What would be a rough guess at the cost of rebuilding the cabs (per cab) with corridor connections (including replacement cabs for any 350, 444, 450 - iirc there's about half a dozen busted cabs between them classes).
This would be a huge cost - strip out all the complex wiring in the cab area, cut out the heavy structural pillar between the two windows and weld in two replacements in the correct places for the gangway. Insert a totally new control desk and put all the wiring back. Most seriously it would probably trigger compliance to various standards that have come in since the 360s were built.
More likely they would just continue to operate in non-gangwayed form. I wonder if they could be used on somewhere like the Chase Line where multiple operation would be unlikely and the commonality with the 350s would save the operator some cost in maintenance and crew training.
On the other hand maybe Bangkok airport rail link, which runs class 360 clones, could do with a few more?