Doesn't encourage suicides either.Better the other way around with crossovers as it allows turnbacks, expensive though.
Doesn't encourage suicides either.Better the other way around with crossovers as it allows turnbacks, expensive though.
Better the other way around with crossovers as it allows turnbacks, expensive though.
Not ideal and a bodge I agree but I bet you'd have had a real job convincing the North Oxford Nimbies that you needed railway loops there! I think we need to be mindful of too much gold-plating sometimes. Presumably if loops at Newton Longville don't get built, they could be put in later fairly easily.The arrangement at the Oxford end is just a cheap bodge for not putting a loop in and I will bet cold hard cash on the Newton Longville loops being descoped and binned. Claydon will be the only loop along there.
Up Chiltern trains can also be looped at High Wycombe using the crossovers there, which sometimes happens to sort trains out following late running.Just to add, the Chiltern main line, being bi-directionally signalled between Princes Risborough and Aynho Junction, effectively has an overtaking facility in both directions between Bicester South Junction and Bicester North station. In the down direction a train can be looped in the station. In the Up direction the facility exists to loop a train between Bicester North and Bicester South Junction. There is at least one down train booked to be overtaken at Bicester North. Similarly I have seen up trains overtaken on several occasions - usually if a late running Mainline service is stuck behind the stopper. I doubt if anything is booked to be overtaken in the up direction though.
You astute individual - let's remind everyone of that in a months timeI will bet cold hard cash on the Newton Longville loops being descoped and binned. Claydon will be the only loop along there.
I will bet cold hard cash on the Newton Longville loops being descoped and binned. Claydon will be the only loop along there.
Up Chiltern trains can also be looped at High Wycombe using the crossovers there, which sometimes happens to sort trains out following late running.
If loops were installed back (or through running lines) - at all the mentioned stations, like Beaconsfield, HW, Ruislips, Denham - what might the potential be for both increased frequency and for journey time improvements?
How about electrification on the Chiltern route?
I'd guess the main benefit would be to resilience as it would be easier to get fast trains to overtake slower ones without having to use the existing arrangements which block the line in the other direction (and sometimes lead to delays in one direction being transmitted to the other). But in reality they seem to be quite creative in sorting things out with the current infrastructure and the benefits would be marginal for the cost incurred.Journey time improvements - net worse, as the stoppers would take an age to get anywhere, and the fasts would gain very little (they have very little pathing time today).
Frequency - zero, because of the two track section Neasden - Marylebone.
Not such a good idea?
The bit that is already done was originally a stand alone Chiltern Railways project under the heading "Evergreen 3", and should be seen as an enabler or precursor to EWR. This earlier project (as modified to allow for EWR) provided for redoubling the existing single line from Oxford to Bicester Village (formerly Town), and building a new double track "west to south" connection to the existing Chiltern route near where the single track freight line crossed under the mainlines towards Bicester North. A new north Oxford Parkway station was also added, with the stations at Islip and Bicester being significantly upgraded not least for double tracking.Please can Somone provide in a nutshell what's proposed to what I thought before joining looked like a brand new or reopened double track line , nr Oxford to Marylebone.
The arrangement at the Oxford end is just a cheap bodge for not putting a loop in and I will bet cold hard cash on the Newton Longville loops being descoped and binned. Claydon will be the only loop along there.
Looking at the usage, the two Sudbury stations should either be up-served or closed. Having 100k users total within London for two stations is terrible, even with the service levels they have. That would help flighting in the two track section. The Amersham route is tricky though.Journey time improvements - net worse, as the stoppers would take an age to get anywhere, and the fasts would gain very little (they have very little pathing time today).
Frequency - zero, because of the two track section Neasden - Marylebone.
Not such a good idea?
Looking at the usage, the two Sudbury stations should either be up-served or closed. Having 100k users total within London for two stations is terrible, even with the service levels they have
Chiltern did substantially improve the service at Sudbury Hill Harrow about a decade ago, but it remains lightly used.Interestingly though the Piccadilly Stations face north / south and have long journey times to / from Central London. If Chiltern improved their service offering I am sure they would see more footfall.
Both those stations are only served in peak periods will they ever get a more regular service?Chiltern did substantially improve the service at Sudbury Hill Harrow about a decade ago, but it remains lightly used.
Okay will discuss that in a different threadSince when has the service at the Sudbury stations been anything to do with East-West? Perhaps we can get back on topic now.
Since when has the service at the Sudbury stations been anything to do with East-West? Perhaps we can get back on topic now.
You mean you haven't heard about the Marylebone - Liverpool Street proposal running all stations to High Wycombe, then fast to Aylesbury, EWR to Bletchley across to Bedford, up to Corby reverse at Oakham onto Peterborough, thence Cambridge and Liverpool Street via Waltham Cross if going to Liverpool St and Theobalds Grove if from Liverpool St.
Allegedly going to be run using either Valenta engined 5 car HSTs or top'n'tail Class 73s with the ex-Thameslink 319s in the middle.
You mean you haven't heard about the Marylebone - Liverpool Street proposal running all stations to High Wycombe, then fast to Aylesbury, EWR to Bletchley across to Bedford, up to Corby reverse at Oakham onto Peterborough, thence Cambridge and Liverpool Street via Waltham Cross if going to Liverpool St and Theobalds Grove if from Liverpool St.
Oh, come on, poor effort - where's the 442s?![]()
Can anyone point me to a source showing the estimated cost for the Western section or the Central section?