ChiefPlanner
Established Member
Understood that the damage is incredibly extensive - hence the 2 nights of repair work. Possibly affecting the neutral section at North Wembley ?
A previous huge dewirement in 1981 in the Hemel Area when all lines were ripped down by a badly secured container , is about the nearest / worst incident I can recall. That took 48 hours to sort out.
A previous huge dewirement in 1981 in the Hemel Area when all lines were ripped down by a badly secured container , is about the nearest / worst incident I can recall. That took 48 hours to sort out.