Well we all know that there trains from Manchester to Chester via Altrincham and Stockport.
We also all know that these trains are a little hamstrung by a shortage of paths through Stockport, and the rather long way round the trains take.
The route does seem to spend a long time going through built up areas of South Manchester so might have potential for one or two new stations to be built on it.
It certainly seems there is room on the alignment for passing loops where required, and the bottleneck between Navigation Road and Altrincham can certainly handle two trains per hour.
So why not build a flyover-chord to connect the line to the Styal Line where the latter crosses it? The distance in height does not seem outrageous and there appears to be enough open space available for it to fit.
You could then divert two of the trains (per hour) that currently terminate at the Airport for the purpose of clearing platforms in Picadilly to Chester.
The capacity on the Styal Line is in any case rather less constrained than that through STockport, which would gain a path via this mechanism.
It just seems to be a route that is going to waste simply because of the lack of a chord to another relatively under-developed line.
I'm assuming there is some obvious reason this is impossible - but I am interested to hear what it is [and let's not talk about electrification or anything like that just yet!]
We also all know that these trains are a little hamstrung by a shortage of paths through Stockport, and the rather long way round the trains take.
The route does seem to spend a long time going through built up areas of South Manchester so might have potential for one or two new stations to be built on it.
It certainly seems there is room on the alignment for passing loops where required, and the bottleneck between Navigation Road and Altrincham can certainly handle two trains per hour.
So why not build a flyover-chord to connect the line to the Styal Line where the latter crosses it? The distance in height does not seem outrageous and there appears to be enough open space available for it to fit.
You could then divert two of the trains (per hour) that currently terminate at the Airport for the purpose of clearing platforms in Picadilly to Chester.
The capacity on the Styal Line is in any case rather less constrained than that through STockport, which would gain a path via this mechanism.
It just seems to be a route that is going to waste simply because of the lack of a chord to another relatively under-developed line.
I'm assuming there is some obvious reason this is impossible - but I am interested to hear what it is [and let's not talk about electrification or anything like that just yet!]