Given the present poor attitude shown by XC to its passengers and the fact using any extra stock involves additional costs that DaFT/ Treasury won't fund there is 0 chance of them using the 360s on any service.
The Plan is the Camp Hill Cords to move the Hereford's, Leicester's and Nottingham-Cardiff's out of New Street, some people are anti that and I understand why but it is the only way capacity can be released at New Street and at Proof House junction.Sounds good in theory.
At the moment we have:
- Just two trains per hour between the largest cities in provincial England
- Under five hundred standard class seats per hour between the two cities
- A wholly electrified line between the two cities that only sees a token electrified service (the 06:27 service from Piccadilly)
- No spare stock suitable to increase capacity on existing XC services (until some 1970s trains are freed up by IET in a year or two - bearing in mind that ScotRail have first dibs)
- Hundreds of modern EMU carriages with no home to go to (inc 350s, 379)
...it doesn't seem unreasonable to suggest changing something here - it seems a lot more pressing than a lot of the "problems" on here that people are so keen to solve.
Worth remembering that Manchester had no direct service to Bristol/ Devon/ Cornwall in VT days (when the "south west" service was 3tp2h to Newcastle and the ECML and 1tp2h to Scotland up the WCML with nothing through Manchester)
Similarly, Liverpool used to have direct services to Bristol/ Reading etc, but now gets more seats as far as New Street instead.
Someone somewhere knows the percentage of Manchester passengers who use services beyond Birmingham to Oxford/ Southampton/ Bristol/ Plymouth etc - I have no idea - but there's maybe a trade-off to be made between the (larger?) number of passengers travelling between Manchester and Birmingham and the (smaller?) number heading between Manchester and stations further south.
I take the point about trying to reduce the number of terminating services dwelling at scarce New Street platforms but we could do something about that by joining up some of the ex-Central Trains services - e.g. Nottingham, Hereford, Leicester, Shrewsbury. But the railway seems to go round in circles on issues like this - we want to chop up unreliable longer services but then we want to tie such services back together to avoid them occupying platforms at congested stations.
The Plan is the Camp Hill Cords to move the Hereford's, Leicester's and Nottingham-Cardiff's out of New Street, some people are anti that and I understand why but it is the only way capacity can be released at New Street and at Proof House junction.
Someone somewhere knows the percentage of Manchester passengers who use services beyond Birmingham to Oxford/ Southampton/ Bristol/ Plymouth etc - I have no idea - but there's maybe a trade-off to be made between the (larger?) number of passengers travelling between Manchester and Birmingham and the (smaller?) number heading between Manchester and stations further south.
Move them where? Moor St/Snow Hill?
Camp Hill Cords moves them into the proposed platforms five and six at Moor Street with all of the Chiltern stuff running up to Snow Hill with platform four re-instated.Move them where? Moor St/Snow Hill?
I attended a meeting a few weeks ago in the Class 309 buffet car currently at the ERM. Superb vehicles which were well received when they ran a Manchester to Stafford peak service. The Class 360 would also be received likewise if it were operated as a regional Manchester to Coventry service. If you look at fares on offer from Liverpool to London on LNW regional services then compare with Manchester London, you will see the potential for an additional operator between Manchester and London. Manchester to London is one of the biggest long bus flows in BritainAnd they have been before - pre-Princess North West Regional Railways used to run hourly Manc-Brum using Class 309s. Wouldn't be any harm in doing that, and it would be a benefit to those who like competition.
Move them where? Moor St/Snow Hill?
As a regular endurer of the Leicester - Birmingham sardine can, getting to alight at the gorgeous Moor Street as opposed to the polished turd that is New Street would certainly be a silver lining! Shame it's completely impractical without track layout changes. Hell, there's more chance of a future interchange with HS2 at Curzon Street.
The XC routes lumbered with 170s, sometimes 2 car at rush hour, are probably the only ones on the entire railway network where a Voyager taken off the services discussed would be a step up, if only for the additional seats. I feel dirty even saying that.![]()
I attended a meeting a few weeks ago in the Class 309 buffet car currently at the ERM. Superb vehicles which were well received when they ran a Manchester to Stafford peak service. The Class 360 would also be received likewise if it were operated as a regional Manchester to Coventry service. If you look at fares on offer from Liverpool to London on LNW regional services then compare with Manchester London, you will see the potential for an additional operator between Manchester and London. Manchester to London is one of the biggest long bus flows in Britain
As a regular endurer of the Leicester - Birmingham sardine can, getting to alight at the gorgeous Moor Street as opposed to the polished turd that is New Street would certainly be a silver lining! Shame it's completely impractical without track layout changes. Hell, there's more chance of a future interchange with HS2 at Curzon Street.
The XC routes lumbered with 170s, sometimes 2 car at rush hour, are probably the only ones on the entire railway network where a Voyager taken off the services discussed would be a step up, if only for the additional seats. I feel dirty even saying that.![]()
But, back to the 360 idea, a source of mine from Northampton Kings Heath has said that rumours are abounding that WMT (well, LNR) may well be hoovering up the ex-GA 360s...
EMT meanwhile would be an ideal place for them...the Corby service could be 379-operated.If the Class 345 operation to Heathrow was still on time I could imagine Heathrow loaning out their 360s. The 379s would make zero sense for WMT with the Aventras coming in.
EMT meanwhile would be an ideal place for them...the Corby service could be 379-operated.
Given the MML's previous experience with 387s and that the services on the Thameslink lines are currently 100mph only, they could be interwoven without much issue...possibly.
As you mentioned, the 360/2s are BAA-owned, so where they end up is BAA's discretion.
XC HSTs being made PRM compliant with the sliding doors. The first set is currently in Wabtec for the work. Only the five existing HST sets are being done for XC - they are not getting any more sets.Sorry if this has been said, but what’s actually happening with cross country’s hst’s? Are they any plans to make the prm compliant within the next 2 years? And are they getting any cascaded hsts for gwr or vtec? If not then what are they actually going to do? I smell chaos.
Because they are in the last two years of their contract and not in a position to lease any new stock. Need to ask DfT to specify more stock for the next franchise.Thanks 43096. Why aren’t cross country getting any more hst’s? Surley giving them to cross country to provide a much needed capacity boost is better then scrapping them? I thought it would be a no brainier?
I attended a meeting a few weeks ago in the Class 309 buffet car currently at the ERM. Superb vehicles which were well received when they ran a Manchester to Stafford peak service. The Class 360 would also be received likewise if it were operated as a regional Manchester to Coventry service. If you look at fares on offer from Liverpool to London on LNW regional services then compare with Manchester London, you will see the potential for an additional operator between Manchester and London. Manchester to London is one of the biggest long bus flows in Britain
I have a little feeling the 397 or 387's would eventually end up on the MML in a year or so, Im sure the 379's can be upgraded to 110mph without much issues.
Don't expect much support from DfT on this one. The poor service between the two cities is a prime example of "why we need HS2", the worse the service gets the more justification they will have to invest billions on one project rather than using the money for small-scale improvements across the country.
Don't expect much support from DfT on this one. The poor service between the two cities is a prime example of "why we need HS2", the worse the service gets the more justification they will have to invest billions on one project rather than using the money for small-scale improvements across the country.
At what point has the XC service from Manchester to Birmingham 'got worse'?
I'm merely alluding to a Governmental propensity to create problems to prove that less-than-popular schemes are necessary.