• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

91119: Returns to service and in Swallow livery too!

Status
Not open for further replies.

D365

Veteran Member
Joined
29 Jun 2012
Messages
13,195
Something that's just occurred to me with regard to the use of 90s on the ECML: Obviously when running Northbound the driver will be in the 90 so will know they're limited to 110mph... but heading Southbound and driving from the DVT, how does a driver make sure they don't forget what loco is on the back, and end up trying to get up to 125?

Surely it would just stop powering at 110mph? It’s not like the 170+153 combo where both units are powered.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

DarloRich

Veteran Member
Joined
12 Oct 2010
Messages
32,939
Location
Fenny Stratford
The issue does seem to be time, as there is currently one way of making HST trailers compliant, which is being done by Wabtec at Doncaster, but between XC, Scotrail, and GWR they've not got any space to also do the EMT fleet in time for 2020, which is why there has been plenty of discussion about what they (or rather, the next operator) are going to do come 2020.

Mass derogations perhaps?

there will have to be a derogation or the railway will grind to a halt.
 

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
18,324
Location
Glasgow
If a retrofit scheme is underway then I imagine a derogation would be politically acceptable.

The real question is how many HST trailers have a future.
Are we going to have fragments of every set in service? (ie. every power car with various numbers of trailers?)

I could see something along the lines of EMT getting good derogation for its HSTs and using spare trailers to lengthen the ex-GC sets to 8-car. Possibly even lengthening all sets to 9-car if possible.
 

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
18,324
Location
Glasgow
Surely it would just stop powering at 110mph? It’s not like the 170+153 combo where both units are powered.

I don't know if they are fitted with maximum speed limiters, and I think their speed set goes above 110, perhaps someone can confirm/deny.
 

D365

Veteran Member
Joined
29 Jun 2012
Messages
13,195
I don't know if they are fitted with maximum speed limiters, and I think their speed set goes above 110, perhaps someone can confirm/deny.

The only vehicle in a Mk4 consist that’s powered is the locomotive, so I don’t see why it would cause an issue. Don’t forget the Mk3 + DVT consists are capable of 125mph, but the Class 90 (or 68) is not.
 

Southern Dvr

Member
Joined
13 Oct 2010
Messages
995
The Class 90 is almost certainly ‘capable’ of more than 110mph but isn’t permitted to do so!!!

I would expect the same to apply as was the case on the WCML when you had a Class 86 (100mph) on the back instead of a Class 87/90 (110mph) and some sort of post it note, speedset, professional driving policy would prevent overspeeding.

The main problem came when (so I’m told) a southbound train changed driver and the relief driver was not told is was a Class 86 on the back!
 

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
18,324
Location
Glasgow
The only vehicle in a Mk4 consist that’s powered is the locomotive, so I don’t see why it would cause an issue. Don’t forget the Mk3 + DVT consists are capable of 125mph, but the Class 90 (or 68) is not.

I realise that, what I meant was I don't know if the speedset on the Class 90s themselves goes above 110 mph and whether you can physically go above 110 or if the locos have a device to strictly limit them to the maximum "permitted" speed. The 68s for example I believe will not exceed about 103 or the traction motors cut out and engine reverts to idle similar to the HSTs being limited to 128 mph.
 

alexl92

Established Member
Joined
12 Oct 2014
Messages
2,368
The Class 90 is almost certainly ‘capable’ of more than 110mph but isn’t permitted to do so!!!

Why is this? I know re-gearing has been discussed and dismissed before but it seems daft that if the loco can go faster on a 125mph route, it’s not allowed to?
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,716
Location
Nottingham
Why is this? I know re-gearing has been discussed and dismissed before but it seems daft that if the loco can go faster on a 125mph route, it’s not allowed to?
It may be capable of exceeding its maximum speed, in fact it almost certainly is as one of the class is normally tested on 10% overspeed during acceptance. However it isn't designed to do a higher speed routinely and to do so might cause problems such as increased wear and maintenance to the loco itself or the track. Uprating the 350s to 110mph needed minor changes to the unit itself plus a whole heap of paperwork to demonstrate that everything had been considered and it was safe to run faster.
 

gingertom

Established Member
Joined
19 Jun 2017
Messages
1,335
Location
Kilsyth
The Class 90 is almost certainly ‘capable’ of more than 110mph but isn’t permitted to do so!!!

I would expect the same to apply as was the case on the WCML when you had a Class 86 (100mph) on the back instead of a Class 87/90 (110mph) and some sort of post it note, speedset, professional driving policy would prevent overspeeding.

The main problem came when (so I’m told) a southbound train changed driver and the relief driver was not told is was a Class 86 on the back!

IIRC the 90 was designed as a 125mph loco but needed the brakes upgrading to operate at the higher speed. If this was a relatively simple (=cheap) upgrade then I think the work would have been carried out long, long ago.
 

ainsworth74

Forum Staff
Staff Member
Global Moderator
Joined
16 Nov 2009
Messages
31,123
Location
Redcar
Surely it would just stop powering at 110mph? It’s not like the 170+153 combo where both units are powered.

Unless the 90 is fitted with a speed limiter that restricts the locomotive from going above 110mph without any external intervention then, when driving from the DVT, there would surely be nothing stopping a driver who forgot they have a 90 on the back trying to get to 125mph.
 

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
18,324
Location
Glasgow
Unless the 90 is fitted with a speed limiter that restricts the locomotive from going above 110mph without any external intervention then, when driving from the DVT, there would surely be nothing stopping a driver who forgot they have a 90 on the back trying to get to 125mph.

From this Class 90 cab photo (not mine):Class_90_Cab.jpg
You can see the speedset only goes up to 110 mph.
 

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
18,324
Location
Glasgow
But that wouldn't help if being driven from the DVT presumably?

I've no idea really, I would assume that with the cab shut down the speedset would not be active in the 90 but I'm not familiar with how the TDM system works exactly, the FDM system is the one I do know exactly how it works.
 

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
18,324
Location
Glasgow
My impression was that the the speedset only works if the cab is active?

That's what I would think. But as the 90 is supplying traction power, it must be "active" to some extent of you see what I mean. I've no idea either way, hence why I was asking if anyone could confirm how it works.
 

ainsworth74

Forum Staff
Staff Member
Global Moderator
Joined
16 Nov 2009
Messages
31,123
Location
Redcar
That's what I would think. But as the 90 is supplying traction power, it must be "active" to some extent of you see what I mean. I've no idea either way, hence why I was asking if anyone could confirm how it works.
Yes very true!

Anyone able to give us a clue?!? :lol:
 

bonzawe

Member
Joined
30 May 2014
Messages
89
That's what I would think. But as the 90 is supplying traction power, it must be "active" to some extent of you see what I mean. I've no idea either way, hence why I was asking if anyone could confirm how it works.

In the book Train Doctor (Roger Senior) pg 155 there is a story edited a little

that after a set swap at Leeds, driving from the DVT driver initially had no issues, but going down stoke unable to attain 125 and intermittent wheel slip indications, reported to control and continued to London. Wheel-slip problems went away below 115, met by fitters in KX to be told he had a 90. Replied I'm not passed to drive those. After that printed warning placed in DVT when 90 used.
 

bonzawe

Member
Joined
30 May 2014
Messages
89
Interesting, so you can exceed 110 in a 90 ordinarily, it would seem. Do you know when that anecdote dates from?
The book quotes no dates but Roger was working as a technical Riding Inspector from the 1990's, from the book I think this story would be the early 2000's with GNER
 

Southern Dvr

Member
Joined
13 Oct 2010
Messages
995
Gather 1S18 (booked for a 91) has hit sheep near Berwick and it’s caused some damage. Could be that another one is out of action for a while.
 

tsr

Established Member
Joined
15 Nov 2011
Messages
7,400
Location
Between the parallel lines
Gather 1S18 (booked for a 91) has hit sheep near Berwick and it’s caused some damage. Could be that another one is out of action for a while.

Three trains hit sheep (10-12 between them...). The trains on 1S15 / 1S43 suffered slight damage.

1S18 suffered more extensive damage but is now on the move under its own power. Thunderbird to remain in the area - in case.
 

driver_m

Established Member
Joined
8 Nov 2011
Messages
2,248
Just to confirm. Yes you could exceed 110 with a DVT leading with a 90 on the back (or 86/87) . It's speedset was capable of 125 as it was passed for 125. The 90 speedset was limited to 110.
 

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
18,324
Location
Glasgow
Just to confirm. Yes you could exceed 110 with a DVT leading with a 90 on the back (or 86/87) . It's speedset was capable of 125 as it was passed for 125. The 90 speedset was limited to 110.

That was the impression I had.
 
Status
Not open for further replies.

Top