samuelmorris
Established Member
Then I really don't understand why it took so long, unless they simply gave up rectifying the defects. I wonder if the A/C system was changed? presumably not if the hopper windows were added.
So they've pushed another senior manager over to assist with the new trains, who also is someone who is a commercial mind, to go with the other commercial minds and bid managers who are at the head of GA and the new train introduction projects, when they are badly in need of minds more from operational, engineering and new train experience backgrounds, you really couldn't make it up.
Do they really think they can just thrust commercial people in charge of such big projects and operational roles for such a massive transformation project and get by with an engineering head without any proper railway experience and everything will go fine?
Hopefully I will be proven wrong but honestly don't understand the make-up of this Abellio team who seem ill-prepared for the size of the project they are taking on.
The last couple of Renatus units I've travelled on have had their plug sockets blanked off. Is this a recent development? I'm pretty sure I've seen them in use previously.
I'm strangely pleased to see it back and running. Like getting one of the old gang back for one last hurrah. The entire pre-privatisation Class 321 squadron back where it should be.
I'm getting carried away. Literally.
In other news. I wonder how the Crossrail news was greeted at GA HQ. I also wonder how much the Crossrail decision was affected by Bombardier's ability to rectify the issues with the 345s while trying to deliver the LO and GA fleets of Aventras. I can't imagine it's a happy day for the GA Delivery team.
Then I really don't understand why it took so long, unless they simply gave up rectifying the defects. I wonder if the A/C system was changed? presumably not if the hopper windows were added.
As the 379s are earmarked to provide cover should there not be enough (or any) 745s to cover the Norwich - London services from 1/1/2020 it would be daft to not have drivers ready to use them, it would even allow some of the IC sets to be stood down early.
Uh? Why would you stand the IC sets down early to sub them with a commuter emu?
Fair enough (maybe) if the flirts are late, but I can't see many Norwich folk being happy to lose the current comfortable trains early.
It's takes the same tine for me to drive to Westfield Stratford and tube into London than it does to catch the train. And it's cheaper.
I usually take the train because it offers a more relaxing comfortable journey. Sometimes even pay for first class.
Ditching the current stock early and subbing with commuter style trains would change that equation for me and I'm sure a lot of others.
Fleet commonality. I agree it's wasteful - they're very likely to find a new home, but where/when, who knows.trebor79 said:and why are the 379s being replaced? They aren't even 10 years old!
Corby to St Pancras has been mooted before.LHCS is not PRM-TSI (i.e. disability regs) compliant, so cannot be used beyond 01-Jan-20 without a change in the law.
Fleet commonality. I agree it's wasteful - they're very likely to find a new home, but where/when, who knows.
LHCS is not PRM-TSI (i.e. disability regs) compliant, so cannot be used beyond 01-Jan-20 without a change in the law.
The lack of anything to say about Brantham apart from 'still being worked on' at this late hour is pretty concerning. I also notice the '95% at 24-27tph' objective from the digital railway panel in the presentation. That's a lofty goal, I'm not really convinced it's achievable...
LHCS is not PRM-TSI (i.e. disability regs) compliant, so cannot be used beyond 01-Jan-20 without a change in the law.
The EMT HSTs will have to get an extension so why not get a short extension for the Norwich hauled sets if required? It would probably only be a few months. It would save a lot of time and money training Ipswich and Norwich drivers on 379s. Are 379s even route cleared to Norwich?
Very early to be calling that, they haven't started UK testing yet...The FLIRTS look to be on time. I'm not sure the Stansted Express will need 379s for too long nor will Norwich need the 90s too long - since the aventras are clearly delayed, 379s will probably serve GEML or Cambridge/Hertford East from summer 2019 to displace some 317s or 321s. A RAIL article quotes GA as saying they would prioritize the first launch of 745 FLIRTS. Can anyone clarify plans? As wivenswold said it makes sense to train drivers for 379s so that they can be put to good use.
There was word that Harwich Parkstone Quay might be used instead of Brantham. Is that viable?
I doubt they would move 379's off of the west, pointless training other crews on them when they can replace 317's (which are literally falling apart!)
I don't think people who are outside the railway industry realise the sheer hurdles & cost involved in training & relocating unfamiliar stock to a route.
The EMT HSTs will have to get an extension so why not get a short extension for the Norwich hauled sets if required? It would probably only be a few months. It would save a lot of time and money training Ipswich and Norwich drivers on 379s. Are 379s even route cleared to Norwich?
I'm surprised, do the 9 (according to Google Sat. View) electrified sidings belong to the Port Authority rather than Network Rail?Sorry to be picky but it's Parkeston Quay. Last word on that is that the port authority rejected any plan & refused to allow a long enough lease. Perhaps a few more £millions would help. Enough money has been wasted already so why not throw in a few £million more?![]()
I'm surprised, do the 9 (according to Google Sat. View) electrified sidings belong to the Port Authority rather than Network Rail?
Haven't they been used in the past for "warm storage" foe EMU's?
DC
All being well 170202 will be out & about from this week. After finally being reunited with its centre (56) car after it had to wait an available slot on the wheel lathe at Ilford. That was booked to be over this weekend.
How does that leave the diesel fleet? Is everything back in use or are some units still going away for mods / long term repairs?
Thanks,
Gareth