87015
Established Member
Out of interest, what was said wash regime? It’s 48 hours in some current operators contracts.Agreed - especially in the darker blue - and when NSE imposed a "proper" carriage washing regime. We digress however.
Out of interest, what was said wash regime? It’s 48 hours in some current operators contracts.Agreed - especially in the darker blue - and when NSE imposed a "proper" carriage washing regime. We digress however.
Out of interest, what was said wash regime? It’s 48 hours in some current operators contracts.
They manage it in the peaks. Albeit, it's 2tph Blackfriars - Beckenham Jun. Maybe that should be all day?
Possibly something to do with Cutty Sark station being much more conveniently located for most tourists? (although with slower journey times from central London). And more generally, there are numerous other stations pretty close to Greenwich, so someone living as little as a quarter of a mile from Greenwich station may find it more convenient to use a different station to get to Central London: That's not the case at Earlsfield, which therefore would have a wider catchment area than Greenwich.
Realistically, once you get to a train every 10 minutes, I would suspect that additional services would have very little impact on generating demand - how many people would refuse to use the train because they might have to wait 10 minutes for the next one? So conversely, it doesn't really make sense to argue that a 10 minute frequency would be suppressing demand significantly - unless of course trains are so packed that you either can't get on them or journeys are extremely uncomfortable. And from when I've travelled on that line, off-peak that's nowhere near the case in Greenwich (peak might be another matter).
I think this could be possible, although you wouldn’t get the perfect “train every ten mins” format due to all the fasts, it would still be a much needed upgrade to 6tph.
I would also like for the Hayes line to be 6tph, maybe a CX to Beckenham Junction service would help
Beckenham Junction could have this sort of service
London Bridge Southern: 2tph (Mon to Sat)
Victoria to Orpington: 4tph everyday
Victoria to Maidstone/Ashford: 2tph
Charing Cross service via Ladywell: 2tph
This gives Beckenham Jnc a boost up to 10tph and a variety of routes
A Blackfriars or Victoria to Kent House service at 2tph would bolster the inner stations to 6tph
Yes they can from the London direction but have to go into plat 2 (up main) which means whilst its sitting there up trains will have to go via the loop (plat 1).[/QUOTE]Can services actually turn around at Kent House?
Which admittedly is not a heavy time penalty.
The seats are comfortable, yes...if you seek out the priority seats with the little bit extra legroom, if you're 6ft+ the standard airplane layout seats don't provide the seat pitch and you end up with your knees around your armpits, very much a case of squeezing an extra row of seats when profit was more important than passenger comfortThat's a good point they definitely are really comfortable!
I’m not sure if I’m missing something but it seems a little insane buying new high speed bi mode units when British Rail/Network SouthEast were planning to electrify the Marshlink line by 1995. Why can’t the third rail just be extended from Ore to Ashford nowadays?
Plus, any scope of running the pre-2009 timetable again and having fast services from Charing Cross to Margate/Ramsgate again?
I’m not sure if I’m missing something but it seems a little insane buying new high speed bi mode units when British Rail/Network SouthEast were planning to electrify the Marshlink line by 1995. Why can’t the third rail just be extended from Ore to Ashford nowadays?
Plus, any scope of running the pre-2009 timetable again and having fast services from Charing Cross to Margate/Ramsgate again?
hope to see the return of such a service one day.Sorry for the random post I’m about to post but I Had a nice surprise earlier, after some flat hunting in Greenwich my partner and I got on a train to London Bridge and it skipped Deptford, presumably due to the leaf fall timetable, made me long for the good old days when the semi fasts used to run via Greenwichhope to see the return of such a service one day.
If your priority is a train not stopping at Deptford, you need some new priorities!
I was only saying how it brought back memories of the old fast service that used to run, I’ve always stated that Deptford now needs more trains and yes I do believe the fasts are needed but further out......
I’m glad you aren’t in charge of the procurement / train service specification of the new franchise...
Sorry for the random post I’m about to post but I Had a nice surprise earlier, after some flat hunting in Greenwich my partner and I got on a train to London Bridge and it skipped Deptford, presumably due to the leaf fall timetable, made me long for the good old days when the semi fasts used to run via Greenwichhope to see the return of such a service one day.
You do have quite a romantic attachment to semi-fasts, which was somewhat understandable when you lived in North Kent but something you will need to shake off as a Londoner!
Here's one from left field.
How about a regular service from Ashford to Lydd Town (for airport).
The infrastructure is already there, and they could draft in some soon to be deposed 144's from the North.
I'm sure the planned expansion would make a need for it for sure if it gets more flights than already there.However, I would like to think we should have seen the back of any Pacers by the time the expansion is complete and effects operational (without going into that field of discussion), so would hope by the time such an idea would happen some other DMUs could be cascaded instead
![]()
Hmm that is an interesting idea, it could work. It would certainly be helpful for people to get to stations in Sussex as well as restoring the heavily missed fast service to Ashford and beyond. I completely agree with your idea but would like the Dover service to be re-extended to Ramsgate. Off peak it sucks to have to get off at Dover or Ashford if you don't want St Pancras.Lydd is an interesting proposition. Huge work will be needed to get the branch up to scratch and even create a situation whereby flasks can be loaded. This is the sort of thing where a battery unit would work very nicely.
When the Southeastern consultation came out my suggestion was some form of 387-esque unit that would be able to work with the 375s; working on express Charing Cross - Ashford services and portion working to Hastings via Rye (375s to Dover / Canterbury / Ramsgate) instead of over-heavy bi-mode units on HS1 and massive conflicting moves across the entire layout.
Indeed, I actually said the Dover service (with the Hastings portions) should be half-hourly to Charing Cross as an Express; and the Canterbury route should be half-hourly to St Pancras during off-peak. With a suitable connection (e.g. 15 minutes either way) between the routes it wouldn’t make life overly difficult.
I agree with you, fast services for the win!I was only saying how it brought back memories of the old fast service that used to run, I’ve always stated that Deptford now needs more trains and yes I do believe the fasts are needed but further out......
Why is that? Do you live in Deptford and so object to a reduction in servicing calling at your station? Greenwich is more interesting than Deptford and has more boarding and alighting from what I have seen off peak.I’m glad you aren’t in charge of the procurement / train service specification of the new franchise...
Who doesn't though? When you live in East or North Kent, every minute is significant. Londoners have very frequent services and shorter journey times compared to the rest of us further out and can also wake up much later in the morning. It is selfish to want to have as many services as possible calling in suburbia at the detriment of services meant to serve people further out. Mind you, its understandable that as capacity constraints get worse that service levels will need to increase somehow.You do have quite a romantic attachment to semi-fasts, which was somewhat understandable when you lived in North Kent but something you will need to shake off as a Londoner!
Hmm that is an interesting idea, it could work. It would certainly be helpful for people to get to stations in Sussex as well as restoring the heavily missed fast service to Ashford and beyond. I completely agree with your idea but would like the Dover service to be re-extended to Ramsgate. Off peak it sucks to have to get off at Dover or Ashford if you don't want St Pancras.
It is particularly terribly annoying how the last service from Charing Cross late at night terminates at Dover Priory, waits there for a short while before speeding through to Deal and Sandwich to Ramsgate when it could have stopped another 4 times en route seeing as though it goes to Ramsgate anyway. I have complained to Southeastern about this repeatedly.
Perhaps, if that is the case I am not sure what they could do other than making the conductors day concerned longer. It is just strange not calling at the last 4 stops to Ramsgate seeing as it goes that way anyway.The only thing about that latter paragraph is that if the Conductor is at Dover and has finished for the day and the driver is at Ramsgate and the unit goes straight to depot avoiding the station?
I agree with you, fast services for the win!
Why is that? Do you live in Deptford and so object to a reduction in servicing calling at your station? Greenwich is more interesting than Deptford and has more boarding and alighting from what I have seen off peak.
Who doesn't though? When you live in East or North Kent, every minute is significant. Londoners have very frequent services and shorter journey times compared to the rest of us further out and can also wake up much later in the morning. It is selfish to want to have as many services as possible calling in suburbia at the detriment of services meant to serve people further out. Mind you, its understandable that as capacity constraints get worse that service levels will need to increase somehow.