Beyond 2021 when the Trafford Park Line opens where should Metrolink expand to:

Possible Expansion Options:
  • East Didsbury-Stockport
  • Middleton
  • Western Loop (linking with the proposed Manchester Airport HS2 station?)
Where else do you think it should go or could go?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

daodao

Established Member
Joined
6 Feb 2016
Messages
3,601
Location
Dunham/Bowdon
Wigan Wallgate via Atherton? Hadfield/Glossop? Rose Hill Marple?

Conversion of the ex-GC line from Ashbury's to Rose Hill, Marple would be an obvious next step, with a new surface tram line to connect the existing line from just east of Ashbury's to the east end of the current tram portal under Piccadilly.

Trains to Marple Bridge and beyond could be routed via Guide Bridge, with track sharing (tram-train style) between Romiley station and Marple Wharf junction, or alternatively dedicated single lines as occurs through Navigation Road.
 

Chester1

Established Member
Joined
25 Aug 2014
Messages
4,440
Beyond 2021 when the Trafford Park Line opens where should Metrolink expand to:

Possible Expansion Options:
  • East Didsbury-Stockport
  • Middleton
  • Western Loop (linking with the proposed Manchester Airport HS2 station?)
Where else do you think it should go or could go?

The Trafford Park Line is still due to open early 2020 not 2021.

It is more important for Stockport to have a line to the Airport than East Didsbury, although the likely route to the Airport would diverge from the original proposed route between Stockport and East Didsbury (before the plans were reduced) near Gorsey Bank and therefore cover about half of the route. It would make sense to do both at the same time. I am not sure the business case for East Didsbury-Stockport would be sufficient to justify it as a stand alone scheme.

The Combined Authority has applied for financing to extend the Airport Line to Terminal 2 but the rest of the loop won't progress until nearer to 2033. They have also authorised writing a business case for a Crumpsall to Middleton branch, which would presumably be an extension of the Trafford Park-Crumpsall service. I think they want to wait to see how the South Wales Tram-Train scheme goes before trying it in Manchester.
 

Along the bay

Member
Joined
2 Sep 2018
Messages
100
The Trafford Park Line is still due to open early 2020 not 2021.

It is more important for Stockport to have a line to the Airport than East Didsbury, although the likely route to the Airport would diverge from the original proposed route between Stockport and East Didsbury (before the plans were reduced) near Gorsey Bank and therefore cover about half of the route. It would make sense to do both at the same time. I am not sure the business case for East Didsbury-Stockport would be sufficient to justify it as a stand alone scheme.

The Combined Authority has applied for financing to extend the Airport Line to Terminal 2 but the rest of the loop won't progress until nearer to 2033. They have also authorised writing a business case for a Crumpsall to Middleton branch, which would presumably be an extension of the Trafford Park-Crumpsall service. I think they want to wait to see how the South Wales Tram-Train scheme goes before trying it in Manchester.
Wouldn't they look at the Sheffield - Rotherham tram train instead
The Welsh ones are trains that can act as trams .
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,225
Location
"Marston Vale mafia"
Wouldn't they look at the Sheffield - Rotherham tram train instead
The Welsh ones are trains that can act as trams .

They are pretty much the same thing in concept - a vehicle that meets both train and tram regulations. The Welsh ones are high floor and the Rotherham ones low floor, but that's neither here nor there; Metrolink vehicles are trams and are high floor, while Stadler FLIRTs are trains but can be low floor.
 

MarkyT

Established Member
Joined
20 May 2012
Messages
7,566
Location
Torbay
They are pretty much the same thing in concept - a vehicle that meets both train and tram regulations. The Welsh ones are high floor and the Rotherham ones low floor, but that's neither here nor there; Metrolink vehicles are trams and are high floor, while Stadler FLIRTs are trains but can be low floor.
I'm sure approvals for Citylinks in South Wales will draw heavily on work already done in Sheffield, even though there will be minor detail differences in design. After South Wales, Stadler will have an off the shelf solution ready for any further customers wanting either high or low platforms.
 

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,318
Location
Yorks
An EMU (tram) would provide a quicker journey than whatever Northern manage to scrape from the bottom of the DMU barrel due to the fast acceleration.

No they wouldn't because I'd have to go through the magical mystery tour of the streets of Manchester to get to Victoria.

I want my normal halfhour service to the centre of Manchester, which is better facilitated by the National rail network.
 

Ianno87

Veteran Member
Joined
3 May 2015
Messages
15,214
No they wouldn't because I'd have to go through the magical mystery tour of the streets of Manchester to get to Victoria.

I want my normal halfhour service to the centre of Manchester, which is better facilitated by the National rail network.

Metrolink would be the only practical way of ever getting better than half-hourly service on the route.

Would be an opportunity to add a few extra stops for poorly served areas, like Dobbs Brow, Little Hulton and Pendlebury.
 

Chester1

Established Member
Joined
25 Aug 2014
Messages
4,440
Marple and Glossop are more likely than Atherton because they only require a link from near Ashburys or Ardwick to Piccadilly Metrolink stop. Atherton tram trains would require a line from Salford Crescent into central Manchester. There are 5tph each from Altrincham and Bury that start and terminate at Piccadilly. 60m tram trains extended to Marple would help serve growing demand on both lines and Bury-Altrincham could be opperated by tram trains if the Navigation Road bottleneck was returned to dual heavy rail tracks.

Wouldn't they look at the Sheffield - Rotherham tram train instead
The Welsh ones are trains that can act as trams .

I agree Rotherham scheme is more similar but it is very late and massively over budget. I think the Combined Authority / TfGM will want to see a successful scheme before trying it themselves. The extension of the Airport line to terminal 2 is a good little scheme to do after the Trafford Park Line opens and it gives more time to develop the next long term strategy.
 

Bungle965

Established Member
Associate Staff
Buses & Coaches
Joined
2 Jul 2014
Messages
3,378
Location
Calder Valley
Most people don't want to go *to* Picc, or much less Vic. They want to go to Manchester City Centre, which the tram makes a far better job of.
Try telling that to some MP, I seem to have a recollection of one on the Rochdale line being up in arms over the fact that their service did not go to Piccadilly.
 

tbtc

Veteran Member
Joined
16 Dec 2008
Messages
18,052
Location
Reston City Centre
Most people don't want to go *to* Picc, or much less Vic. They want to go to Manchester City Centre, which the tram makes a far better job of.

Precisely!

Something that's easily forgotten is that everyday passengers aren't making the kind of journeys that enthusiasts do - more people from Atherton/ Glossop/ Marple want to head to the offices/ shops/ bars of Manchester than visit a mainline train station as their destination.

If you can provide people with more frequent services that actually run into the heart of the city (and do so with an operation that requires no operational subsidy, unlike Northern Rail) then surely that's a good thing?

Look at the Oldham line - when the four trains per hour were replaced by five trams per hour (initially), passenger numbers rose significantly - because the number of people wanting to get closer to places like the Arndale vastly outnumbered those wanting through tickets to National Rail destinations. Not perfect - through-ticketing to/from Metrolink isn't as good as it should be - but the evidence seems to show that passengers prefer five trains per hour (into the heart of Manchester) than four trains per hour (to Victoria).

Plus, given well documented capacity problems at central Manchester stations, converting the Atherton/ Glossop/ Marple lines to Metrolink (or "TramTrain') would free up some much needed capacity!
 

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,318
Location
Yorks
Metrolink would be the only practical way of ever getting better than half-hourly service on the route.

Would be an opportunity to add a few extra stops for poorly served areas, like Dobbs Brow, Little Hulton and Pendlebury.

Half hourly is a perfectly acceptable frequency for the route IMO.

I just don't want to spend stupid amounts of time on a crappy tram with no bog pootling around the streets of Manchester. I want a swift connection to get back to Yorkshire.

This is what people forget. Trains are part of a national network to get people significant distances in a reasonable time. If you want slow and frequent, catch a bus.
 

Busaholic

Veteran Member
Joined
7 Jun 2014
Messages
14,671
Precisely!

Not perfect - through-ticketing to/from Metrolink isn't as good as it should be - but the evidence seems to show that passengers prefer five trains per hour (into the heart of Manchester) than four trains per hour (to Victoria).
I always value and enjoy your contributions, and try not to be a nitpicker, but think you mean five trams per hour, to make sense?
 

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,318
Location
Yorks
If you can provide people with more frequent services that actually run into the heart of the city (and do so with an operation that requires no operational subsidy, unlike Northern Rail) then surely that's a good thing?

Is there any evidence that the Oldham loop itself required an operating subsidy as part of the railway network, or are we just assuming that it did because the artificially created Northern Rail franchise did at the time ?

The Oldham loop may have been cross-subsidising other parts of the franchise.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,633
Location
Nottingham
I always value and enjoy your contributions, and try not to be a nitpicker, but think you mean five trams per hour, to make sense?
Pretty sure Oldham has ten trams per hour - at least the journey planner indicates so although the map implies five!
 

Bungle965

Established Member
Associate Staff
Buses & Coaches
Joined
2 Jul 2014
Messages
3,378
Location
Calder Valley
Pretty sure Oldham has ten trams per hour - at least the journey planner indicates so although the map implies five!
Oldham has both the Shaw and Crompton and the Rochdale services so ten trams per hour sounds right.
Sam
 

Chester1

Established Member
Joined
25 Aug 2014
Messages
4,440
Pretty sure Oldham has ten trams per hour - at least the journey planner indicates so although the map implies five!

It has 10tph, 5tph start and finish at Shaw because the demand between Shaw and Rochdale is insufficient for 10tph.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,225
Location
"Marston Vale mafia"
Half hourly is a perfectly acceptable frequency for the route IMO.

I just don't want to spend stupid amounts of time on a crappy tram with no bog pootling around the streets of Manchester. I want a swift connection to get back to Yorkshire.

Most people don't, though, which is evidenced by the phenomenal popularity of Metrolink despite its high fares.
 

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,318
Location
Yorks
Most people don't, though, which is evidenced by the phenomenal popularity of Metrolink despite its high fares.

Well, the railway can't be everything to all people. The trains on the Atherton line don't run empty in my experience. It's popular enough that the units are doubled up a lot of the time.

If there is that much demand for a metrolink style service to the North West of Manchester, they should dig up the guided busway and replace it with a tram. They can then leave the railway to those of us who need a railway service.
 

Flying Claret

Member
Joined
14 Aug 2014
Messages
232
Beyond 2021 when the Trafford Park Line opens where should Metrolink expand to:

Possible Expansion Options:
  • East Didsbury-Stockport
  • Middleton
  • Western Loop (linking with the proposed Manchester Airport HS2 station?)
Where else do you think it should go or could go?

Extend through the ELR to an 'east lancs parkway' at Rawtenstall...
 

Ianno87

Veteran Member
Joined
3 May 2015
Messages
15,214
Extend through the ELR to an 'east lancs parkway' at Rawtenstall...

Have to admit, I do sometimes think it's a shame the ELR is there - the density of population in the valley wouldn't be badly suited to Metrolink....
 