So it seems that recently, Northern have become fond of joining the Lincoln - Sheffield to the Adwick - Sheffield. What's the point of this, as it requires a clumsy reverse and wait in Sheffield and isn't even the fastest way from Lincoln to Adwick?
So it seems that recently, Northern have become fond of joining the Lincoln - Sheffield to the Adwick - Sheffield. What's the point of this, as it requires a clumsy reverse and wait in Sheffield and isn't even the fastest way from Lincoln to Adwick?
Portion working? It makes more efficient use of staff and paths than running short trains around on their own.
I guess I thought this was quite new in Sheffield, but I may well be wrong.What exactly do you mean by "recently"?
Meadowhall.
I guess I thought this was quite new in Sheffield, but I may well be wrong.
dk1 - I do see the point about Meadowhell, although with at least 6tph SHF - MHS it doesn't save a lot of time.
Which way did that go? Does it really beat XC services such as the Plymouth-Glasgow one (today a mere 35 minutes late reaching Edinburgh)?I think Central Trains took the record for craziest conjoined service with trains from Barmouth running to Yarmouth at one stage. Whereas the Northern example above looks sensible.
"This resulted in some particularly lengthy services such as those from Aberystwyth in Mid Wales to Grimsby on the opposite coast of the UK.[12][13] This also gave rise to the nickname "The Barmouth to Yarmouth Railway" due to the fact Central Trains operated services in both Mid Wales and East Anglia (certain services were extended from Norwich to Great Yarmouth in the summer)."
From Wikipedia (so perhaps a pinch of salt), but I don't think they ever ran Barmouth - Yarmouth as such, although it looks like Barmouth - Grimsby did run for a while.
Do you know why this sort of route is criticised (now, long after it was split up for reasons not specific to the route)? It doesn't sound like a problem just from giving the end-points.From Wikipedia (so perhaps a pinch of salt), but I don't think they ever ran Barmouth - Yarmouth as such, although it looks like Barmouth - Grimsby did run for a while.
I was just basing it on how a map Virgin did show things, with "VT1" covering Plymouth-Glasgow, but via the WCML, and "VT2" given both ECML and WCML routes, but only from Poole or Portsmouth. I don't suppose there was anything straightforward in the way their routes were dismantled, though.The XC Plymouth - Glasgow isn't really conjoined, as I don't think it was ever 2 seperate services, it's just a long intercity route that crosses a lot of other lines, leading to a lot of potential for delay.
Which way did that go? Does it really beat XC services such as the Plymouth-Glasgow one (today a mere 35 minutes late reaching Edinburgh)?
It can't be something TPTB are too concerned about providing (I'll assume that you meant "from" rather than "to" in the above, as I'm not sure how else you could have meant it), or else they'd provide a train which was faster and more reliable than that one.Why do you want to stop people from Glasgow having a direct route to Newcastle or York?
It can't be something TPTB are too concerned about providing (I'll assume that you meant "from" rather than "to" in the above, as I'm not sure how else you could have meant it), or else they'd provide a train which was faster and more reliable than that one.
It does seem a little OTT, for example from Sheffield, it's quicker to either change in Manchester or even stagger across Warrington than to go via Edinburgh. I can't imagine the traffic from Newcastle and York is so great as to necessitate a through service, especially one that's slower than changing.I still don't see the point of XC running beyond Edinburgh. It's still quicker to change at Edinburgh for the Scotrail express rather than take the magical mystery tour of Lanarkshire.