Some of London's major stations will completely close this christmas for Major engineering works
A quote box can't be used as I haven't got one in my editor to use
London Paddington
Closed completely from December 24th to 28th some GWR services will divert to London Marylebone from the 28th to 31st Paddington will reopen with only 50% of the lines available
Southeastern
No trains will serve the following stations between Dec 23rd to Jan 1st
London Bridge, Charing Cross, Waterloo East, Cannon Street
Thameslink
No services through central London from Dec 23rd to Jan 1st
Liverpool Street
No Greater Anglia trains on Dec 23rd, 24th, 27th and Jan 1st - London to Ipswich will take 2hr 17min instead of 1 hr 11min
Gatwick Express
No service Dec 26th 50% service Dec 23rd & 27th to 29th
Heathrow Express/Connect
No service from the evening of Dec 23rd to 29th
South Western Railway
No trains between Southampton Central and Eastleigh from Dec 24th to January 1st and the route to Fareham will close on Dec 30th and 31st services will divert around the area with XC services having around 40 minutes added
WCML
Preston to Lancaster shut on Christmas Eve and December 27th buses will replace trains
Source: http://www.dailymail.co.uk/news/article-5004861/Worst-Christmas-delays-hit-20m-journeys.html
A quote box can't be used as I haven't got one in my editor to use
Last edited:
