The problem with an Emergency Timetable is that the knot of services make it hard to untangle individual routes.
A bus company can remove one journey per hour from all of its services (e.g. many do that on higher frequency routes during the summer school holidays), but it's easy to arrange that. With the exception of a handful of services (e.g. Piccadilly - Rose Hill Marple) there aren't many Northern services west of the Pennines that run better than hourly. Several corridors where the combined service is better than hourly, but it becomes harder to unpick such routes (e.g. you could argue that Manchester Airport - Manchester could drop one or two services per hour but that's not as simple as reducing a ten minute route to a fifteen minute frequency as the services have various routes/ termini beyond Piccadilly).
In the Bad Old Days, Arriva Trains Northern cancelled the Leeds - Castleford - Pontefract services long term to deal with staff/unit shortages - but that was a self contained route - would it be better to cancel some "Lancashire" services entirely than reduce a handful of hourly services to bi-hourly? And then, as more drivers are trained, do you slowly change the "Emergency" timetable a few times before getting back to 100%?
Once, in almost two weeks now, I've been more than 30 mins late. That's no worse than it's ever been. Other days I've been 2 mins later here, or 5 there, or 20 once; but again, that's normal. In fact it's a lot better than trains from Wigan to Manchester used to be.
I don't think either
@Moonshot or I are defending anyone, rather just pointing out that for most people, this isn't the apocolyptic catastrophe that some are making it out to be.
Fair points - it's hard for me to asses it objectively as South Yorkshire hasn't been affected by many of the changes/ improvements/ electrification... though
that does make me wonder why we've escaped from the effect of Rest Day Working east of the Pennines - was this only an agreement with ex-FNW staff?
But we've got a situation where various problems are getting muddled together and bad situations become worse. I don't think things are as bad as a lot of the posters on here, but then there seems little to be gained from trying to tell someone that things are 2% better than last week or that most services are running okay if they are only focussing on their local line.
I don't know why some posters seem to think that because Northern are doing OK over most of their network, that it's acceptable for them to be cancelling between 10 and 50% of trains a day on other parts of it
This is the problem with these threads. The fact that 99% of services are running (and running on time) is going to be of precious little consolation to you if your local line is the 1% canceled or significantly delayed.
There's no point trying to tell some people on here that there's a "bigger picture" or that the overall trend is improving (compared to this time last week) or whatever.
We used to accept a certain level of disruption daily, nobody ever expected 100% of services to be operated (and operated bang on time), but now every cancellation is being highlighted - just like a couple of years ago when every failed 319 was being seized upon (or, after a train crash, the tabloids get hysterical about every SPAD incident).