Aictos
Established Member
- Joined
- 28 Apr 2009
- Messages
- 10,403
We all know the benefits of electrifying more of the UK but why should we NOT consider electrifying more of the UK?
Discuss.....
Discuss.....
Parts of it would be economic nonsense e.g. Settle and Carlisle.We all know the benefits of electrifying more of the UK but why should we NOT consider electrifying more of the UK?
Discuss.....
It will be a long time before they run out of lines that need electrification and have to do the unnecessary bits.We all know the benefits of electrifying more of the UK but why should we NOT consider electrifying more of the UK?
Discuss.....
It does not have to be done by Network Rail.Because Network Rail can't be trusted to deliver it on time or within budget?
In other words, supply every train with two locomotives working in multiple, except with the added complication of high-power jumper leads between the two. It would, I suppose, allow heavier trains to be started (since tractive effort would be roughly doubled) but you'd lose a couple of wagons (1-3, depending on load) off of the train to compensate for the weight of the second locomotive.I did come up with an idea to re-use the Engine and Tender idea. Where a diesel tender could be used on a OHLE locomotive and an Electric OHLE tender could be used in conjunction with a diesel locomotive. It makes perfect sense to me as it gives the best of both worlds. All you need to do is build into current gen locos a cable run between the 2. Surplus 92's and 60's could be guinea pigs since they are mostly rotting in sidings somewhere.
It does not have to be done by Network Rail.
In other words, supply every train with two locomotives working in multiple, except with the added complication of high-power jumper leads between the two. It would, I suppose, allow heavier trains to be started (since tractive effort would be roughly doubled) but you'd lose a couple of wagons (1-3, depending on load) off of the train to compensate for the weight of the second locomotive.
----Electrification causes disruption. With so much of the UK's rail network so heavily used, the economic impact of lengthy engineering works may be unacceptable.
Thank you all, I am intending on giving a presentation on UK Rail Electrification so seeing various arguments AGAINST it helps me see the bigger picture so thank you all for your input.
I did come up with an idea to re-use the Engine and Tender idea. Where a diesel tender could be used on a OHLE locomotive and an Electric OHLE tender could be used in conjunction with a diesel locomotive. It makes perfect sense to me as it gives the best of both worlds. All you need to do is build into current gen locos a cable run between the 2. Surplus 92's and 60's could be guinea pigs since they are mostly rotting in sidings somewhere.
We all know the benefits of electrifying more of the UK but why should we NOT consider electrifying more of the UK?
Discuss.....
The only real negative is the large initial cost, but that should not be used as an excuse not to press on!
There are, literally, no good reasons not to electrify.
It's always beneficial and reduces long term operating costs. Much more reliable than diesel traction, with less moving parts, therefore less to go wrong, and less maintenance intensive. The only real negative is the large initial cost, but that should not be used as an excuse not to press on!
It wouldn’t be allowed for exactly the same reason new third rail wouldn’t be allowed.Has anyone explored live running rail electrification? If the running rails were electrified and the wheels acted as the pickup shoes, it would negate many of the challenges of third rail in icy conditions.
I think that Daz28 is confusing real railways with a 12VDC model railway.It wouldn’t be allowed for exactly the same reason new third rail wouldn’t be allowed.

So you would buy a house on a 30* salary mortgage?