Indeed FGE! Watching it in action and the so called "slick PR" is somewhat worrying........no word on Brantham btw.....mmmmmmmm
The last couple of Renatus units I've travelled on have had their plug sockets blanked off. Is this a recent development? I'm pretty sure I've seen them in use previously.
Brantham? I remember Brantham ....The lack of anything to say about Brantham apart from 'still being worked on' at this late hour is pretty concerning. I also notice the '95% at 24-27tph' objective from the digital railway panel in the presentation. That's a lofty goal, I'm not really convinced it's achievable...
This week the Witham/Ipswich diagram has reverted to 317s! On a related note, can anyone tell me what is up with 317653 and 317881? They haven't worked since March/April. Is it game over for them?Yup, wifi fitment is in full swing and it's resulted in some rejigging of allocated diagrams.
The lack of anything to say about Brantham apart from 'still being worked on' at this late hour is pretty concerning. I also notice the '95% at 24-27tph' objective from the digital railway panel in the presentation. That's a lofty goal, I'm not really convinced it's achievable...
This week the Witham/Ipswich diagram has reverted to 317s! On a related note, can anyone tell me what is up with 317653 and 317881? They haven't worked since March/April. Is it game over for them?
Before Abellio took over there were four units OOS at Ilford, 315850, 317511, 317514 and and a 321.We have posters who will know for certain whether those 317s are long-term OOS, but it's not uncommon for units to be out of service for months at a time. There was one 317 that didn't see active service for over a year.
I think the 317s on the Stansted Express will be an early casualty. I've been pondering the Norwich scenario. If they need cover for the loco hauled sets from 2020 onwards, wouldn't it be simpler to use refurbished 321s? They already have booked work to Norwich and often stand in so the crews must already sign them.I was wondering whether we're getting closer to knowing where the new stock is to be deployed initially. Driver training schedules must be in draft by now.
Looking at the Aventras, I wonder whether Ilford drivers will sign them first with 720/5 units making their first appearances on the Southend Vic line and a handful of 720/1s allocated to West Side so as to release a few 379s for driver training and possible service from Norwich. As the 379s are earmarked to provide cover should there not be enough (or any) 745s to cover the Norwich - London services from 1/1/2020 it would be daft to not have drivers ready to use them, it would even allow some of the IC sets to be stood down early.
It wouldn't surprise me if Clacton turns are the last to go over to 720s as the 360s are also on lease through a good deal of 2020.
As for the 755s, Felixstowe branch first to minimize disruption if they don't behave?
All speculation of course but this monumental transition is creeping up on us.
If they need cover for the loco hauled sets from 2020 onwards, wouldn't it be simpler to use refurbished 321s? They already have booked work to Norwich and often stand in so the crews must already sign them.
I think the 317s on the Stansted Express will be an early casualty. I've been pondering the Norwich scenario. If they need cover for the loco hauled sets from 2020 onwards, wouldn't it be simpler to use refurbished 321s? They already have booked work to Norwich and often stand in so the crews must already sign them.
So they've pushed another senior manager over to assist with the new trains, who also is someone who is a commercial mind, to go with the other commercial minds and bid managers who are at the head of GA and the new train introduction projects, when they are badly in need of minds more from operational, engineering and new train experience backgrounds, you really couldn't make it up.
Do they really think they can just thrust commercial people in charge of such big projects and operational roles for such a massive transformation project and get by with an engineering head without any proper railway experience and everything will go fine?
Hopefully I will be proven wrong but honestly don't understand the make-up of this Abellio team who seem ill-prepared for the size of the project they are taking on.
Had to delete as Abellio released the information about signalling erroneously and have asked for it to be taken down!
What I heard was that Southend's 321's will get aventras first, BMU's will be the first stadlers in the area, followed by the airport EMU's (I suppose like you say to release 379's to cover 317 withdrawals.) I think west Anglia will be last to see aventras due to the infrastructure works needed to accommodate 12 length trains at almost all stations.
Okay fair enough. I thought signed them as well.Only Liverpool Street/Ipswich based ex-Anglia drivers sign 321s hence the diagram specific workings they are deployed on when standing in for IC stock.
Sorry if already answered, but has 321448 returned to traffic yet? Or is gathering moss at the back of Ilford alongside 317722?
I’m on it at the moment, winging its way to London as 1N03. Actually feels very “different” to the Renatus 321’s with blue LED lighting under the luggage racks, and for some reason it has (sealed) hopper windows fitted...

So it sounds like to me they've (I'm assuming) changed the seats to a sensible colour, fitted lockable hopper windows and that's about it? Wonder why it spent so long out of service then...I’m on it at the moment, winging its way to London as 1N03. Actually feels very “different” to the Renatus 321’s with blue LED lighting under the luggage racks, and for some reason it has (sealed) hopper windows fitted...
So it sounds like to me they've (I'm assuming) changed the seats to a sensible colour, fitted lockable hopper windows and that's about it? Wonder why it spent so long out of service then...