does anyone know what arriva trains wales have planned for the next timetable change.

i know work is due to start on upgrading the chester to wrexham line to allow for trains every half hour in november, not sure if that would be ready for 2010.

trains to liverpool from wrexham were promised ages ago, ive not heard any more news about that.

if i was in charge of timetables, i would extend the bidston serive to shrewsbury (calling at gobowen only). and i will alter the heart of wales timetable so people can return home the same day.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,692
The December 09 timetable was only offered back to the TOC/FOCs just over a fortnight ago. They have to respond first and NR will make any tweaks necessary. As for Chester - Wrexham, if you mean the re-doubling and other bits, thats at least 2 years away. I wouldnt expect anything astounding to happen to the ATW timetable.
 

robert2000

Member
Joined
20 Feb 2009
Messages
444
Location
Chester
thank you for informing me about the work between wrexham and chester, i cant believe 2 towns so close together have a really poor rail service.

i hope there is an extra 1st class premier service because they have time to do holyhead to cardiff and back, twice in a day. holyhead to cardiff b4 9am would be nice.
 

robert2000

Member
Joined
20 Feb 2009
Messages
444
Location
Chester
that means the train wont have much of a wait at llandudno, unless an extra train is added to the service
 

TDK

Established Member
Joined
19 Apr 2008
Messages
4,164
Location
Crewe
The December 09 timetable was only offered back to the TOC/FOCs just over a fortnight ago. They have to respond first and NR will make any tweaks necessary. As for Chester - Wrexham, if you mean the re-doubling and other bits, thats at least 2 years away. I wouldnt expect anything astounding to happen to the ATW timetable.

Have they not yet finalised theit B Int to Marylebone for December?
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,692
No, clearance issues for the 158s, and a few internal wranglings, will be May 10, unless they come in with a late bid for Dec 09.
 

175001

On Moderation
Joined
3 Feb 2007
Messages
1,360
Location
Between Heaven and Hell
that means the train wont have much of a wait at llandudno, unless an extra train is added to the service
Yes it will mate,as the Dec 08 change,made it possible due to the fact that the train is now waiting 50 minutes at the Mayfield loop. This was done so that in future the service could go to the airport,which should be this December.
 

merlodlliw

Established Member
Joined
8 Mar 2009
Messages
5,852
Location
Wrexham/ Denbighshire /Flintshire triangle
thank you for informing me about the work between wrexham and chester, i cant believe 2 towns so close together have a really poor rail service.

i hope there is an extra 1st class premier service because they have time to do holyhead to cardiff and back, twice in a day. holyhead to cardiff b4 9am would be nice.

Minister of Rail in Wales wants the Chester to Shrewsbury line to have its dynamic curves ready for Gerald by December 2010 latest.
You are correct the two largest towns in North Wales & East Cheshire
have a poor rail service,Single track Wrexham to Saltney.
The brand new buses 5 an hour each way to Chester Station already running from Wrexham are in place for a total shutdown of the line,this service is shortly to call at Wrexham Stn soon to become an interchange,
--- old post above --- --- new post below ---
No, clearance issues for the 158s, and a few internal wranglings, will be May 10, unless they come in with a late bid for Dec 09.

MY fly on the wall agrees with you, nothing this Dec.
 
Last edited:

krus_aragon

Established Member
Joined
10 Jun 2009
Messages
6,105
Location
North Wales
I have a copy of Arriva's draft for Timetable 81 (Crewe/Manchester - North Wales) for the Monday - Friday services, courtesy of a statutory consultee. I haven't had the time to dig through it, but I've just glanced at it in comparison with last December's draft. The timings for the Llandudno-Manchester run appear to be identical (comparing mid-morning diagrams). No diagrams are shown between Piccadilly and the Airport, but a empty line has been added for Airport timings.

If anyone would like a copy of the draft, drop me a PM.
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,692
Minister of Rail in Wales wants the Chester to Shrewsbury line to have its dynamic curves ready for Gerald by December 2010 latest.
The Minister needs to consider his timescales then. The final option hasnt even been signed off by NR and wont be for a few months yet. They are not "dynamic curves" either, its just twin tracking at Wrexham and at Saltney.

MY fly on the wall agrees with you, nothing this Dec.

LOL, I wouldnt care if the fly didnt, considering I see the aspirations and plans from the start. If the 158s get their clearance, there is nothing to stop them starting in December if they want.
 

merlodlliw

Established Member
Joined
8 Mar 2009
Messages
5,852
Location
Wrexham/ Denbighshire /Flintshire triangle
The Minister needs to consider his timescales then. The final option hasnt even been signed off by NR and wont be for a few months yet. They are not "dynamic curves" either, its just twin tracking at Wrexham and at Saltney.

Do you mean twin tracks all the way? surprised



LOL, I wouldnt care if the fly didnt, considering I see the aspirations and plans from the start. If the 158s get their clearance, there is nothing to stop them starting in December if they want.

Can the ORR give consent that soon?, I was not aware ATW had applied,then
there would be months of pros & cons, as W/S & others are bound to object.
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,692
No, it isnt twin track all the way, the middle section stays single between the road bridges.

There isnt much WSMR can object to though, the paths are there and there is no moderation of competition to deal with as ATW have established contractural paths through the West Mids.
 
D

dylan_w

Guest
The brand new buses 5 an hour each way to Chester Station already running from Wrexham are in place for a total shutdown of the line,this service is shortly to call at Wrexham Stn soon to become an interchange,

I trust you have a reliable source for this information as it's the first I have (and I'm guessing anyone else on here has) heard of this! Who is planning on shutting down the line? Why has nothing appeared in the news about it? Is this just lazy conjecture due to the fact an intense bus service exists between Wrexham and Chester stations?

I'm sure the inhabitants of Gresford, Rossett and the other villages between Wrexham and Chester appreciate the fact that they have direct links to both stations. I'm assuming the bus will terminate in the car park of Wrexham General if your info is correct? Either that or it is to be rerouted via the bypass?
 

TDK

Established Member
Joined
19 Apr 2008
Messages
4,164
Location
Crewe
...oh, the irony...

It may be a good idea for you read back on the objections submitted by ATW before WSMR launched, total poppycock as all their objections or most of them especially the proposed downturn in PPM were incorrect
 

krus_aragon

Established Member
Joined
10 Jun 2009
Messages
6,105
Location
North Wales
It may be a good idea for you read back on the objections submitted by ATW before WSMR launched, total poppycock as all their objections or most of them especially the proposed downturn in PPM were incorrect

Network Rail's website shows ATW's Marylebone consultation as having been completed, but doesn't have any of the consultation responses. I can't find WSMR's original application at the moment.
 

merlodlliw

Established Member
Joined
8 Mar 2009
Messages
5,852
Location
Wrexham/ Denbighshire /Flintshire triangle
I trust you have a reliable source for this information as it's the first I have (and I'm guessing anyone else on here has) heard of this! Who is planning on shutting down the line? Why has nothing appeared in the news about it? Is this just lazy conjecture due to the fact an intense bus service exists between Wrexham and Chester stations?

I'm sure the inhabitants of Gresford, Rossett and the other villages between Wrexham and Chester appreciate the fact that they have direct links to both stations. I'm assuming the bus will terminate in the car park of Wrexham General if your info is correct? Either that or it is to be rerouted via the bypass?

The taxi office at Wrexham Station is to be established within the Station to create space now objections have been overcome, I am surprised you have not heard about the interchange, the brand new buses have been put in place,all marked Wrexham/Chester station run by Arriva, this is not conjecture ask any bus driver why they are rerouted to Chester Station.
The line as to be shut down for semi Double tracking as the planner I think
knows a lot about this.
I agree it is nice to have five buses an hour now routed via the villages
you quote. When Wrexham General becomes an interchange all Chester
Buses will call at Wrexham General while the line is semi double tracked.
A recient meeting of SCRUA was briefed on this by WCBC & ATW
--- old post above --- --- new post below ---
...oh, the irony...

Of course the Irony, read ATWs 17 page objection to W/S starting a service
between Wrexham & London, I did, the ORR was not fooled by it.
--- old post above --- --- new post below ---
Network Rail's website shows ATW's Marylebone consultation as having been completed, but doesn't have any of the consultation responses. I can't find WSMR's original application at the moment.

I agree no responces shown, and there were many,Statutory & Voluntary sector responces negative to the idea, as well as positive.
--- old post above --- --- new post below ---
I have a copy of Arriva's draft for Timetable 81 (Crewe/Manchester - North Wales) for the Monday - Friday services, courtesy of a statutory consultee. I haven't had the time to dig through it, but I've just glanced at it in comparison with last December's draft. The timings for the Llandudno-Manchester run appear to be identical (comparing mid-morning diagrams). No diagrams are shown between Piccadilly and the Airport, but a empty line has been added for Airport timings.

If anyone would like a copy of the draft, drop me a PM.
yes please, will do
 
Last edited:
D

dylan_w

Guest
The taxi office at Wrexham Station is to be established within the Station to create space now objections have been overcome, I am surprised you have not heard about the interchange, the brand new buses have been put in place,all marked Wrexham/Chester station run by Arriva, this is not conjecture ask any bus driver why they are rerouted to Chester Station.
The line as to be shut down for semi Double tracking as the planner I think
knows a lot about this.

I hadn't heard about any of this (I do spend most of my time in the East Midlands these days and sometimes rely on forums like this and the er...Evening Leader website (!) for info about home).

Is this something that will happen if the infrastructure work goes ahead or has the installation of new track north of Wrexham already been approved? I thought this was still being discussed and nothing had been confirmed yet?
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,692
Its up to GRIP stages 3 and 4 which means its at the point where a final option is chosen and performance modelling etc is undertaken. If the results arent favourable then it wont be taken forward, though the chances of that on this scheme are very slim.
 

anthony263

Established Member
Joined
19 Aug 2008
Messages
6,892
Location
South Wales
It should also be noted that rumours are flying about which are looking to be very true that the WAG express is to be withdrawn from december 2009
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,692
Its been offered back by us for December 09, unless WAG tell ATW to pull it which Id find unliklely, Id imagine it to run. Especially when the Wrexham Saltney job and other associated work is linked with it.
 

robert2000

Member
Joined
20 Feb 2009
Messages
444
Location
Chester
so when will the chester wrexham line be closed from and for how long.

and are ticket valid via hawarden/shotton from wrexham to stations beyond chester and vice versa. (chester to wrexham/chirk via shotton)
 

merlodlliw

Established Member
Joined
8 Mar 2009
Messages
5,852
Location
Wrexham/ Denbighshire /Flintshire triangle
I hadn't heard about any of this (I do spend most of my time in the East Midlands these days and sometimes rely on forums like this and the er...Evening Leader website (!) for info about home).

Is this something that will happen if the infrastructure work goes ahead or has the installation of new track north of Wrexham already been approved? I thought this was still being discussed and nothing had been confirmed yet?

A couple of points,the taxi office is being shifted into the main building(W/S
area),this is to create yet more parking spaces on the R&J end and allow buses to swing around easier at the sorting office end is what we were told by WCBC, surprising the only objection to moving the taxi office came from the stations Management.

As far as the WAG Express is concerned, nothing tells us it is to finish,in fact the opposite, the Minister is still talking about a South/North, on the final day of the Assembley the local A.M Lesley Griffiths thanked the Minister for
informing that all Holyhead/Cardiffs will travel by Wrexham when the track
is completed.

The track from Wrexham to Saltney is also now a top priority according to the
A.Ms, WCBC have also got this pledge.

The WAG air, Mona to Roose is more at risk than the Rail Service,now we have all this chatter about ATW to Ringway which should have occured years ago,
--- old post above --- --- new post below ---
so when will the chester wrexham line be closed from and for how long.

and are ticket valid via hawarden/shotton from wrexham to stations beyond chester and vice versa. (chester to wrexham/chirk via shotton)

no idea what will occur.Several thoughts on this, but look like its the bus.

I dont see a shuttle to Shotton, but who knows.
 
Last edited:

merlodlliw

Established Member
Joined
8 Mar 2009
Messages
5,852
Location
Wrexham/ Denbighshire /Flintshire triangle
Those are two different airfields on Anglesey. Valley has the main RAF training school, mountain rescue and the flights to Cardiff (Rhoose). Mona is a smaller relief airfield in the centre of Anglesey.

Yes I confused the two, you are both correct, I was thinking of the one opposite the Showground with the large revolving antenna. Below quote from the DP 16th July.

The WAG’s Wales Transport Strategy also said air service could be renewed after the current deal expires in May 2010.

A WAG spokesman said: “Officials are currently considering options for the North-South air service after May 2010.”
 
Last edited:

krus_aragon

Established Member
Joined
10 Jun 2009
Messages
6,105
Location
North Wales
When looking at their Transport Plan, it's clear that they are more enthusiastic about rail for north-south travel:

WAG on rail said:
We will:
  • Continue to support our flagship Y Gerallt Gymro Holyhead to Cardiff fast train service, and a programme of continued improvements in rail services between north and south Wales.
  • Develop plans to enhance the capacity of the section of rail between Shrewsbury and Chester via Wrexham to permit fater service between North and South Wales, and potentially more frequencies, by 2011. This will enable all north-south service to be routed via Wrexham.

WAG on air said:
We will:
  • Undertake a review of options for the intra-Wales air service, following the expiry of the current contract in May 2010.
 