I understand that is the problem. To turn it around it is changes ends and go. If anyone is asleep they are going back to London. To shunt it someone needs to walk through the train and check. I am sure one of the drivers said that is why they want a platform at Stevenage rather than a siding.Some trains go into the sidings to come back out ten minutes or so later. It works as long as the train can be shut down and moved quickly. One drunk on the train sleeping and it's game over.
Great Northern's twitter feed has just advised somebody who was asking for May timetables to "check back at the end of the week" (https://twitter.com/GNRailUK/status/973892730081431553).
I have no idea if they're actually expecting to publish timetables by the end of the week, or if that's just a cleverly worded holding response with no actual information. It's a sad state of affairs that I'm naturally assuming the latter.
Oh, OK. I clearly don't read their twitter feed often enoughThey have said that every week since they missed their orginal deadline of 25th Feb.

Today as well? I must have got lucky. Yesterday was a pig.
I suspect maintenance is down to an absolute minimum on the 313s making them worse then they should be with TLC. Yes they are 40 years old and won’t last forever, I just don’t think GTR are trying as hard as they can to keep them running.
For interest how does the 0720 get to Letchworth. My understanding is it overnights from a previous days Moorgate working so they will need run a couple of empties to help.
I understand that is the problem. To turn it around it is changes ends and go. If anyone is asleep they are going back to London. To shunt it someone needs to walk through the train and check. I am sure one of the drivers said that is why they want a platform at Stevenage rather than a siding.
I understand the reason they can’t replace the 313s with 365s is for tunnel evacuations. Why not use the 387s instead and use the 365s to cover the routes the 387s are taken off? It feels like they’re mothballing the wrong trains.
As things stand yes but the timetable is incomplete and it's the extra services that are causing the issue as they have routed too many trains on the slow line and now realised that it's not going to work on GN.
In fact many scoffed day 24TPH through the core, the challenge is actually achieving that on GN.
If some of the proposed Cambridge to KGX services are routed on the slow in the morning peak from May then it won't work as the 313 will immediately screw up timings.
There are no additional services between Stevenage and London in the peak (eg 0700-0800), even when the additional services get loaded.
Also, on a 387, the emergency ladder (for the passengers side doors) is in a cupboard in one of the intermediate cars, where on a 313 it is in the cab area, along with another one that fits the emergency centre door. To exit through the gangway would need a ladder specially made with attachments etc. and would need to be kept in the cab area.
The NCL timetable seems to finally be up for May, with trains running on both branches, eg:
http://www.realtimetrains.co.uk/search/basic/MOG/2018/05/31/0707
Still missing the WGC-KGX semi fast services OR are GN seriously suggesting these are no longer running?
Looking better. Still the WGC - Kings cross peaks missing and some WGC - Moorgate peaks missing.
Are these the only services expected in the timetable that remain to be uploaded now? Assuming these do continue to run, does anyone know if these (as future Thameslink route TL8 services) will go over to Class 700s from May? I assume they could be 387s or 365s southbound, but not 365s northbound as according to the consultation draft timetable, all will have New Barnet stops. At present the 2V90, the 1758 London Kings Cross to Welwyn Garden City misses New Barnet and has a Hadley Wood stop instead, apparently to allow it to be formed of 8 car 365s without Selective Door Operation (and 317s/321s in the past).
One would imagine that assuming 313s no longer work these services, this timetable would be an opportunity for the last of the 313 peak single unit (3 car) workings, such as 2J38, the 0834 Stevenage to Moorgate to be lengthened to 6 cars. Does anybody know if that is planned?
Just to confirm - This service is currently 8 car and does stop at Hadley WoodNew Barnet has 8-car platforms. Hadley Wood has 6-car platforms.
Just to confirm - This service is currently 8 car and does stop at Hadley Wood
I've been catching the train for over a year and don't recall any change in length. You could be right though.I can't recall, but perhaps they've been lengthened recently?
Still missing the WGC-KGX semi fast services OR are GN seriously suggesting these are no longer running?
Are these the only services expected in the timetable that remain to be uploaded now?
New Barnet has 8-car platforms. Hadley Wood has 6-car platforms.
I've been catching the train for over a year and don't recall any change in length. You could be right though.