Electrification as it is currently carried out has a bunch of problems...
The overall conversion efficiency from chemical energy of fuel to mechanical output from the wheels is not a lot different whether you use a remote generating plant and transmit the electricity, or a local plant and transmit the fuel. You get some benefit from remote generation using nuclear or renewable sources, but since most of our electricity still does come from fossil fuel (all this crowing about "no coal" days but they never mention that the replacement for all those closed coal power stations was gas ones...) and since railways use only a minor percentage of the fossil fuel used for transport, it's nothing like as much of a benefit as it's made out to be.
The current trend for removing fossil fuels across the world will accelerate and it's not so that some difficult uses can be perpetuated. Rail will be seen as just another polluter. Added to the the particulate contamination that diesel carries into areas of mass population, it will not be tolerated so remote well controlled generation (even using a small amount of fossil fuels) will be the only option available except to the military and emergency services.
It may even be a negative benefit, since not having to carry the generator about with you removes a major limitation on the power output of the train, and people are often tempted to specify grossly overpowered traction as a result. The additional power consumption wipes out any gain you might otherwise have got from part of the supply being nuclear or renewable. This is particularly the case when the temptation to go for excessive speed also comes into it - energy consumption for a given journey varies as the square of the speed (and power consumption as the cube), but the reduction in journey time is often nugatory especially when you consider the total time end-to-end as opposed to just that part of it spent on a moving train.
The low rolling resistance, minimal air resistance, controllable and predictable speeds and the ability to feed regenerated energy back into the supply all effectively negate the impact of higher available power per se. On the subject of absolute speed, (in the UK), for over two decades, most of the rail journeys at the highest speeds (125mph) were diesel hauled (HST), - it's only recently that high speed electric services have been increased above that level. But, once again, the cruising at higher speeds uses relatively little extra power as a means to provide higher capacity transport whilst at the same time, actually drawing custom from the high polluter modes, i.e. road and air.
It costs an absolute packet, not only for the kit itself but for the reconstruction of the whole route with increased clearances. The money would often be better spent on getting rid of speed restrictions, improving junctions and flexibility, making stations pleasant places to wait, etc. etc. In the case of reopening a closed route, to insist on electrification may make the project so expensive that instead of a non-electrified line we just don't get the line at all, and that's no use to anyone.
Removing the pollution does make not only stations more pleasant, but also the immediate environment along the whole route. The capital cost of electrification is a one-time expenditure, and the associated civil engineering has a life exceeding 50 years, - often 120 years. In those periods, the extended life of rolling stock, and the running cost of the installation makes the difference much lower and sometimes actually cheaper that perpetuating the pollution (and tarting up stations as an attempt to mitigate that pollution).
It's kind of daft for minor routes that see little traffic, especially those that are in remote and inhospitable places (like the Highlands) which add harsh weather and difficult access to the extra maintenance the wiring needs anyway.
OLE appropriate for the role has a maintenance requirement that can easily be accommodated even in remote inhospitable areas. OLE railways run through the Alps, in Arctic zones in Scandinavia and across Siberia. What makes you thing that the UK is so hostile that it can't be viable.
Diesel haulage is still needed for trains that run over routes which are only partly electrified. Particularly awkward for freight, with the kind of twiddly bits at the ends, perhaps even on private land, that would need to be wired. Or where the wires would get in the way of loading.
They seem to manage on the European mainland where
much more freight is carried than in the UK.
It is prone to catastrophic failures which take out an entire route instead of just one track, and which cause damage extending over several miles.
That's true for older low-cost OLE, - thankfully, the industry in the UK has at last understood that you get what you pay for and the latest schemes, getting rid of daft headspans will much reduce the damage to wiring on adjacent tracks. With a busy mainline, any breakdown can cause a long line of queueing trains so there's not that much difference anyway.
Not worth commenting on what is just a personal opinion.
I'm not sure what the current state of play is with regard to going past those endless masts all day kzhoonk kzhoonk kzhoonk doing the driver's head in, but they certainly are hypnotic and it must be of at least some significance.
I've never heard any comment at all about that. Maybe a driver here could offer an informed opinion of the visual compared with the diesel drone and pollution along the thline, througn tunnels and sitting in stations.
Non-diesel alternatives: on-board rechargeable energy storage works for short or shortish passenger branches - flywheels for the very short ones, batteries for not so short ones, especially if someone has the sense to use separate locomotives and coaches so the coaches can be hauled by one loco while the others recharge. Though there is still a question about the sustainability of battery manufacture.
Battery manufacture is just another consumer of raw materials with some re-use. Other than for limited 'add-on' electric train operation, it's real use should be to prevent
all running diesel under wires.
For longer distances, it helps to drop the insistence on overhead wiring. Using a 4-rail system on something like +/-1.5kV with the feed not through the rails themselves but through large-section aluminium busbars alongside the track cross-linked to the rails at frequent intervals, the losses can be brought down to the same level as with 25kV overhead. It is not a safety problem - accidents to railway staff from overhead and live rail happen at about the same rate, and the increased voltage is not increased enough to affect the danger level. Overhead clearances do not need to be increased, installation is easier, maintenance is easier, high winds don't kill it, damage usually affects only one line, and it's unobtrusive.
In a modern risk-aware society, accessible exposed high-voltage conductors will progressively eradicated, and no new schemes will be entertained, even as a proposal.