Even then, with trains going through Victoria, rather than blocking it, we're hardly talking Borough Market Junction.
We're not. Borough Market Jn isn't constrained by through platform capacity and dwell times. Manchester Victoria is.
Even then, with trains going through Victoria, rather than blocking it, we're hardly talking Borough Market Junction.
If it goes down the Mid-Cheshire Line, it'll terminate at either Knutsford or Northwich. Mobberley is just too far out of the way to be used as a terminus.https://i.imgur.com/gzuJFQQ.png
Some suggestions here, I know not all (if any) happen but it has a few options.
Fun fact: with that proposal, it would be possible to go from Salford Red's old stadium (what's left of it) to their new one on one tram.
We're not. Borough Market Jn isn't constrained by through platform capacity and dwell times. Manchester Victoria is.
Currently the three off-peak services on the Atherton line, all hourly, are Southport to Leeds via Brighouse (semi-fast), Southport to Blackburn via Todmorden (semi-fast) and Kirkby to Victoria (all stations). When the fourth service starts next May, I believe it will be Wigan Wallgate to Victoria (all stations).As I mentioned, there are now far better opportunities to turn bacck beyond Victoria (which, admittedley should have kept its six through platforms).
Currently the three off-peak services on the Atherton line, all hourly, are Southport to Leeds via Brighouse (semi-fast), Southport to Blackburn via Todmorden (semi-fast) and Kirkby to Victoria (all stations). When the fourth service starts next May, I believe it will be Wigan Wallgate to Victoria (all stations).
The turnbacks at Rochdale and Stalybridge currently reverse 2tph each, which I believe is their design capacity. The services are Clitheroe to Rochdale via Bolton, Blackburn to Rochdale via Bolton, Wigan Northwestern to Stalybridge via Bolton and Victoria to Stalybridge via Bolton.
I believe the two Atherton line stoppers have to terminate at Victoria because there is no suitably timed service to the east that they could be linked with.
Even so, I'm sure with all the surplus land to the East of Victoria it wouldn't be beyond the wit of man to install a turnback siding somewhere if things were that desperate.
My preferred choice would be terminating at Heywood, making use of the former double track aliagnment on the link between the ELR and NR to build a seperate paralell single track terminating a 1 platform NR station. The Greater Manchester Combined Authority wants to link up the remaining 3 GM towns without either Metrolink or a Railway station. A Metrolink line to Crumpsall is currently being assessed for Middleton and there was was a report about 5 years ago about reconnecting Leigh to the rail network. A Parkway station or a new link to Chat Moss line is more likely than ripping up the guided busway. I would have thought heavy rail for Heywood would be cheaper than extending Metrolink further. Capacity to turnback an extra 2tph east of Victoria would be useful too.
My preferred choice would be terminating at Heywood, making use of the former double track aliagnment on the link between the ELR and NR to build a seperate paralell single track terminating a 1 platform NR station. The Greater Manchester Combined Authority wants to link up the remaining 3 GM towns without either Metrolink or a Railway station. A Metrolink line to Crumpsall is currently being assessed for Middleton and there was was a report about 5 years ago about reconnecting Leigh to the rail network. A Parkway station or a new link to Chat Moss line is more likely than ripping up the guided busway. I would have thought heavy rail for Heywood would be cheaper than extending Metrolink further. Capacity to turnback an extra 2tph east of Victoria would be useful too.
Hasn't the guided busway been designed in a way to facilitate conversion to light rail ? (Not a rhetorical question)
Southport trains can run via Bolton (as they indeed used to for many years),
Personally, I'd confine metrolink expansion to minor extensions - most obviously, East Didsbury to Stockport, and instead build a heavy rail tunnel from Piccadilly - not to Victoria, but to Salford Central/Salford Crescent with a new underground station somewhere around Market Street. And use that to revitalise the existing heavy lines, improving frequencies and ensuring most heavy rail metro routes can take people right into central Manchester. Also electrification of all non-electrified metro routes and redoubling/new stations as appropriate (Stockport to Altrincham, anyone?). Yes, I know that's a whole new ballpark of cost to build, but it'd give a much better step-change in public transport in the area.
I'd also look at options for building a limited stop rail line from the new tunnel to Bury and beyond in order to improve travel times from Bury to Manchester. Maybe you could do that with the link from Bury to Rochdale and a new chord, though that would not permit running into the Piccadilly-Salford tunnel.
The way to cut costs and improve city centre penetration is to convert more heavy rail lines to light rail in Britain's cities, not just in M/c. A scheme has now been approved for the Taff Vale lines in South Wales, and there are potential conversions in Glasgow, the West Midlands, the West Riding and South London. Other possible examples include Hucknall-Worksop, Squires Gate-Kirkham, Watford-St Albans, Bristol-Severn Beach and Exeter-Exmouth.
A rail tunnel under M/c is unaffordable and will encounter geological issues, the reasons why the Picc-Vic scheme of the 1970s was abandoned.
Given the capacity constraints on the existing tram lines in the city centre, as several services currently terminate at Piccadilly, conversion of the south-easterm suburban rail lines, in particular those to Marple Rose Hill and Hadfield/Glossop, should be the next priority for Metrolink expansion. There is a four line track bed as far as Guide Bridge, so existing rail services could be maintained from Piccadilly to Guide Bridge with no intermediate stops and then onwards to Stalybridge and beyond, or to New Mills Central and beyond via Woodley.
Other potential extensions are from Crumpsall/Bowker Vale to Middleton (and possibly Heywood), and from the Trafford Centre to Port Salford. I don't think the demand exists for the shelved western part of the Wythenshawe loop and am uncertain of the benefit of extending from East Didsbury to Stockport town centre.
There is insufficient demand for routes linking the outer ring of towns on the edge of Greater Manchester, most of which have decaying town centres that are not sufficient traffic generators in their own right.
Personally, I'd confine metrolink expansion to minor extensions - most obviously, East Didsbury to Stockport, and instead build a heavy rail tunnel from Piccadilly - not to Victoria, but to Salford Central/Salford Crescent with a new underground station somewhere around Market Street. And use that to revitalise the existing heavy lines, improving frequencies and ensuring most heavy rail metro routes can take people right into central Manchester. Also electrification of all non-electrified metro routes and redoubling/new stations as appropriate (Stockport to Altrincham, anyone?). Yes, I know that's a whole new ballpark of cost to build, but it'd give a much better step-change in public transport in the area.
I'd also look at options for building a limited stop rail line from the new tunnel to Bury and beyond in order to improve travel times from Bury to Manchester. Maybe you could do that with the link from Bury to Rochdale and a new chord, though that would not permit running into the Piccadilly-Salford tunnel.
I think only in terms of layout and foundations. It would need replacing for Metrolink. The biggest problem would be linking it to the rest of Metrolink at an affordable cost and building sufficient capacity in the city centre. Atherton has a station and Leigh would be better served by a link to Chat Moss which would provide conections to Liverpool and a much faster journey into Manchester. I think the guided busway gets a excessive criticism, it does the job it was designed for and at an affordable cost. Its clearly worse than a railway or tram line but it was built for a fraction of the cost and would be complemented by a rail link serving different markets.
The east end of the busway is currently separated from Metrolink at Eccles by a few miles of what seems to be unobstructed ex-railway alignment, and about a mile of street running in Eccles itself. One of the reasons light rail is meant to be so wonderful is because it is cheaper than heavy rail. If we cannot manage to buuld a light rail.line along the Leigh alignment, we might as well give up on building anything in this country.
Northwich, instead of the proposed Northern stopper
Wigan Wallgate via Atherton? Hadfield/Glossop? Rose Hill Marple?
The 319's have 750V DC contact shoes & a 25KV AC pantograph, so I'm sure a dual voltage tram-train could be made with 750 DC & 25KV AC pantograph's.which could still create a complication if Network Rail want the option of electrifying Stockport-Altrincham as AC and would mean Altrincham loses its' direct services to Victoria.
The problem with connecting it to the Eccles line is that it is ridiculously slow. Really it was a Salford Quays line that was extended to Eccles because external EU funding was forthcoming due to Eccles being deprived.
It is (quite substantially) faster to take the bus from Eccles to Manchester than the tram.
The 319's have 750V DC contact shoes & a 25KV AC pantograph, so I'm sure a dual voltage tram-train could be made with 750 DC & 25KV AC pantograph's.
I think you missed the pantograph's at the end.Bi-mode tram-train options have been looked at before. Diesel only or Diesel and electric were seen as not a good option which is one reason the proposal to run tram-trains from Huddersfield to Sheffield didn't happen. Having tram-trains which operate off both overheads and third rail was also seen as a poor option.
The way to cut costs and improve city centre penetration is to convert more heavy rail lines to light rail in Britain's cities, not just in M/c. A scheme has now been approved for the Taff Vale lines in South Wales, and there are potential conversions in Glasgow, the West Midlands, the West Riding and South London. Other possible examples include Hucknall-Worksop, Squires Gate-Kirkham, Watford-St Albans, Bristol-Severn Beach and Exeter-Exmouth.
A rail tunnel under M/c is unaffordable and will encounter geological issues, the reasons why the Picc-Vic scheme of the 1970s was abandoned.
Which to me seems like a short sighted solution to a long term issue.
Which is exactly what it is. Metrolink was a cheap alternative to a Piccadilly-Victoria tunnel and the Ordsall Chord, which were both deemed to be too expensive at the time. It was also seen as a cheap solution for the Bury and Oldham lines which were both in need of a lot investment if they were to remain open as heavy rail routes. Having Altrincham as part of phase 1 rather than East Didsbury was also a cheap option, as it involved converting a line already open and electrified, opposed to a route which is a combination of new tracks and reopening a disused line.
Indeed but if conversions continue and unless there is another cross city route built
You didn't notice the one they just built which carries very few trams at the moment?