GRALISTAIR
Established Member
I was lying awake and thought that a big inefficiency in electrification work is mobilizing people to site. I was thinking that for say Transpennine (if-when it gets the go ahead) is so remote in places it would be very efficient if a HST was converted to have showers and beds and restaurant etc and even extra fuel and generators. Is this feasible or would the BCR be way too low for a project of this nature?