Hi
A retrospective question ... last Friday I was travelling from Milton Keynes to Liverpool South Parkway for which I had an Off Peak 1st Class Single. On arrival at Milton Keynes I purchased a ticket from Liverpool South Parkway to Hoylake to save time whilst interchanging to Merseyrail at South Parkway.
My Departure (1441) was delayed en-route and arrived Crewe 10 minutes after the connection at 1557 to South Parkway had departed. As this was obviously going to happen and as the train manager was sat at the back of 1st class, I asked if I could travel via Chester to connect with Merseyrail. I pointed out that If I did that I would get home quicker (albeit slightly later than scheduled) and there would be no delay repay.
He said that he was happy to convey me as far as Chester but I would have to buy an additional ticket to travel from Chester to Birkenhead.
Faced with that option of arriving either 15 minutes late with an additional cost or 45 minutes late with a refund of £41 I chose the later.
I guess my question is twofold;
As Milton Keynes to Hoylake is valid either route, if you have 2 tickets that split at a point on one route, does that route have to be followed?
If the above is yes, in the case of delay, does that route as a quicker option then become viable?
Comments as always really appreciated.
Thanks
A retrospective question ... last Friday I was travelling from Milton Keynes to Liverpool South Parkway for which I had an Off Peak 1st Class Single. On arrival at Milton Keynes I purchased a ticket from Liverpool South Parkway to Hoylake to save time whilst interchanging to Merseyrail at South Parkway.
My Departure (1441) was delayed en-route and arrived Crewe 10 minutes after the connection at 1557 to South Parkway had departed. As this was obviously going to happen and as the train manager was sat at the back of 1st class, I asked if I could travel via Chester to connect with Merseyrail. I pointed out that If I did that I would get home quicker (albeit slightly later than scheduled) and there would be no delay repay.
He said that he was happy to convey me as far as Chester but I would have to buy an additional ticket to travel from Chester to Birkenhead.
Faced with that option of arriving either 15 minutes late with an additional cost or 45 minutes late with a refund of £41 I chose the later.
I guess my question is twofold;
As Milton Keynes to Hoylake is valid either route, if you have 2 tickets that split at a point on one route, does that route have to be followed?
If the above is yes, in the case of delay, does that route as a quicker option then become viable?
Comments as always really appreciated.
Thanks