Market Harborough Station Upgrade

Status
Not open for further replies.

Flying Phil

Established Member
Joined
18 Apr 2016
Messages
2,085
This project has been referred to in the MML Electrification thread, but, as that is now halted, this station project might have got lost also - so a new "stand alone" thread would seem sensible.
I live in Harborough so will update on a fairly regular basis if that is what is wanted?
Work has now started and there is a bit happening on the site North of the existing station car park. This is where the new railway line will be going to ease the reverse bend through the present station.
45575980787d80b6f.jpg

More clearance work is happening to the East of the station where the old goods shed will shortly be demolished and the new car park situated.
45575980787e4ce66.jpg


45575980787f12424.jpg
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Flying Phil

Established Member
Joined
18 Apr 2016
Messages
2,085
Harborough station remodelling continues with the start of the demolition of the old MR(?) goods shed.
455759945a8e81594.jpg
 

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
10,525
Location
Preston Lancs
Great idea for a thread especially if you update regularly with progress. If/when MML sparks eventually happens it will be one less thing to do on the civils
 

HowardGWR

Established Member
Joined
30 Jan 2013
Messages
4,981
Harborough station remodelling continues with the start of the demolition of the old MR(?) goods shed.
Hope they gave Butterley (and others) the chance to see if there were interesting materials to be salvaged.

Edit: Great idea for the thread, thanks.
 
Last edited:

Flying Phil

Established Member
Joined
18 Apr 2016
Messages
2,085
The old goods shed is now about half demolished and it is expected to be completely gone by tomorrow afternoon!
4557599582e05852d.jpg


This is the view from the Great Bowden bridge (to the North of the Station, view looking South)

4557599582e16e593.jpg
 

Flying Phil

Established Member
Joined
18 Apr 2016
Messages
2,085
Well the view from Harborough station has certainly changed as the Goods Shed is now removed down to ground level!
4557599b04b7ac14c.jpg

There is also more work going on on the rest of the site to prepare it as the new car park.

4557599b04b89badd.jpg
 

Flying Phil

Established Member
Joined
18 Apr 2016
Messages
2,085
From the roving reporter! Well the base of the Goods Shed is now this big pile of rubble/hardcore.
455759a024daf14df.jpg

To the North, work continues laying a base for the new car park

455759a024dbe8bc3.jpg
 

Flying Phil

Established Member
Joined
18 Apr 2016
Messages
2,085
The drainage pipes have been buried and the site is being levelled ready for the tarmac to be laid, so steady progress.
455759c79f4f06ab0.jpg
 

Blindtraveler

Established Member
Joined
28 Feb 2011
Messages
10,544
Will the remoddling include/require new or relocated wating or booking office facilities?
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,299
Will the remoddling include/require new or relocated wating or booking office facilities?

The building will still be near enough to one of the platforms to remain in use, in fact the straightening is basically all north of the existing building and effectively means the track is slightly nearer the back of the building, rather than curving away from it (if that makes sense).

There were drawings etc linked in the earlier MML electrification thread, the relevant posts and discussion starts here: http://www.railforums.co.uk/showpost.php?p=3031952&postcount=843
 
Last edited:

InTheEastMids

Established Member
Joined
31 Jan 2016
Messages
1,397
Good, no Network Rail poverty spec newbuilds then!

The new alignment meets the current one at the South of the station, so everything further up gets knocked down and moved, so don't worry, your beloved Poverty Spec shelters may find a home up by the footbridge.

The existing station is characterised by lack of shelter, outdoor benches and tiny waiting rooms. I expect NR to make little or no improvement on any of these areas - customer experience just isn't proper engineering is it? ;)
 

XDM

Member
Joined
9 Apr 2016
Messages
483
The new alignment meets the current one at the South of the station, so everything further up gets knocked down and moved, so don't worry, your beloved Poverty Spec shelters may find a home up by the footbridge.

The existing station is characterised by lack of shelter, outdoor benches and tiny waiting rooms. I expect NR to make little or no improvement on any of these areas - customer experience just isn't proper engineering is it? ;)

I remember the southbound waiting room being rather comfortable; warm, leather armchairs(am I imagining them!) & good view of the tracks.
 

Flying Phil

Established Member
Joined
18 Apr 2016
Messages
2,085
DSCF7300.JPG

Well it seems that the new website didn't like my previous photographs as they were hosted on another website (- but perhaps that is only a temp situation?). Still, this is the current view of the new Harborough station future car park. No workers were to be seen but it looks nearly ready for a proper surface to be laid.
 

Flying Phil

Established Member
Joined
18 Apr 2016
Messages
2,085
Preparation work continues, with the focus moving to the North end of the new car park. They are also removing and excavating the old track bed from the siding that used to run between the shed and main line.DSCF7310.JPG DSCF7311.JPG
 

Flying Phil

Established Member
Joined
18 Apr 2016
Messages
2,085
A quantity of sand has been delivered on site and is being spread as a base for the new car park. The edging blocks are being laid adjacent to the running line.DSCF7328.JPG
 

Flying Phil

Established Member
Joined
18 Apr 2016
Messages
2,085
Much more prep work has been done with 4 machines moving around.DSCF7334.JPG
and a van is on site on the west side of the track (North of platform 1) DSCF7335.JPG
 

Mugby

Established Member
Joined
25 Nov 2012
Messages
2,134
Location
Derby
So is the new car park to be on the east side of the line (or Up side?)
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,692
Location
Nottingham
Yes, the first 4 photos in #20 are the new car park site while the fifth one is the existing car park approximately where the re-aligned tracks will be.
 

Mugby

Established Member
Joined
25 Nov 2012
Messages
2,134
Location
Derby
Won't that present inconvenience for London bound passengers, having parked their cars, they then need to get across to the ticket office on the Down side, the back again to the Up side?
 

fowler9

Established Member
Joined
29 Oct 2013
Messages
8,380
Location
Liverpool
Back when I was a child I have many happy memories of staying with family friends in Rupert Road in Market Harborough. We spent hours there watching flying bananas and 45's passing on passenger services.
 

Flying Phil

Established Member
Joined
18 Apr 2016
Messages
2,085
Won't that present inconvenience for London bound passengers, having parked their cars, they then need to get across to the ticket office on the Down side, the back again to the Up side?
I too wondered about that, but I suspect, the majority of car park users will already have pre-paid or season tickets and so will be able to go straight onto the adjacent London bound platform - the new layout will be much better for them. The new car park will be larger as well - the present one is often "Full".
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,692
Location
Nottingham
They'll probably put ticket machines at the access from the car park to the platform as well, so those without tickets can buy/collect them. They do this at Nottingham for example.
 

Flying Phil

Established Member
Joined
18 Apr 2016
Messages
2,085
The tarmac is now being laid at the North end of the new car park and at the South end they continue to excavate to create the new level.DSCF7337.JPG DSCF7338.JPG
 

Flying Phil

Established Member
Joined
18 Apr 2016
Messages
2,085
Just about the whole of the North end of the car park has been tarmaced and the South end largely leveled.DSCF7356.JPG
 

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
Press release about the bridge south of the station:

https://www.networkrail.co.uk/feeds/road-closure-as-network-rail-upgrades-railway-in-leicestershire/

Network Rail will install new drainage to Rockingham Road bridge in Market Harborough as part of the Midland Main Line improvement programme.

The work will see new drainage installed. During this time, Rockingham Road will be closed to all vehicles between 21:00 and 06:00 between Friday, 1 and Monday, 4 December and a clearly signposted diversion route will be in place. Pedestrian access across the bridge will be maintained throughout the work.
 

Kettledrum

Member
Joined
13 Nov 2010
Messages
806
Yes, the first 4 photos in #20 are the new car park site while the fifth one is the existing car park approximately where the re-aligned tracks will be.
Whilst a few hundred yards of re-aligned track are being laid, wouldn't it make sense to install electrification bases at the same time on this new stretch. It would certainly make it much easier to extend the wires in the future.
 