I'm not even sure who would pay for it as rail in Wales is now largely devolved - the UK government or the Welsh Assembly.
In an ideal world it would probably be both as the benefits would be felt by both Wales and England.
As we no longer fight the Irish or send mail by rail I don't see how the English would benefit from electrifying this route.In an ideal world it would probably be both as the benefits would be felt by both Wales and England.
That did not stop them building the motorway standard A55 (N.Wales Expressway) across Anglesey not so long ago, even though it is almost empty of traffic most of the time. I assume it was an EU sop to Ireland.The further west you go , the less is the (passenger) traffic , freight is effectively dead.
The OP must have A) looked and looked until they found an empty streach, then used that, B) clicked street view in a random area and took it as gospel or C) the street view car came through on a quiet day/it was a quiet stretch because that's how traffic flow works.I love the idea that the A55 is unused and empty.
That did not stop them building the motorway standard A55 (N.Wales Expressway) across Anglesey not so long ago, even though it is almost empty of traffic most of the time. I assume it was an EU sop to Ireland.
![]()
In any case, as others have pointed out the only part with any kind of business case is Crewe - Chester, and that's filed very much in the "Too difficult" bin - way too many low bridges and an even lower tunnel, you might as well start with a brand new line all together then rebuild the existing route.....
It is probably an ideal test for Grayling's "discontinous electrification" using neutral sections under bridges and in the tunnel. Adding small batteries to some of the Pendolinos could be viable and that would allow some Voyagers to go off lease in 2026. W&B could order an extra Stadler tri mode for the shuttle. I don't think its hugely likely but if electrification is not killed off nationally it is still a viable scheme if modified.
You have got to be kidding. It'd be on and off that often, you'd have an epileptic fit looking at the linelight. Half of the bridges should be flattened without too much disruption anyway as they for farm use.
The South Wales valleys are going to be electrified with earthed sections at low bridges. The switchover will be automatic, requiring no intervention from the driver. Let's see how that goes. I suspect it will turn out to be perfectly workable.You have got to be kidding. It'd be on and off that often, you'd have an epileptic fit looking at the linelight.
I concur, the A55 is a busy road!I love the idea that the A55 is unused and empty.
I concur, the A55 is a busy road!
In my mind the stretch over Anglesey will always be the A5!I agree - at least as far as Llanfair PG. Other than when a boat comes in at Holyhead though, the last 20 miles across Anglesey can be pretty quiet.
Off topic for a rail forum, but the old (Telford's) road across Anglesey is still A5. Only the new dual carriageway on a new alignment has the new number A55.In my mind the stretch over Anglesey will always be the A5!
Farm crossings are there for a purpose, to link the land on either side and enable the farm to work efficiently. What do you propose they should be replaced with, a costly underpass, or a 5 mile detour for stock and equipment along public roads?Half of the bridges should be flattened without too much disruption anyway as they for farm use.
It'd be on and off that often, you'd have an epileptic fit looking at the linelight.
Clearly not, and creating new farm crossings would be even worse! However a farm bridge is somewhat easier to replace than a road bridge as they are unlikely to carry any utilities, and probably in open country where a new bridge could be built alongside before demolishing the old one. As there is only one user it is also easier to negotiate temporary or permanent closures, and it may even be that the farmer only needs to use it at some times of year so it could be demolished and re-built when not in use.Farm crossings are there for a purpose, to link the land on either side and enable the farm to work efficiently. What do you propose they should be replaced with, a costly underpass, or a 5 mile detour for stock and equipment along public roads?
Surely you should be looking at the line ahead not just the linelight?![]()
Seeing as it's also it's our Auto drop device (ADD) indicator, I really don't want to see it flashing anyway., So it would be very hard to ignore!
Farm crossings are there for a purpose, to link the land on either side and enable the farm to work efficiently. What do you propose they should be replaced with, a costly underpass, or a 5 mile detour for stock and equipment along public roads?