Well construction would have been up-and-running.I agree about Germany this would have been an important project would have been up and running long ago.
It would have been something like construction started 2005, opening scheduled 2020...
Well construction would have been up-and-running.I agree about Germany this would have been an important project would have been up and running long ago.
Public Inquiry is being planned for anyway - before springtime.Grayling seems to be in favour of it.
I suppose it depends on whether there are a lot of objetions. If there are, there will probably have to be a public inquiry.
Well construction would have been up-and-running.
It would have been something like construction started 2005, opening scheduled 2020...![]()
Just for the record, it's a Public Inquiry.Public Enquiry is being planned for anyway - before springtime.
like the Berlin Brandenburg Airport you mean...............................
Jesus you're not kidding...or Halle-Nuremburg high speed line which took way longer than planned
like the Berlin Brandenburg Airport you mean...............................
While very true, I'm not even talking about those overruns - I'm talking about the way that Germans are rather good at getting stuff started, then take years to actually build it.or Halle-Nuremburg high speed line which took way longer than planned
While very true, I'm not even talking about those overruns - I'm talking about the way that Germans are rather good at getting stuff started, then take years to actually build it.
Have a look at this summary of German road construction projects. Some schemes have a normal window of a couple of years of actual construction (the start dates are groundbreaking ceremonies), but the norm is more like 6+ years for just a couple of kilometres of flat road from sod turning to opening!
And here's roadworks starting yesterday, ending in 2035 (just under a post where a 9.5 years build a bypass - OK, with two short tunnels in the just-over-a-mile length - wasn't long enough and the opening date pushed back).
But grass-is-greener, especially Deutsch Übergras....
Not just transport either, the Datteln 4 power plant is another tour-de-force of this type of German project. Construction started in 2007 when coal fired power was still a thing, due online 2011, now expected sometime in 2020![]()
I think coal power is still very much a thing in Germany. They’ve promised to shut down all their nuclear plants so they’re going to need something else to replace that base load.
One key difference between Germany and the UK is that they tend to strip right down to the base layer and rebuild the entire carriageway rather than just a basic resurfacing like we generally do in the UK.French nuclear for example!
Living in Germany I can concur that roadworks seem to go on for ever, but so they do in UK.
Oops... my bad. There is a video in the link I posted of Rob Brighouse, chairman of East West Railway Company, calling it Bletchley to Cambridge. That's what planted it in my head. I knew the Marston Vale line was still open, but somehow I managed to practice cognitive dissonance.Central section = “Bedford to Cambridge” according to all the sources I just checked.
This statement is still valid. Of course, in practice more companies are involved than those who comprise the formal alliance.Cheers Richie.
Im assuming that Volka rail and Atkins are still going to be involved with the works?
Yes and no. I too travelled the road between Steeple Claydon and Calvert and noticed lots of cones. The works here are where EWR and HS2 meet and are authorised under the HS2 Hybrid Bill. EWR is being realingned and will pass over HS2. Further east on the mothballed section I also noticed a new access road parallel to the railway at Queen Catherine Road. The crossing here remains fenced off.I think there might be progress on work today.
This morning a freight train rolled though Bicester village station, over the level crossing, heading down towards Claydon. The track had been blocked off with sleepers but these were removed.
Also noticed on Sunday the road between Steeple Claydon and Calvert have cones along it near the bridge over the loop. Not sure if this is connected?
Thank you for that link. The main element of their proposal is that the route should leave Bedford towards the north. I didn't notice their pointing it out, but presumably this entails using the existing Bedford Station and not building a new station somewhere. As one of the central objectives of East/West Rail is greater connectivity, it has always struck me as perverse to plan not to go to Bedford Station.The organisation called CBRR CamBedRailRoad has had significant press coverage in recent weeks, mainly in local newspapers in Cambridgeshire and Bedfordshire. As readers of this thread will be aware, they are proposing a northerly route for the missing central section between Bedford and Cambridge. The principal advantages they claim for this approach are:
It has been difficult fully to understand their proposition because they had no website of their own. They are now gradually filling this gap. The current, developing, website can be found at: http://www.cambedrailroad.org/
- that the railway will (in part) follow an existing road transport corridor, the A248 / A421;
- and will connect more communities – existing and future – than the more southerly C2-2 route favoured by Network Rail.
Unfortunately, the new route would not serve Bedford Midland station. The CBRR proposal is to build a new station at Bedford South / Wixams - see the PDF report linked to at http://www.cambedrailroad.org/fluidcms/files/files/CamBedRailRoad-Proposal.pdf. To run via Bedford Midland would still involve a reversal with this proposed route. Even this would only be possible with north to east and north to west chords which would in all probability not be constructible without unacceptable disruption.Thank you for that link. The main element of their proposal is that the route should leave Bedford towards the north. I didn't notice their pointing it out, but presumably this entails using the existing Bedford Station and not building a new station somewhere. As one of the central objectives of East/West Rail is greater connectivity, it has always struck me as perverse to plan not to go to Bedford Station.
OK, thank you. I've suddenly lost my enthusiasm for their scheme!Unfortunately, the new route would not serve Bedford Midland station. The CBRR proposal is to build a new station at Bedford South / Wixams - see the PDF report linked to at http://www.cambedrailroad.org/fluidcms/files/files/CamBedRailRoad-Proposal.pdf. To run via Bedford Midland would still involve a reversal with this proposed route. Even this would only be possible with north to east and north to west chords which would in all probability not be constructible without unacceptable disruption.