Are there any plans to improve this line? This line is frequently overcrowded, and with the Bath christmas market kicking off, I can see a lot of people getting left stranded at stations. A few improvements that could be made include:
- Longer trains, which is probably more viable than:
- Increasing frequency (e.g 2 per hour)
This perhaps could just be a second service between Southampton and Bristol
- Extending the service to Swansea (a lot of people from Swansea, Neath, Port Talbot & Bridgend change onto this train at Cardiff, and with only a 7 minute connection time, the GWR service to Portsmouth can easily be missed)
- All trains to stop at Severn Tunnel Junction (a well used station whenever I go through it)
- Longer trains, which is probably more viable than:
- Increasing frequency (e.g 2 per hour)
This perhaps could just be a second service between Southampton and Bristol
- Extending the service to Swansea (a lot of people from Swansea, Neath, Port Talbot & Bridgend change onto this train at Cardiff, and with only a 7 minute connection time, the GWR service to Portsmouth can easily be missed)
- All trains to stop at Severn Tunnel Junction (a well used station whenever I go through it)
