Yes, that's true, but I do think the major flows (Exeter, Yeovil, etc) should get more through services for air pax.
Looks like your response will balance mine.![]()
![]()
Southwestern railway passengers are believed to have got off a delayed train this morning and walked along the tracks forcing the power to be switched off
@SW_Help #DisruptionSWR **NEW** Due to customers exiting the train before it is at a platform at Wimbledon all lines are blocked.
https://twitter.com/SW_Help/status/914756458016854017
Arrest and charge the lot of them, make sure that their employers or if they are students educational institution is made aware of the circumstances of their arrest and charges.
Hit them hard in the pocket too and they soon learn to leave egresses alone and when it gets back to the rest of them what happens for misuse of the egresses, it may well stop this sort of behaviour.
Keep dreaming, got as about chance as having a hot date with Scarlett Johansson.![]()
That's kind of the point I'm making - I know that the issues are related to Network Rail and not South Western Railway. But I am beginning to wonder now if it's not too much of a coincidence that these problems have occurred and been more problematic since the franchise handover.To be fair a lot of the issues are related to NR of similar incidents outside the TOCs control, I dont think its fair to wholly blame First, recovery seems slower though under the new regime, even though its still the same train service managers etc. Perhaps its just rose tinted glasses shining through again.
The thing I'm finding is that even though I know that nothing has really changed yet between Stagecoach and First running things, and that it's the same staff, the same trains... I'm beginning to wonder how there has been a monumental downgrade in service since First took over. I was willing to give them the benefit of the doubt, but a month in and it surely can't *all* be not First's fault.
As expected the Clapham Junction call has been swapped over from the Exeters to the Salisbury locals, interestingly it looks like the Woking call on Exeter* services is pick-up only
Looks like I will need to remember it will be XX:55 from Waterloo rather than XX:50, and seems a bit odd there is a couple long distance services calling at Whitchurch only. I'm happy with the shift of the 22:20 to become the 22:55 & the 23:40 becoming the 23:55.
----
Interesting with the Waterloo service shifting from XX:59 to XX:05, hence allowing the use of Network Railcards from the 10:05 service. New named train as well "The Sarum Express", the 08:47 Salisbury to Waterloo, with an additional 08:53 service which will make my life easier as normally that service is busy as it comes up from Exeter, I can remember a few times it was F&S after Andover on the days when SWT had the £14 day returns promotions.
An odd 07:39 Southampton - Yeovil Pen Mill service as well.
You probably need to ask NR that.
Some of the mistakes made by their sub-contractors are quite eye-opening.
I have some sympathy with the poor commuters. If your train were repeatedly delayed, making you late for work on a regular basis and risking disciplinary actions, you would probably be quite frustrated, and upon hearing another "track circuit failure" which could potentially strand you for another 30 minutes on the train, you would probably be quite tempted to get on your way via whatever means possible.
It's a good example of the unavoidable compromises. People from west of Salisbury also want a quicker journey to Waterloo.
Having now looked at table 158, I see that in the future you'll be doing exactly what I have to do now to get to Gatwick: get off at Basingstoke, wait on the same platform for six minutes for a fast train to Clapham Junction.
But the journey planner sometimes comes up with an alternative, which is to change at Woking and then Guildford for the North Downs line. I've done that once, but I don't like it because it's an additional stage where something might go wrong. Might be worth doing coming back, though, because if the GWR train was cancelled from Gatwick there are plenty of trains to Clapham
Junction instead.
During a disrupted journey to Gatwick, we tried to do that (via Guildford), but the ticket stated via Clapham Junction, so I had to wait for that one. It got me wondering whether a bus service to Gatwick (as for Heathrow) might not be a better service. Both you and I could then have just one change.
The real need IMO, is a decent interchange at Farnborough to the GWR service to Gatwick.
During a disrupted journey to Gatwick, we tried to do that (via Guildford), but the ticket stated via Clapham Junction, so I had to wait for that one. It got me wondering whether a bus service to Gatwick (as for Heathrow) might not be a better service. Both you and I could then have just one change.
The real need IMO, is a decent interchange at Farnborough to the GWR service to Gatwick.
Isn't Southampton more of a "regional" airport than a long haul one?
The problem with Farnborough is that there's not an easy way to fix the problem with interchanging between the three lines that run closer to each other.
If you build an interchange station how do you serve it? Would it be an additional stop or would or be an alternative location. Neither is ideal.
The problem with Farnborough is that there's not an easy way to fix the problem with interchanging between the three lines that run closer to each other.
If you build an interchange station how do you serve it? Would it be an additional stop or would or be an alternative location. Neither is ideal.
Another option would be to build a new West facing grade separated junction to allow Ascot - Basingstoke services. Then with a new station at Farnborough Gate on the Reading - Gatwick line it would make the interchange much easier (still a few hundred metres walk though from Frimley station to the new station). However it could bring lots of other benefits (including a way to divert around Woking for engineering works and better connections to London from Camberley and Frimley). However that would likely cost £100 million (probably more) so hardly cheap.
Even just a new access and gateline to allow direct access from platform 1 to the road bridge would make a difference (it would also help with the hundreds of people trying to get out of the station from each train of a morning, and to a lesser extent in the evening).
The mostly likely thing to happen would be the provision of the Southern Approach to Heathrow providing 2tph from Farnborough (ideally also Hook, Winchfield, Fleet and Brookwood as well) so add to limit the need for people to travel to Gatwick as Heathrow would have a good connection (especially as from Woking it would be 4tph). Of course people would still want to go to Gatwick, but at least there would be an easy route to Heathrow making that more attractive.
Personally I would, if possible, opt for Southampton Airport add it is very convenient for the station and you don't have the long walks to your plane that you often have at Gatwick. However that's not always an option depending on where your going.
You'd be doing well to get anything long haul off a runway that isn't even 6000 feet long. SOU is pretty much puddle jumpers and turbo props, might get the odd Embraer jet...
You probably need to ask NR that.
Some of the mistakes made by their sub-contractors are quite eye-opening.
I have some sympathy with the poor commuters. If your train were repeatedly delayed, making you late for work on a regular basis and risking disciplinary actions, you would probably be quite frustrated, and upon hearing another "track circuit failure" which could potentially strand you for another 30 minutes on the train, you would probably be quite tempted to get on your way via whatever means possible.
This was always coming giving the absolutely abysmal performances of late on the route.
It is stupid to detrain themselves, risking injury to themselves and others around them, but nowhere near as stupid as some of the monumental mistakes by NR's sub-contractors of late.
Isn't Southampton more of a "regional" airport than a long haul one?
I think that the nearest long haul airport for the WoE line will vary from where you are, in that it could be Bristol for one end or Heathrow for the Salisbury end.
It was pointed out recently that if you're prepared to do some travelling & an overnight stay, you can save yourself £100s on the cost of a holiday, so instead of travelling from either Heathrow or Gatwick, go from one of the provincial airports such as Birmingham, Newcastle or even Glasgow and the savings outweigh the cost of travel to them & any overnight stays.
A station in Farnborough at the intersection of the North Downs and South West Main lines would be in a residential area miles from anywhere. There wouldn't be any room to build it anyway unless a considerable number of private dwellings were flattened.
It seems that NR bought a job job of dodgy gear from Delboy and Rodney for use at Waterloo. Everyday it's the same.
I can understand why commuters are getting peed off.
How about a bus shuttle between the main and north stations BB? Yeovil has one between the two stations and this is very useful as it also goes via the town centre. Do you have an existing local Farnborough bus service that could be so adapted?Gulp... think I need to declare an interest. Touch and go whether I would have a station next door or be looking for a new home!!
and parking fees. This is a big market (you just have to notice pax detraining at CLJ with cases) and SWR need to encourage it.