Bletchleyite
Veteran Member
I know what Bury was before. But it was no use for any freight as it's a dead end branch line.
I know what Bury was before. But it was no use for any freight as it's a dead end branch line.
https://www.networkrailmediacentre....orthern-apologises-for-may-timetable-troubles
So very generic and very light on details
You implied you thought both Bury and Rochdale saw DMUs prior to Metrolink in your earlier post. There was a Bury-Heywood-Castleton line at the time of Metrolink conversion, with the Bury-Heywood section becoming part of the East Lancs Railway since Metrolink conversion of Bury-Radcliffe.
To be fair it does say they are still working on the plans so they might not know the final shape of any just yet.
What are we going to do to put it right?
Network Rail, Northern and GTR are urgently working on comprehensive plans to reduce disruption and give passengers the greatest possible certainty of train services, so they can better plan ahead. Unfortunately, it will take some time to deliver significant improvements to services, but we will keep passengers up to date on all changes we make.
What happened to the suggestion that the Rawtenstall line could go back under British rail and link to the Manchester line beyond Haywood, so Bury gets back on the national rail network?I know what Bury was before. But it was no use for any freight as it's a dead end branch line.
I know what Bury was before. But it was no use for any freight as it's a dead end branch line.
That route was closed to regular use long before Metrolink.
To be fair, more trams would remove more trains from the overused infrastructure and thus improve reliability.
So would more heavy rail infrastructure, to cope with the unavoidable (to everyone except TfGM) reality that large numbers of regional trains run through the city
Why is is that when some major issue comes up on the railway that loads post with what should have been done prior.
Recently, on a good day, around 95% of scheduled services have operated - but nowhere near that number have operated anywhere near to time.
I understand why you have such a bee in your bonnet about this service but the trouble with this line of thinking is that the logical conclusion is to either ban all cross-Manchester services (which will never fly with our elected representatives and with good reason) or to ban any reliefs from taking place on cross-Manchester services in Manchester. This would be very expensive to achieve!
To be fair, more trams would remove more trains from the overused infrastructure and thus improve reliability.
I'd go further - as I said, if only one of the two projects was affordable, they picked the wrong one. P15/16[1] would have solved a problem that's been a problem for years. The Ordsall Chord made it worse - much worse - by adding more trains to a line that was already full
Trafford Park was built in CLC territory in the 1890s to exploit the Manchester Ship Canal access nearby.
It is therefore dependent on CLC routes today for its rail access.
It always had good connections east-west but poor links north-south, thanks to the way the CLC developed independently of the LNWR system.
BR's closure of the route south via Chorlton (now part of Metrolink), made access a lot worse, forcing everything to come via Castlefield.
There are vague plans to move some Trafford Park freight services to the new Port Salford, which would have better links in all directions via Parkside.
However, it's gone very quiet on building the necessary short link to the Chat Moss route.
Another option is to build a new link to the WCML using the old MS&L alignment from Glazebrook to Haydock, and was mooted as part of the HS2 development.
Until then, we are stuck with heavy freight along the South Junction line.
Isn't that a far more expensive option ?
Because sometimes the naysayers are correct, and should have been listened to before the wheels came off and proved them correct ?
And nobody foresaw the issues this week!!. Always easy in hindsight
Things have never been perfect, but at the moment *any* delays/ disruption is going to be blamed on the changes (even those that were fairly typical before).
Even within a 5% tolerance, some things will go wrong daily, which will beg questions about "so you think its okay that MY train was cancelled" but the reality is that such things happened in the past, happen now and will continue to happen in the future.
It's impressive that removing the Scarborough - Liverpool service from the Piccadilly throat has freed up three paths per hour (in each direction), but the Chord seems a very expensive solution to that problem.
How has removing a service which runs once per hour each way managed to free three paths per hour each way?
How difficult would a link to the WCML at Warrington be ?
All this said, I suspect eliminaying a few freights is nibbling round the edges of the bigger problem - too many passenger trains for the track available
By not crossing the whole station throat. But that didn't need the Chord, it could have just been moved back to running via Chat Moss and Victoria without any of that.
There used to be a slow-speed spur from Warrington Central northwards to the WCML at Dallam, but it closed long ago and has been built on.
A freight junction really needs to be the other way, towards Bank Quay, but the levels and alignment are all wrong for that.
It's similar at Allerton where the only link is towards Lime St not towards Runcorn.
HS2b cuts across all this, maybe some solution might fall out of that (eg the suggested new link towards Liverpool as part of NPR).
I had understood the main purpose of the Chord was to remove reversing airport-bound trains from Piccadilly platforms 1-12.
Both Network Rail and Northern (David Brown) have apologised, but have not been able to say when things will improve.Greater Manchester Mayor Andy Burnham said rail operator Northern is in "freefall" after cancellations increased to almost 300 in one day.
Mr Burnham said at least 147 trains were cancelled or part-cancelled on 22 May and this had almost doubled to at least 281 on 29 May.
He said services are "actually getting worse" and "Northern's freefall shown no signs of slowing down"
Mark Carne, Network Rail’s chief executive said: “There is no doubt that the May timetable was finalised significantly later than normal for reasons that were both within and without our control. The consequences of that have been particularly hard for both Northern and GTR to absorb.
"But we are all firmly focussed on fixing this issue as quickly as possible to give passengers the reliable service they need and deserve. At the moment, in some parts of the country, that simply isn’t happening and for that I’d like to wholeheartedly apologise.”
Charles Horton, CEO, GTR, said: “We always said that delivering the biggest timetable change in generations would be challenging – but we are sorry that we have not been able to deliver the service that passengers expect. Delayed approval of the timetable led to an unexpected need to substantially adjust our plans and resources. We fully understand that passengers want more certainty and are working very hard to bring greater consistency to the timetable as soon as possible. We will also be working with industry colleagues to establish a timetable that will progressively deliver improvement.”
David Brown, Managing Director, Northern said: “We are doing everything we can to minimise cancellations and keep customers informed. It has been extremely difficult for many of our customers, in particular on a number of routes around north Manchester, Liverpool, and Blackpool extending up to Cumbria, and we are truly sorry for this.
“We‘ve agreed a number of actions with the Department for Transport and are urgently working with them on a comprehensive plan to stabilise our services. Such a plan is likely to take a number of weeks to deliver lasting improvements, but we recognise our customers deserve better and that’s what we’re focused on.”
It was, and I propose the much simpler and cheaper alternative of removing those through trains to the Airport and operating a dedicated Class 319 service from platform 11 instead. (Those using it as a terminus of convenience from the west into 13/14 could continue to do so). This would have the benefit of releasing a Class 185 as well.
But many people in here seem to think that airport passengers will be unwilling to pull their trolley cases the width of Picc on the flat, when they seem to cope just fine with pulling them about 4 times that distance from the Airport station to the check-in desk.
Not going to happen, especially when you consider there was a whole TSC inquiry into airport connections by rail. A shuttle service would just decimate passenger numbers travelling to the airport by train.
It might reduce them by a tenth, yes. That would not be a massive problem. I doubt it would be much more than that - Heathrow Express/Connect do well enough.
Oh, you didn't mean that, did you?![]()
Why is is that when some major issue comes up on the railway that loads post with what should have been done prior.
It is all, linked, disruption on one leads to disruption on the other, and the lack of recovery capacity through Castlefield means the problems snow ball.What has TPEs services via Piccadilly to do with Northern's problems in Lancashire - let's get back on subject!