swt_passenger
Veteran Member
- Joined
- 7 Apr 2010
- Messages
- 34,293
Did the franchise announcement headlines about 'speeding up mainline services' not include the Portsmouth branch then? 
Proposed timetables now online available here:
https://www.southwesternrailway.com/contact-and-help/timetable-consultation
Appears Liphook and Godalming are early winners.
Looks like Pinhoe finally gets the hourly service it needs!![]()
As you'll know from the earlier discussion it was a requirement of the specification, so not such a surprise?


What a load of rubbish that Portsmouth Direct service is.
SWR should be eliminating stops NOT increasing the number of them because all it does is make the A3 even more appealing with a journey time from Guildford to Portsmouth being around about 50 mins, compared to the 1hr 10 or more by train, a train where you have to put up with kids and people jabbering on their mobiles.
Compare that to the ability to come & go when you like, be down to Portsmouth quicker than the train and have the music you want or to have peace & quiet no jibbering buffoon on the phone & no kids.
It might cost a tad more, but at the end of the day I get more freedom by car than by train and so the choice that I & many others will make is CAR!
I've noticed that unless GWR retime the Gatwick service you have conflict at Guildford and/or Shalford Junction.
The battery on my device is running low, whats the current end to end time compared to the proposed end to end? Didnt they say theyd trim 8 minutes off the direct?
Ive just looked,
Current time 1h37 end to end
New time 1h32 end to end even with the additional Godalming call.
That's because they've been cunning and removed the padding that currently exists between Guildford & Haslemere and Petersfield & Havant.
You have to remember a true fast service will do the trip from Guildford to Haslemere in approx 14' which isn't bad considering the gradients are against you all the way, you can do the up direction in 13'.
The current timetable allows you between 14-20' to do the piffling little 13 mile journey, that's why I don't do anymore than 45 mph between Guildford & Haslemere with a 1P, you just catch up the preceding service.
So you can immediately see where 6' has gone and you can take out another 3-4' of padding around Havant too.
If you leave Petersfield RT you can shut off at Bolinge Hill and coast all the way to Havant and still be there RT and there's a more than reasonable chance of doing the near impossible & that's going straight into Havant without stopping on HT19.
On the up I can go all the way from Havant to Petersfield with only one touch of the brake and that's to maintain the 40 through Buriton Tunnel and the necessary braking for Petersfield, if I drove it like a 1P service should be, I'd be sitting there at Petersfield a good 4' early and I know that if I chase it from Petersfield to Haslemere I could be sitting at Haslemere long enough to get a coffee and that's 5', if I'm leisurely I shut off at Liphook and just glide in to Haslemere a minute early!
Leaving Haslemere I can shut off at 45 mph and glide all the way to Guildford, only braking for the 60 section through Ashtead/Godalming to Farncombe and even then I can let it keep going with clear aspects and arrive Guildford RT.
If you do a proper fast with existing stops you can do the journey in 1h 25/27, that's still 5' faster.
I'm quite glad to see that other posters have tended to agree with me that the proposed timetable is utter tripe. And if that's what they intend to do then if I want to go to the coast I'll be in the car.
That's because they've been cunning and removed the padding that currently exists between Guildford & Haslemere and Petersfield & Havant.
You have to remember a true fast service will do the trip from Guildford to Haslemere in approx 14' which isn't bad considering the gradients are against you all the way, you can do the up direction in 13'.
The current timetable allows you between 14-20' to do the piffling little 13 mile journey, that's why I don't do anymore than 45 mph between Guildford & Haslemere with a 1P, you just catch up the preceding service.
So you can immediately see where 6' has gone and you can take out another 3-4' of padding around Havant too.
If you leave Petersfield RT you can shut off at Bolinge Hill and coast all the way to Havant and still be there RT and there's a more than reasonable chance of doing the near impossible & that's going straight into Havant without stopping on HT19.
On the up I can go all the way from Havant to Petersfield with only one touch of the brake and that's to maintain the 40 through Buriton Tunnel and the necessary braking for Petersfield, if I drove it like a 1P service should be, I'd be sitting there at Petersfield a good 4' early and I know that if I chase it from Petersfield to Haslemere I could be sitting at Haslemere long enough to get a coffee and that's 5', if I'm leisurely I shut off at Liphook and just glide in to Haslemere a minute early!
Leaving Haslemere I can shut off at 45 mph and glide all the way to Guildford, only braking for the 60 section through Ashtead/Godalming to Farncombe and even then I can let it keep going with clear aspects and arrive Guildford RT.
If you do a proper fast with existing stops you can do the journey in 1h 25/27, that's still 5' faster.
I'm quite glad to see that other posters have tended to agree with me that the proposed timetable is utter tripe. And if that's what they intend to do then if I want to go to the coast I'll be in the car.
Thanks for such an in-depth reply, I genuinely couldnt argue with a thing youve said. Off topic slightly but do you think professional driving policies and defensive driving techniques have made the situation much worse?
There was the big SWT timetable recast of ten or so years ago (?) where the underlying logic was driven by passengers preferring a reliable, on-time railway over faster services. This did indeed slow everything down, but did make it all more reliable and on-time too.
There was the big SWT timetable recast of ten or so years ago (?) where the underlying logic was driven by passengers preferring a reliable, on-time railway over faster services. This did indeed slow everything down, but did make it all more reliable and on-time too.
Maybe I'm unusual in that I commute from Portsmouth to Guildford and its a clear choice between car and train. This does nothing for anyone unless they are going in/out London.
Thanks for such an in-depth reply, I genuinely couldnt argue with a thing youve said. Off topic slightly but do you think professional driving policies and defensive driving techniques have made the situation much worse?

I think you'll find that a lot of drivers are more cautious and I know generally I am about approaching a red, others just seem to throw caution to the wind and then get roasted by a manager and get SPADs on their record, which of course is on there with super glue.
For me I try to strike a balance in that if the conditions are good and permit a slightly harder run in, then I'll do it. However we're now entering the time of year where that sort of thing doesn't happen. I've had some nasty experiences and a couple of slides of a mile and now I brake earlier and lighter and whilst that may go against what the book says I find that for me, it works and it's what I feel comfortable with and so far *touch wood* I've had no problems.
The last time I did what the book said, I nearly SPADed, so make of that what you will, so perhaps you can understand why I treat the PDP with a little contempt, most of it is OK, but it does tend to be written in slightly condescending way and treats everyone as if they're newbies off the street, which I guess is understandable to those who wrote it, but it doesn't take into account those of us who have a lot of driving experience and for those of us it can be a little bit insulting.
I work to the conditions that are prevalent at the time, if I know an area is designated a low adhesion risk zone, then I'm really careful, if during the summer we have a long dry spell and then a shower again really careful, because the chances are it will be slippery.
I must be doing things right because I've had no overshoots, slide throughs or TPWS interventions or activations in over 10 years.![]()
That's because they've been cunning and removed the padding that currently exists between Guildford & Haslemere and Petersfield & Havant.
You have to remember a true fast service will do the trip from Guildford to Haslemere in approx 14' which isn't bad considering the gradients are against you all the way, you can do the up direction in 13'.
The current timetable allows you between 14-20' to do the piffling little 13 mile journey, that's why I don't do anymore than 45 mph between Guildford & Haslemere with a 1P, you just catch up the preceding service.
So you can immediately see where 6' has gone and you can take out another 3-4' of padding around Havant too.
If you leave Petersfield RT you can shut off at Bolinge Hill and coast all the way to Havant and still be there RT and there's a more than reasonable chance of doing the near impossible & that's going straight into Havant without stopping on HT19.
On the up I can go all the way from Havant to Petersfield with only one touch of the brake and that's to maintain the 40 through Buriton Tunnel and the necessary braking for Petersfield, if I drove it like a 1P service should be, I'd be sitting there at Petersfield a good 4' early and I know that if I chase it from Petersfield to Haslemere I could be sitting at Haslemere long enough to get a coffee and that's 5', if I'm leisurely I shut off at Liphook and just glide in to Haslemere a minute early!
Leaving Haslemere I can shut off at 45 mph and glide all the way to Guildford, only braking for the 60 section through Ashtead/Godalming to Farncombe and even then I can let it keep going with clear aspects and arrive Guildford RT.
If you do a proper fast with existing stops you can do the journey in 1h 25/27, that's still 5' faster.
I'm quite glad to see that other posters have tended to agree with me that the proposed timetable is utter tripe. And if that's what they intend to do then if I want to go to the coast I'll be in the car.
In normal conditions (no slippy rails), if the brake gets put into the full service position as it passes a single yellow, would a typical train stop in time before the next signal (at red)?
In normal conditions (no slippy rails), if the brake gets put into the full service position as it passes a single yellow, would a typical train stop in time before the next signal (at red)?
The one thing that really puzzles me is this odd idea of providing Godalming with 4 tph. Why?
It has the smallest carpark in the area, no more than 25 cars if that and if they bring 4 tph to it, that will only make traffic in Godalming even more horrendous than it already is because you'll get people parking illegally in the narrow streets.
Any coach/bus company could/will be laughing all the way to the bank as they'll be using the A3 and with a fast coach service getting all the way down to the Harbour quicker than the train!