Okay - let's bank all this about drawbacks of a Light Rail conversion.
Open questions to people who think LR conversion has too many drawbacks to be contemplated:
What would be your solutions to areas not currently served by the HR Valley Lines? Where would you like to see extensions? What sort of services would you like to see? Where would these be routed / terminate? What mode of transport should be used?
I think you overestimate the public. Especially in a situation where there's no accountability, no opposition, and no media scrutiny as gareth950 alludes toAs I've said though, at some point all of these details are going to have to be made public. That is going to have to be before any real expenditure starts. If the scheme is genuinely, irredeemably rubbish people are going to find out. The public is not that stupid.
How much heavy rail capacity would Cardiff Central have if it lost 2 eastern tracks and 3 platforms to light rail?
This is the view from Railfuture Wales Branch.
gareth950 might have more up to date knowledge but i'm 99% certain that the waste land you identified on google maps to run a branch off the Bay line to Callaghan Square as been earmarked for office block development and might even have work already started on it.
Reminder that the proposed conversion cost for all of these lines is still only the same as the projected cost for the rebuilding of Cardiff Central
I've detailed before but I think Aberdare-Hirwaun, Ystrad Mynach-Bedlinog/Merthyr East, Cardiff-Beddau, Ebbw Vale-Newport and a few other schemes could be done relatively easily, along with a few extra stations. Electrification with fast-accelerating EMUs like 321s, 322s and 323s which are all available soon, a massive upgrade on current trains and in good condition. Services should largely continue as now but with more carriages. Then in the future you can work on more ambitious reopenings
It doesn't need to be any more complicated than that. The fact that it is with this SWM proposal is more indicative of how the WAG wants it to be bigger and more complicated, purely for the sake of it
I think you overestimate the public. Especially in a situation where there's no accountability, no opposition, and no media scrutiny as gareth950 alludes to
The problem with Welsh politics is that Welsh Labour are safe as houses and the opposition is disorganised and divided. Plaid haven't broken free from limited appeal because they just don't have anyone to lead them, and the Welsh Tories are confined to well-off areas and are led by a pro-Leave right-winger, with both parties wanting different things. And the moment they agree on an issue, Welsh Labour can just play them off against each other by saying "Plaid claim to be socialist but they're actually in bed with the Tories"
Any kind of political opposition to the SWM is inevitably going to be divided. The Tories will scrutinise the costs. Plaid will say that it's not ambitious enough. I find it extremely unlikely that any of the major political parties in Wales will oppose it on the basis of it being a terrible idea. In fact, I'm sure that when it's announced, the reaction will be broadly positive from all parties. There's too much political capital in the SWM as a potential transformative project for a party to oppose it flat out, as the basic idea of it is still inherently a good one - that of investment in green public transport. It's just that the application of it by Ken Skates and Labour is going to be absolutely disastrous. No political party will therefore want to oppose it too much at this stage - there's more to be gained in opposing the M4 relief road
The only time any genuine scrutiny of this will be put forward in the media, it'll be framed as "some transport expert says that it would be bad because X, Y and Z". It'll get about two minutes on the local news and it'll be positioned next to some suit politician saying "actually it's going to be great because it demonstrates we're committed to investing in public transport in South Wales", and that'll be as far as it goes. It'll be presented as the most boring thing imaginable and so no one will take any interest in it. If there's any public outcry, it won't happen until it's way too late
The only people who can stop this are Grayling and the losing bidders, though even then I don't hold out much hope. I wouldn't be surprised if the WAG decide to say that none of the bids were good enough and they're taking it in-house - I think that's what they really want to do
Pedantic point (sorry) but Corbyn is leader of the UK Labour Party, not the English Labour Party. Ordinary Welsh Labour members have a bigger say in electing him than in electing their Welsh leader.
Well, they couldn't have been very well-informed then, as neither were standing for a Welsh seat.Corbyn was completely removed from the Welsh Labour GE campaign last May. Welsh voters could've been forgiven for thinking they were being asked to elect Carwyn Jones as UK PM.

I did some door knocking during the GE and and people were increasingly saying "why is Carwyn on all the literature, we're not voting for him?". Welsh Labour increasingly don't want anything to do with the Westminster party.Well, they couldn't have been very well-informed then, as neither were standing for a Welsh seat.![]()
Plenty of trams use super capacitors now. Part of the Birmingham tram network extension will be catenary free.A tram can be powered by batteries, diesel, steam, or even a horse
Grayling was up before the Transport Committee last week and said that he is expecting the WAG will follow his decision to not electrify Cardiff Swansea by ditching the Valleys electrification.
It also strikes me that the posters on this thread who are most enthusiastic about converting the Valley lines to light rail, are posters that don't actually live in Cardiff, the Vale and the Valleys, and so only see the network from a 'tourists POV'. Of course you are entitled to have your say on these forums on your ideas for the network, but only visting Cardiff to use the Valley lines a few times a year, is not the same as having to use the network on a daily basis and so seeing first hand how the network runs every day, and what the challenges are.
Much like the people working for TfW and the Welsh Govt ministers in charge, I suspect.
And the way to deal with that conundrum is to develop a separate tram system for Cardiff and the suburbs that complements and operates in addition to, rather than replaces, the existing heavy rail system. Conservative Assembly member David Melding has suggested closing some roads in Cardiff entirely to give them over to buses and cycling. Maybe that's what should happen here. Instead of inconveniencing existing users of the HR network who simply want longer trains that can run at the increased frequencies enabled by CASR, which in turn accommodates growth, inconvenience motorists instead by forcing them onto new tram lines running out to the suburbs of east, west and north west Cardiff. After all, the aim of the Metro is to get people out of cars.Agree that current, daily experience can be enlightening, but I have done my time as a commuter on the Valley Lines in the past. Nothing has changed - service patterns / frequencies etc. - in the intervening years, apart from an increase in overcrowding. It's a simple system.
It may also be the case that people who use the service on a daily basis are more resistant to any potential change since it's their personal journeys that could be affected, and that is of course, understandable.
For example, if I lived in Penarth, then I wouldn't want the train to deviate from its current service pattern or route. I wouldn't want it converted to light rail, and diverted to serve parts of Grangetown via any on-street running lengthening my journey time. I wouldn't really be interested in any additional stops either, lengthening my journey time. It currently suits me just fine. I get on at the start of the line. I get 4 trains an hour, and I only have 2 stops before the city centre and it takes about 10 minutes. On practically all measures as a commuter, I'm sitting quite pretty.
And frankly, if I were doing my old commute from Ystrad Mynach to Cardiff Queen Street, then I wouldn't be that impressed with the new station in Energlyn and Churchill Park - (why? It's about 10 minutes' walk from Aber), and I'd be even less impressed with the 2 proposed intermediate stations between Heath High Level and Cardiff Queen Street - that's one of the only quick parts of the line currently - a good distance with no stops and for the Valley Lines - the trains go along at a decent rate. So that's extra time on my journey with no personal benefit...
But when someone in transport planning is looking at what to do with the system, they have to also consider people who are currently not served and are presumably trying to address commuting growth, congestion, extensions and various other factors. I think I said previously - not everyone can be a winner in any reorganisation of services. The trick is surely to end up with many more winners than losers.
However, the messages from most posters who actually live in Cardiff or use the network on a regular or daily basis, is that the light rail plans won't work and the current system of cross-city journeys from the Valleys to the Vake throuh Central must be kept. If it ain't broke - why fix it?
The Valley lines are not broke - yes extra capacity is urgently needed as well as frequency enhancements. The infrastructure to enable this has been delievered - most platforms can accomodate 6 car trains, CASR has delievered th signalling capacity needed to enhance frequencies.
The costings that Gareth Marston has posted show that almost all of the entire budget for electrifying the Valleys (currently standing at around £700 million) will be taken up from the initial LR conversion of the HR lines north of Queen St. So when the money runs out on blue, how will the green and amber schemes be delivered? Westminster will say 'not interested', we won't be able to go to the ERDF.........
As a commuter on the network myself, I can 150% guarantee that if you asked commuters whether they want a 6 car train every half hour from the heads of the Valleys (tripling the capacity we have now), with more 6 car trains starting from Pontypridd / Caerphilly to serve the commuters closer to Cardiff further down the line, or a tram every 15 minutes from the heads, they'd go with the 6 car half hourly train.
Cardiff is not a 24 hour city like London or Manchester. The vast majority of commuters come down from the Valleys and the Vale to be in work for 9am. The network is dead quiet mid morning until around 3pm when the schools finish, when 3 cars would be fine, then the evening commute starts. The vast majority of all the new jobs to be created in Cardiff in the next 10 years are going to be more 9-5 office jobs.
Maybe at weekends there is more of an even spread of passengers throughout the day, especially of course on Match days at the Stadium when 6 x 20m trains could be real crowd busters.
CASR has laid the ground for HR electrification, even if wires only go to Abercynon & Bargoed. The existing freight only lines to Hirwaun and Trelewis could easily start running passenger services with some upgrades. If nearly all of the budget is going to be spent just on the initial LR conversion, with all the consequences for the Vale services (who will get nothing), cross-city running etc that means, leaving very little if no money for any extensions, what's the point?
As this is such a political project I'm amazed that WG are so laid back about giving the Valleys shiny new trams, but leaving the Vale with diesel trains and curtailing cross -city journeys at Central. The Vale is a marginal seat - Labour have it in the Assembly but not at Westminster.
And the way to deal with that conundrum is to develop a separate tram system for Cardiff and the suburbs that complements and operates in addition to, rather than replaces, the existing heavy rail system. Conservative Assembly member David Melding has suggested closing some roads in Cardiff entirely to give them over to buses and cycling. Maybe that's what should happen here. Instead of inconveniencing existing users of the HR network who simply want longer trains that can run at the increased frequencies enabled by CASR, which in turn accommodates growth, inconvenience motorists instead by forcing them onto new tram lines running out to the suburbs of east, west and north west Cardiff. After all, the aim of the Metro is to get people out of cars.
It's highly likely that any mooted LR extensions in the Valleys will end up as Bus Rapid Transit routes when the budget is blown on the first phase of Valleys LR conversion, which is inevitable. Which renders the whole arguement for LR Valleys conversion void.
That Cardiff has defined commute times is not helpful for the HR case. I've said before that the massive peak capacity HR can provide is often made redundant by the fact that most of the time it's the off-peak and HR doesn't scale well. Those 6 car trains running in the peaks would be wonderful for those passengers but they'll be utterly useless the rest of the time, sitting in sidings doing pretty much nothing at all. London and the South East are used to that but this is warranted because of the sheer amount of money commuters pay in season tickets.
Well, it is and it isn't. If you wire it to 25kV and use Class 319s or similar (or the soon to be scrapped, it seems, 323s), you've got cheap rolling stock that is long since paid for. Just like with ex-LM, it doesn't matter that the 319s only do a couple of runs a day - they are cheap capacity. In time of course by all means buy a base set of new EMUs for the basic service, but keep the old kit for boosting peak capacity.
Not an option with the trams.
It was quite a good watch with Louise Elman interrupting Grayling and the Committee's questions constantly for the first hour each time she thought she had found a new argument for spending £1bn saving 1min on the journey to Sheffield, only to be left railing about how daft it was for DfT to have ever agreed to the scheme in the first place.
Perhaps she should catch up with Lord Adonis who thought the purpose of a business case was to justify what he wanted to do rather than critically evaluate and compare all of the options.
Well, I guess whoever is responsible - TfW / WAG / Franchise bidders - will have looked at the existing spine of railway lines and concluded they are a solid foundation to build a new network.
Leaving it as Heavy Rail to suit existing users means that users of any future expansions will have to face a tram network, 100% based on on-street running. That is - if there's any money left after paying for the HR electrification - which I'm far from convinced will be cheaper than the £600m LR conversion.
Does it need transformational improvements, though? Or would the passengers find recreating Merseyrail (OHLE version with a cross city line instead of tunnels which were only needed because building heavy rail above ground in an existing city was not an option) perfectly acceptable?
OK, Merseyrail can be a bit of a money pit at times - but it is very popular locally nowadays, and seems to have shaken off the "Miseryrail" title under more recent managements.
It was moved.Didn't you post this exact same piece on the MML electrificafion thread? You do realise that enlisting Grayling to support your obsession with preventing electrification is not going to win you many converts (or should that be, non-converts) ?
But what you are arguing in favour of is a system which requires almost everyone to endure on-street running, including passengers who currently by-pass congestion on the approach to central Cardiff using rail alignments. How is that any better than maintaining the existing segregated rail lines, and adding on street trams within Cardiff? How is it likely to cost less?
On the contrary. I've already stated I favour turning the City Line and the line through Llandaff into a City Circle. Route all the existing services as tram/trains in a circle clockwise and counter-clockwise using the existing rail infrastructure. Rhymney/Coryton services can continue through Cardiff Central on their current routes / or be diverted to any other terminus points.
It'll cost less as you have the advantage that any additions to the system can utilise the existing rail infrastructure. So say a tram extension to Cardiff Gate in the North East can run on the existing Rhymney line to Lisvane or Llanishen, and then go on street for the last part of its connection. Rather than having a tram line dug along the street all the way from central Cardiff out the to the far North eastern suburbs. Same for other Cardiff extensions of Valleys extensions.
But what you are arguing in favour of is a system which requires almost everyone to endure on-street running, including passengers who currently by-pass congestion on the approach to central Cardiff using rail alignments. How is that any better than maintaining the existing segregated rail lines, and adding on street trams within Cardiff? How is it likely to cost less?
Mention has been made about the costs of running HR v LR. If for example, twice the number of tram services were operated v the number of trains under the present system - and you paid the tram drivers half the pay of the train drivers, then one would assume that you have a cheaper to operate system? However, what must also be taken into account is the payload. If one train driver can take a six coach train full of people during the peak, then surely that would be at a lower cost compared to carrying the same number of people on three 2 coach trams? (Mention has been made that the trams can carry more people - but, these may be standing and therefore less desirable to the travelling public - which could encourage car usage).
Mention has also been made of the fact that during the working week, the valley line trains have relatively low loadings. The retired - who could be using these trains, tend to use the buses - because they are free - thanks to the Welsh Government giving them bus passes. So, the WG give out bus passes that then means that they have to subsidise the railways who have lost potential off peak passengers! (Yes, I do know that the people with Welsh Bus Passes can use the local rail network with a third off the fares).
Well, I guess whoever is responsible - TfW / WAG / Franchise bidders - will have looked at the existing spine of railway lines and concluded they are a solid foundation to build a new network.
Leaving it as Heavy Rail to suit existing users means that users of any future expansions will have to face a tram network, 100% based on on-street running. That is - if there's any money left after paying for the HR electrification - which I'm far from convinced will be cheaper than the £600m LR conversion.
On the contrary. I've already stated I favour turning the City Line and the line through Llandaff into a City Circle. Route all the existing services as tram/trains in a circle clockwise and counter-clockwise using the existing rail infrastructure. Rhymney/Coryton services can continue through Cardiff Central on their current routes / or be diverted to any other terminus points.
It'll cost less as you have the advantage that any additions to the system can utilise the existing rail infrastructure. So say a tram extension to Cardiff Gate in the North East can run on the existing Rhymney line to Lisvane or Llanishen, and then go on street for the last part of its connection. Rather than having a tram line dug along the street all the way from central Cardiff out to the far North eastern suburbs. Same for other Cardiff extensions of Valleys extensions.