I don't believe there is physically space to add additional platforms at St Pancras Low Level.
I guess they could tunnel down/around?
I don't believe there is physically space to add additional platforms at St Pancras Low Level.
York road tunnels are still in situ so they could reuse that haha. It's pretty pathetic how we can't draw conclusions from past experiences and plan/invest/provision accordingly. Underground STP needs 4 platforms to work efficiently in my opinion since any, even slightest hiccup when 24tph start running, will have a core wide impact.
York road / Hotel curve tunnels may be in situ, but not for use as rail tunnels.
I must have explained on this forum 4 times why it was not possible to build more than 2 platforms at St Pancras LL. I can't remember which thread.
Bald Rick said:Any junction would have to be off the curve at the south end, shifting the whole station at least 150 metres further north and uphill
York road tunnels are still in situ so they could reuse that haha.
Or they could have made the south end tunnels 4 tracks wide and have 4 tracks from the last viable spot where the junction could be to where the STP is. It'd cost money obviously.
No 'they' couldn't.
I wrote a long explanation of this earlier this year (as well as in 2012, and a few times since). The last viable spot to the south is in the tunnels on the Farringdon side of the old Kings Cross Thamelink station. It's all cut and cover from there, so that means digging down. Aside from the Circle line being next door, (so you couldn't go that way) it means digging through the Euston Road outside Kings Cross, and knocking down the gothic part of St Pancras. Easy really.
No 'they' couldn't.
Nobody said it would be simple.
I appreciate space is at premium but I'm sure they could have found a workaround. One would be level separation starting between Farringdon and Kings Cross Thameslink potentially having the GN on separate level to the widened lines/TL and having STP split into two levels also. If there really is a need for GN to go through STP - I don't know why though - it feels that they decided to have GN go through STP only because it was the path of least resistance.
Path of least resistance sort of sums it up.
There is a lot of dissatisfaction locally on the GN with the proposed timetables, and anyone who thinks bustituting the Hertford to Stevenage service is a good solution is an idiot. Minimum possible work has been done on the GN - the failure to build the Stevenage extra platform is a good example of this.
I must have explained on this forum 4 times why it was not possible to build more than 2 platforms at St Pancras LL. I can't remember which thread.
Just been on a 700 on the 18:16 City Thameslink to Luton. The TfL status display was from 04:55 on the 2nd August.
Simon
Just been on a 700 on the 18:16 City Thameslink to Luton. The TfL status display was from 04:55 on the 2nd August.
Simon
I think a change of approach is needed.
Can it be done ?
Yes of course. Absolutely it can, there are various options. Including and not limited to a split 3 level station going nse and west all with an 8 track layout. Yeah why not. Millions and millions of pounds and years of disruption and a 6 month blockade of Farringdon and St Pancras. Yes it can be done.
Will it be done ?
Nope. Never. Not in this century.
Well, physically, anything is possible that doesn't break the laws of physics.
But knocking down the original St Pancras station? Can you imagine?
Quite. The proposed bustitution between Hertford North and Stevenage is totally unacceptable and must not proceed until there is a clear line of sight on the funding and building of the new bay platform at Stevenage.
I don't see why it should be so unfeasible for the Hertford service to go through to Letchworth, now the Hitchin flyover is in full use. It all sounds like the start of a realisation that the Hitchin-Cambridge line is going to seriously struggle with the planned service - not helped in any small way by the fact that northbound Thameslink trains will have picked up varying amounts of lateness before even arriving on the GN, thus throwing the finely balanced and inherently vulnerable timetable through the proverbial paper shredder.
Another PIS failure this morning on 700105, between Farringdon and STP all the screens went black for 2 minutes then gradually came back on one by one running down the train. Not an especially major issue as they were able to display the whole message about St Pancras before the doors opened but still, it's a reminder that the software running the system still isn't stable. Apart from the dreadful PIS I've had very few issues with the 700s technically and with the only exception of the incorrect seat pitch I still quite like the units. It's just a shame the rest of TL is still so bad. Riding 700114 again today was rather disheartening seeing the unit that I rode a year ago brand new on its first day in service now absolutely covered in filth. Then add the fact that a test service arrived before it at St Pancras with no announcement about it not being in service. It was obvious to me, what with the 'door not in use' signs all lit and it being an 8-car unit when 12 was advertised plus the 'not in service' on the displays, but non stopping services evidently are invisible to the new Thameslink platform displays and the only audible announcement made not to board the service was after most of the passengers waiting had wandered forward and tried to open the doors. It really isn't difficult to make such an announcement as the train enters the platform, especially when it arrives at the scheduled time of the real service and your train is held up behind it (surprise, surprise!)
The criticism levied against the 700s in here is often subjective but the criticism of GTR continues to be valid across the board IMO. A real shame.
The increase in services between London and Cambridge means there aren't any paths to run the Hertford service onto Letchworth, I believe. Terminating them in platform 4 at Stevenage (as at present) is also a no-go because the additional trains won't be able to run.
I don't see why it should be so unfeasible for the Hertford service to go through to Letchworth, now the Hitchin flyover is in full use. It all sounds like the start of a realisation that the Hitchin-Cambridge line is going to seriously struggle with the planned service - not helped in any small way by the fact that northbound Thameslink trains will have picked up varying amounts of lateness before even arriving on the GN, thus throwing the finely balanced and inherently vulnerable timetable through the proverbial paper shredder.
Makes the decision not to build the extra Stevenage platform all the more inexcusable, but is a prime example of the sheer incompetence associated with the Thameslink Programme.
Yes but the required resignalling can't be done before the timetable change...Does the option to build the extra platform still exist or will it now be physically impossible to do (something built either where the extra platform would be or on where the track to the extra platform would be)?
Yes but the required resignalling can't be done before the timetable change...