• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Northern Unit Refurbishments and depot allocations.

AMD

Member
Joined
6 Dec 2017
Messages
773
Back onto topic....
First 323 will be in for refurb sometime May or June 2019
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

HLE

Established Member
Joined
27 Dec 2013
Messages
1,421
They're not that amazing at acceleration at this time of year though. You want to try being stuck behind one that's doing a Cov or Crewe stopper. 350 is the best unit by far for getting going.

And for stopping. Good units.
 

Geeves

Established Member
Joined
6 Jan 2009
Messages
2,638
Location
Rochdale
I guess the next depot to learn the 323s might be Wigan?

Glad to hear they might be stopping though... Probably .
 

Bertie the bus

Established Member
Joined
15 Aug 2014
Messages
3,216
Not happening - another depot is about to be trained up on them soon.
Absolutely typical of Northern. They still haven't trained enough drivers to fully implement the May timetable yet but can mess about training drivers so they can pointlessly swap EMUs around.
 

61653 HTAFC

Veteran Member
Joined
18 Dec 2012
Messages
19,354
Location
Yorkshire
Wouldn't surprise me. Or they could cover for Yorkshire's missing electrics although for familiarity, any cover would probably be 319's.
Bringing them "home" would get my vote, but highly unlikely to happen (even though the costings for the Aire/Wharfe wiring assumed a third batch of 323s would be the eventual rolling stock IIRC).
 

ic31420

Member
Joined
23 Aug 2017
Messages
400
Location
United Kingdom
Porterbrook suggested Manchester Airport to Windermere as one such route. Someone revealed previously while the 379 IPEMU could run Manchester Airport to Barrow and back it wouldn't be able to fully recharge without a longish layover at Manchester Airport. That could mean in the case of late running the options are:
1. Have the train running late all day
2. Cancel a return working and start the next one on time
3. Terminate a service short so it misses the non-electrified section, opposed to terminating it short so it misses the Airport section where there are alternative services.

Not sure I believe that...

Would they be fully discharged / do they need a full charge.

What about some equipment at Windermere to charge them there?
 

northwichcat

Veteran Member
Joined
23 Jan 2009
Messages
32,692
Location
Northwich
Not sure I believe that...

Would they be fully discharged / do they need a full charge.

What about some equipment at Windermere to charge them there?

Well it's logical the recharging rate will be faster when the train is idle (unless there's a diesel generator on board) and that the longer Barrow branch would run down the battery more than the Windermere.
 

LOL The Irony

Established Member
Joined
29 Jul 2017
Messages
5,335
Location
Chinatown, New York
Any source to confirm that the 323s will now be staying until 2020?
Nothing except AMD who I'm assuming works for Northern. Although applying logic tells us that there's no point in training staff on units leaving in 2 months so they must be staying for the forseable future.
 

DanNCL

Established Member
Joined
17 Jul 2017
Messages
5,123
Location
County Durham
Nothing except AMD who I'm assuming works for Northern. Although applying logic tells us that there's no point in training staff on units leaving in 2 months so they must be staying for the forseable future.
Not sure logic necessarily comes into it when we're talking about Northern ;). That is a very good point though, there would be no point training staff on units leaving in 2 months. Then there's also the fact that nothing has arrived to replace the 323s.
 

LOL The Irony

Established Member
Joined
29 Jul 2017
Messages
5,335
Location
Chinatown, New York
Not sure logic necessarily comes into it when we're talking about Northern ;). That is a very good point though, there would be no point training staff on units leaving in 2 months. Then there's also the fact that nothing has arrived to replace the 323s.
Also there's the fact of why when they need all the drivers they can get right now, would they take staff off duty to train on units leaving in 2 months. There's more than a bit of truth to this rumour.
 

DanNCL

Established Member
Joined
17 Jul 2017
Messages
5,123
Location
County Durham
Also there's the fact of why when they need all the drivers they can get right now, would they take staff off duty to train on units leaving in 2 months. There's more than a bit of truth to this rumour.
I think it's starting to become obvious that the 323s won't be leaving in December, most likely nor will any pacers, however I struggle to believe that they're all staying until 2020 either without a source to confirm it - a C6 exam schedule doesn't confirm anything other than that the 323s are due a C6 exam.
 

Chester1

Established Member
Joined
25 Aug 2014
Messages
4,442
Porterbrook suggested Manchester Airport to Windermere as one such route. Someone revealed previously while the 379 IPEMU could run Manchester Airport to Barrow and back it wouldn't be able to fully recharge without a longish layover at Manchester Airport. That could mean in the case of late running the options are:
1. Have the train running late all day
2. Cancel a return working and start the next one on time
3. Terminate a service short so it misses the non-electrified section, opposed to terminating it short so it misses the Airport section where there are alternative services.

Porterbrook specifically mentioned services in the North West as a target market and are modeling the design for Windermere. Battery technology has improved since the 379 trial and will improve over the next couple of years. A 350 uprated to 110mph (which is part of the plan) should be able to reduce journey times a little and therefore increase turn around times. Barrow to Carnforth on battery with recharging Carnforth to Airport + during a 10-15 minute turnaround should be realistic. Liverpool-Manchester Airport via CLC should be achievable too and would also free up 195s.
 

superkev

Established Member
Joined
1 Mar 2015
Messages
2,863
Location
west yorkshire
Porterbrook specifically mentioned services in the North West as a target market and are modeling the design for Windermere. Battery technology has improved since the 379 trial and will improve over the next couple of years. A 350 uprated to 110mph (which is part of the plan) should be able to reduce journey times a little and therefore increase turn around times. Barrow to Carnforth on battery with recharging Carnforth to Airport + during a 10-15 minute turnaround should be realistic. Liverpool-Manchester Airport via CLC should be achievable too and would also free up 195s.
I wonder what size battery is needed for decent performance Carnforth Barrow. Current batteries around £200 a Kw/hr and 8kg a Kw/hr and 5-7 year life. Those wires still look good to me.
K
 

northwichcat

Veteran Member
Joined
23 Jan 2009
Messages
32,692
Location
Northwich
Porterbrook specifically mentioned services in the North West as a target market and are modeling the design for Windermere. Battery technology has improved since the 379 trial and will improve over the next couple of years. A 350 uprated to 110mph (which is part of the plan) should be able to reduce journey times a little and therefore increase turn around times. Barrow to Carnforth on battery with recharging Carnforth to Airport + during a 10-15 minute turnaround should be realistic. Liverpool-Manchester Airport via CLC should be achievable too and would also free up 195s.

Yes they are looking at Windermere. The point I was making is Barrow is a longer route so something designed for Windermere isn't automatically suitable for Barrow. Although, it may be Windermere they are looking at simply because DfT are making money available for the trial of an alternative fueled train for Windermere.
 

sd0733

Established Member
Joined
7 Nov 2012
Messages
5,196
170474 us currently seemingly abandoned at Crewe by the WCML been there for over a week. It's fully northernised externally and internally looks almost done except for one coach which looks to have a load of seats piled up.
 

ash39

Established Member
Joined
8 Feb 2012
Messages
1,524
I'm sure someone must have pointed this out by now - apologies if so as I haven't read the full thread.

What happens when a battery powered unit arrives at a non-wired terminus, lets say Windermere. Inbound service delayed, so the turnaround time is down to 5 minutes.

Obviously, this isn't long enough to do a substantial amount of battery charging. Does the service get delayed until the unit is charged? I can see that being a PR disaster.
 

Top