Creation of class 230 DEMUs from ex-LU D78s by Vivarail

Status
Not open for further replies.
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

samuelmorris

Established Member
Joined
18 Jul 2013
Messages
5,121
Location
Brentwood, Essex
I wonder what potential for technology sharing this project has. Could the learnings from this result in a battery pack being fitted to tube trains, for example, perhaps to get them to the nearest station if the power supply failed?
Pretty sure that's been done for decades. One set of traction motors (it may even be a traction motor singular) can run from the onboard batteries to nudge the units out of dead sections, e.g. into and out of the depots, as I recall? I'm sure the 73 stock has it as I've seen footage of it, not sure if it's common to every tube class.
 

Dstock7080

Established Member
Joined
17 Feb 2010
Messages
3,543
Location
West London
Pretty sure that's been done for decades. One set of traction motors (it may even be a traction motor singular) can run from the onboard batteries to nudge the units out of dead sections, e.g. into and out of the depots, as I recall? I'm sure the 73 stock has it as I've seen footage of it, not sure if it's common to every tube class.
Has never been adopted on Underground rolling Stock.
Overhead leads are the only way to move trains from within shed roads not fitted with traction current rails.

On board batteries are 2x 24v = 48v
 
Last edited:

alexl92

Established Member
Joined
12 Oct 2014
Messages
2,368
Forgive me if it’s been suggested before but could these units offer a solution where there is potential for a commuter service on a heritage line which wouldn’t pay if operated by heritage stock? For example, on the Worth Valley or Swanage Branches with their national network connections?
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,832
Location
"Marston Vale mafia"
Forgive me if it’s been suggested before but could these units offer a solution where there is potential for a commuter service on a heritage line which wouldn’t pay if operated by heritage stock? For example, on the Worth Valley or Swanage Branches with their national network connections?

Potentially, yes.
 

samuelmorris

Established Member
Joined
18 Jul 2013
Messages
5,121
Location
Brentwood, Essex
I think I have the Jubilee line at 0-30 in 13 seconds, I'm not sure the Victoria is much, if any faster, so 0-40 in <10 seems very unlikely, let alone on mainline stock.
 

mushroomchow

Member
Joined
14 Feb 2017
Messages
455
Location
Where HSTs Still Scream. Kind of.
This could then easily be replicated (Leicester - Loughborough for example in the same area).
BUT, if the acceleration isn't 0-40 within 5-10 seconds, it's not a huge improvement.

Low top speed, high acceleration will always be a big winner on local lines with many stops.

Problem is that those services A) operate far further than Loughborough nowadays (to Nottingham and Lincoln) and B) sizable stretches are rated faster than 60MPH.

You might just about get away with a 230 on the Nottingham - Lincoln portion, but they're not really suitable for the Leicester - Nottingham section. Benefits from the Leicester - Loughborough stretch would be lost on the longer, faster stretches to East Midlands Parkway and Beeston.

Now if they'd actually completed the Ivanhoe Line and the trains ran to Burton, that would be a different story.
 

hooverboy

On Moderation
Joined
12 Oct 2017
Messages
1,373
so why not put fibreglass noses on them and reduce drag?..in fact this could also double up as a safety feature,if filled with some kind of crumple-zone type material.....much better from a drivers perspective.
you can squeeze a couple of extra mph and conserve a bit of energy that way.

your average motorcyclist can tell you that it's a far more comfortable ride even at 60mph with a bit of fairing to redirect the wind...let alone the front end of a 230 which is nearly 3m*2 running right into it.
 

mushroomchow

Member
Joined
14 Feb 2017
Messages
455
Location
Where HSTs Still Scream. Kind of.
Hype mode activate! I presume these will be 2-car units?

so why not put fibreglass noses on them and reduce drag?..in fact this could also double up as a safety feature,if filled with some kind of crumple-zone type material.....much better from a drivers perspective.
you can squeeze a couple of extra mph and conserve a bit of energy that way.

your average motorcyclist can tell you that it's a far more comfortable ride even at 60mph with a bit of fairing to redirect the wind...let alone the front end of a 230 which is nearly 3m*2 running right into it.

The original concept art did have some fairing on the front, but that seems to have disappeared in the production models. Presumably considered an unnecessary expense, but you have a fair point as far as higher speed running is concerned. It's going to be a case of "wait and see" to determine the ride quality - the D Trains were always amongst the most comfortable ride on LU, but this will be a different beast I'm sure.
 

furnessvale

Established Member
Joined
14 Jul 2015
Messages
4,914
so why not put fibreglass noses on them and reduce drag?..in fact this could also double up as a safety feature,if filled with some kind of crumple-zone type material.....much better from a drivers perspective.
you can squeeze a couple of extra mph and conserve a bit of energy that way.

your average motorcyclist can tell you that it's a far more comfortable ride even at 60mph with a bit of fairing to redirect the wind...let alone the front end of a 230 which is nearly 3m*2 running right into it.
I would wager that the limiting factors regarding speed for these units are motor gearing and ride of the bogies, rather than any lack of horsepower and wind resistance.
 

jon0844

Veteran Member
Joined
1 Feb 2009
Messages
30,959
Location
UK
so why not put fibreglass noses on them and reduce drag?..in fact this could also double up as a safety feature,if filled with some kind of crumple-zone type material.....much better from a drivers perspective.
you can squeeze a couple of extra mph and conserve a bit of energy that way.

your average motorcyclist can tell you that it's a far more comfortable ride even at 60mph with a bit of fairing to redirect the wind...let alone the front end of a 230 which is nearly 3m*2 running right into it.

I don't know about any other design changes but I know they're now getting someone who does train liveries to work on these (source: Twitter, via Geoff Marshall) - so it should be interesting to see how they turn out given the prototypes look(ed) rather odd and unfinished.
 

BucksBones

Member
Joined
18 Jul 2017
Messages
340
I’m surprised there’s no interest in these from Chiltern for the Aylesbury-Risborough branch. It would free up much needed 165s.
 

dorsetdesiro

On Moderation
Joined
30 Oct 2017
Messages
766
Anyone reckon this will be a "pilot scheme" that other TOCs may closely watch to see how LNR get on with the 230s on the Marston Vale line?

If this goes successfully then other TOCs possibly could come forward with orders for rural/branch lines to replace Pacers in Devon/Cornwall, Wales and the North?
 

gazthomas

Established Member
Joined
5 Jun 2011
Messages
3,466
Location
Llandudno
I’m surprised there’s no interest in these from Chiltern for the Aylesbury-Risborough branch. It would free up much needed 165s.
All the more surprising given the historic relationship they have with Vivarail’s Adrian Shooter
 

Bantamzen

Established Member
Joined
4 Dec 2013
Messages
10,510
Location
Cheshire
Anyone reckon this will be a "pilot scheme" that other TOCs may closely watch to see how LNR get on with the 230s on the Marston Vale line?

If this goes successfully then other TOCs possibly could come forward with orders for rural/branch lines to replace Pacers in Devon/Cornwall, Wales and the North?

Well the North, as in Northern already has a comprehensive plan to replace Pacers with new 195s, plus cascades of 15x/170s. So no, they are not likely to be waiting to see how the 230s go.
 

47802

Established Member
Joined
6 Mar 2010
Messages
3,454
Anyone reckon this will be a "pilot scheme" that other TOCs may closely watch to see how LNR get on with the 230s on the Marston Vale line?

If this goes successfully then other TOCs possibly could come forward with orders for rural/branch lines to replace Pacers in Devon/Cornwall, Wales and the North?

Why would that be there is already a plan to replace Pacers up North and the South West so why constantly drag it up.

I remember Shooter making the following comment about D230's " We can make them like new trains not only that but the best new train you've ever had"

Yeh I think we will see on that one, in fact lets compare to a new train much of which we can do without stepping into either.

195 verses 230.

195 Higher Top Speed
195 Air Conditioning
195 Higher Seating Capacity
195 Toilet unclear as to whether a 2 Car 230 can have a toilet or not
195 Designed for 21st century Crash Regs, 230 designed for late 70's regs and strengthened up recently.
195 New train designed to be a DMU not a recycled EMU.
195 Looks like a 21st century train not a 1980's train
195 Uses proven diesel engine in rail application.

230 Unproven engine in rail environment.
230 May be cheaper to run
230 May be easier to maintain locally
230 May be cheaper to Buy/Lease but considering your buying a 35 year old train with some new bits may not be that cheap relatively speaking.
230 Train actually older than the train aimed at replacing i.e Pacer, with lower top speed
 
Last edited:

D365

Veteran Member
Joined
29 Jun 2012
Messages
13,200
I remember Shooter making the following comment about D230's " We can make them like new trains not only that but the best new train you've ever had"

Really? I’d like to see a source on that one.

Anyway, I really don’t think Vivarail are targeting Pacer replacement anymore. All things going well I’d really like to see them pushing the adoption of battery technology on the rail network. That’s where the interest should be and I’m glad they have taken the opportunity.

Don’t forget that Bombardier have stated their Aventras are capable of being fitted with batteries. It just needs the ROSCOs and TOCs to be convinced that this is very much a viable option.

The more investment we see going into battery technology, well, the more it will continue to develop.
 

D365

Veteran Member
Joined
29 Jun 2012
Messages
13,200
OK I stand corrected "Best new trains in the Country" was what he actually said":lol::lol:

Some would say that the Class 700s aren’t much of a challenge ;)

But in terms of pushing engineering innovation, like I’ve said they’re a leader on that particular front.
 

47802

Established Member
Joined
6 Mar 2010
Messages
3,454
Some would say that the Class 700s aren’t much of a challenge ;)

But in terms of pushing engineering innovation, like I’ve said they’re a leader on that particular front.

Yeh well we will see what the Marston Vale punters think of the "Best New Trains in the Country" and how reliable the Transit Van engine train turns out to be.

As for not targeting Pacer replacement well that's because nobody wants their junk as Pacer replacement, and I doubt the battery stuff offers anything over the large Manufacturers couldn't offer other than the fact that the D train is fairly light train.
 

Julia

Member
Joined
19 Jun 2011
Messages
379
What I think has been missing from the discussion is the possibility of ending up with a low-cost readily available spot hire fleet. The existing DMU fleet is intensively diagrammed (and the amount of complex interworking between branches and main lines is a symptom of that) and when a unit goes long-term sick either due to a mishap or an expensive failure, there's no slack. Ergo, cancellations and short-forms. If there was an option to pick up a 230 and put it on a self-contained branch-line diagram to free up a main-line unit, perhaps we'd see service levels maintained better...
 