692
Location
Northwich
so how does 'start door opening before train stops' work on Berlin S-bahn? is that intrinsically unsafe?

Surely that depends on the platform length compared to the train length. If the train is almost as long as the platform the doors can't be released before the train has come to a complete stop, otherwise people would be alighting where there's no platform.

As you've brought up German S-Bahn systems another thing worth considering on Munich S-Bahn at the city centre stops the doors are opened on both sides, with passengers exiting the train supposed using the doors on one side and those boarding the train using the doors on the other side. If I recall correctly the alighting doors are closed while passengers are still boarding the other side.
 

northwichcat

Veteran Member
Joined
23 Jan 2009
Messages
32,692
Location
Northwich
Wont happen Northern wont guarantee that. Otherwise there would be no point to these talks. So it will be strike as usual on Saturday.

If the strikes were called off (which would be unprecedented given the RMT's current demands), how many of the guards will have to cancel their current plans for Saturday? (I'm sure a large number aren't planning to spend their Saturday on a cold picket line.)
 

Gems

Member
Joined
10 Nov 2018
Messages
656
Wont happen Northern wont guarantee that. Otherwise there would be no point to these talks. So it will be strike as usual on Saturday.
No they wont guarantee that. But at least it opens the door to finding out what it is exactly they do want, because at this moment in time, nobody has a clue.
 

Ken H

Established Member
Joined
11 Nov 2018
Messages
6,718
Location
N Yorks
Surely that depends on the platform length compared to the train length. If the train is almost as long as the platform the doors can't be released before the train has come to a complete stop, otherwise people would be alighting where there's no platform.

As you've brought up German S-Bahn systems another thing worth considering on Munich S-Bahn at the city centre stops the doors are opened on both sides, with passengers exiting the train supposed using the doors on one side and those boarding the train using the doors on the other side. If I recall correctly the alighting doors are closed while passengers are still boarding the other side.

Ive only used berlin S-bahn. I am sure there the doors only open 1 side at the stations I have used or passed through. The PIS in each car has little arrows to say which side next stop. All the trains seem to be the same length so everything fits, but its mostly new, having been upgraded as part of reunification. (Except for Warschauer Straße S-Bahn which is a dogs breakfast, but I think they are fixing it now) Maybe its easier to do early door opening with proper kit.
 

furnessvale

Established Member
Joined
14 Jul 2015
Messages
4,906
Understand the cynicism but the insinuation was not there (unless I am insinuating all of us are money grabbers).
I reckon any worker asked to take more work and/or responsibility is going to ask if there is more money (or career acceleration), and if there isn’t will be pondering whether they can be bothered.
So the money option is kind of the middle ground between not wanting to do it and actively fancying a bit more responsibility/workload.
There are many jobs in this country where such an attitude is a direct route to a P45.
 

LowLevel

Established Member
Joined
26 Oct 2013
Messages
8,912
If the strikes were called off (which would be unprecedented given the RMT's current demands), how many of the guards will have to cancel their current plans for Saturday? (I'm sure a large number aren't planning to spend their Saturday on a cold picket line.)

Given the Government restricts a picket to 6 or so people it's hard to see what they're expected to do, have all three figure guards at Manchester Victoria turn up and get arrested? :rolleyes:
 

northwichcat

Veteran Member
Joined
23 Jan 2009
Messages
32,692
Location
Northwich
Given the Government restricts a picket to 6 or so people it's hard to see what they're expected to do, have all three figure guards at Manchester Victoria turn up and get arrested? :rolleyes:

If the RMT organised a picket at every station Northern serve they could have over 3000 guards on picket lines simultaneously even with the 6 per picket restriction.
 

LowLevel

Established Member
Joined
26 Oct 2013
Messages
8,912
If the RMT organised a picket at every station Northern serve they could have over 3000 guards on picket lines simultaneously even with the 6 per picket restriction.

Wrong again. You may only picket at your normal place of work. On the railway this is taken to be your home station or other workplace. I doubt anyone would be bothered if 6 people did turn up to picket Gainsborough Central but they'd still be in breach of the picketing code of practice.

Could we cut the snipey comments somewhat? It doesn't do anything for the discussion at hand.
 

Shaw S Hunter

Established Member
Joined
21 Apr 2016
Messages
3,495
Location
Over The Hill
so how does 'start door opening before train stops' work on Berlin S-bahn? is that intrinsically unsafe?

Are you referring to traditional German/European stock which typically has a central door locking system which activates only above a low speed? Because such a system certainly does not conform to our safety standards!
 
Status
Not open for further replies.

Top