swanhill41
Member
Cost a fortune to reconnect
Cost a fortune to reconnect
Though Network Rail were quite insistent on severing the link during the initial track works, an attitude which disappointed the Heritage group wanting to use the line with the distant possibility of linking to Poulton at some point.But that isn't the same is impossible - just deeply unlikely. Nothing that has been done precludes reinstatement.
Though Network Rail were quite insistent on severing the link during the initial track works, an attitude which disappointed the Heritage group wanting to use the line with the distant possibility of linking to Poulton at some point.
Honestly, I mean no disrespect, but I'm reminded of the Colne-Skipton plans, ones I used to enthusiastically support myself. The thread on here about that link taught me a lot about the actual costs of reopening a line, and how the passage of time turns plans once written in pen to dreams drawn in crayon. It's quite similar here: linking Fleetwood back to Poulton may once have been possible and affordable; I doubt that either of those factors are true today.
The junction from Poulton was clearly, and deliberately, cut by Network Rail. They've no economic reason to undo that. Maybe, just maybe, Fleetwood-Poulton is West Lancashire's Skipton-Colne.
Reason was that the lines best profile was to move the line over to give best speed and wear and tear ..The junction was relaid about 10 years ago because it was cheaper to do that than go all through the paperwork and god knows what ....And it will not be reinstated whatever happens as the costs viz the revenue will never,never pan out under any economic formula....And a railway will never transform Fleetwood....It grew up as a port,as well as a fishing port both of which have long gone....Whatever happens to Fleetwood,retail and tourism will be in part be upmarket and car borne....There is also an element of coach borne customers,but they are coach borne as per their profile,low income OAPS....And that is an economic fact ,not a case of running them down .....All types of people make up the mix and it is that you need to consider rather than there should be a railway, without sensible consideration of the facts of the argument.Though Network Rail were quite insistent on severing the link during the initial track works, an attitude which disappointed the Heritage group wanting to use the line with the distant possibility of linking to Poulton at some point.
Honestly, I mean no disrespect, but I'm reminded of the Colne-Skipton plans, ones I used to enthusiastically support myself. The thread on here about that link taught me a lot about the actual costs of reopening a line, and how the passage of time turns plans once written in pen to dreams drawn in crayon. It's quite similar here: linking Fleetwood back to Poulton may once have been possible and affordable; I doubt that either of those factors are true today.
The junction from Poulton was clearly, and deliberately, cut by Network Rail. They've no economic reason to undo that. Maybe, just maybe, Fleetwood-Poulton is West Lancashire's Skipton-Colne.
oTram makes most sense to me. Will get far more usage simply because of the higher number of stops and the fact that it could connect directly into the existing system and run to the end of Fleetwood.
Tram makes most sense to me. Will get far more usage simply because of the higher number of stops and the fact that it could connect directly into the existing system and run to the end of Fleetwood.
Having a street track of that length would be hugely more expensive than just connecting up to the line all the way.Cleveleys tram stop straight down the B5412 to Thornton and then using the line from there to Poulton would make sense. That would still leave the rest of the line for potential heritage use.
Having a street track of that length would be hugely more expensive than just connecting up to the line all the way.
It would also serve a much larger number of people. There is insufficient demand for two lines into Fleetwood and I suspect the Blackpool North tram link will kill off any prospects of reopening the line.
If you mean there would be insufficient demand for a tram line from Fleetwood to Poulton, I would agree, as it would be rather slow due to frequent stops. However there would be plenty of demand for a relatively fast rail link to the national rail network, as has been found in previous studies. Looking at the 1968 timetable, Poulton to Fleetwood (Wyre Dock) by train took a mere 12 minutes whereas today a similar bus journey would take about 50 minutes, which is tragic for a distance of about 7 miles.
I think the Blackpool North tram extension is a separate issue from the rail line, as they serve different purposes, i.e. local vs longer distance journeys. The fact that the future tram service plans seem to focus on taking visitors from North station to the hotels and attractions in Blackpool, but not on to Fleetwood, does, IMHO, back up that impression.
This interesting local newspaper article gives more information on the thinking behind the current campaign for reopening the rail line.
https://www.blackpoolgazette.co.uk/...od-s-railway-line-to-be-reconnected-1-8929908
Note the link to the rail petition is : https://petition.parliament.uk/petitions/207834
Won't happen.
It had to be removed (the junction) to achieve the improvements in journey time required to help justify the improvements on the PBN line as a whole;