Right by Shipwrights Arms, on the other side of Bermondsey St.
oh, thanks
Right by Shipwrights Arms, on the other side of Bermondsey St.
I think that's just temporary, according to twitter it will reopen on Monday.
I think from the planning application, it appeared the bridge and passageway would stay as it's where the fire escapes kick out, but it'll only be useful for getting to the terminal platforms, unless you fancy a very roundabout walk compared to using the new Tooley Street entrance.
It was still firmly closed this morning at 9am. I presume the engineering works overran as there were plenty of orange jackets around.
No James Nelson videos... no #behindthehoardings tweets, and my commute has changed to a new office so I don't go through London Bridge most mornings now. Sadness.
There is a new James Nelson video, posted today![]()
More like a political disaster if as predicted the 24TPH through the core is unachievable.
Who's predicting it will fail, ooi?
It's a view pretty widely shared among front-line staff who actually deal with the trains and the general public. 24tph relies on every piece of the system working with absolute precision to the tightest of timings. That includes the general public, who work to nobody's timetable but their own, and the class 700 units, which AFAIK haven't had a single day without at least one unit losing time to technical faults.
I expect it to be a similar result to the London Bridge 10-15 opening back in January 2015. Computer models designed to fulfill a political goal rather than the realities on the ground resulted in absolute chaos and a less ambitious remedial timetable being imposed.
I see London Bridge reconstruction has won infrastructure project of the year under "Greatest Contribution to London".
That certainly makes me fear for other projects around London if they can't beat a building which has leaked like a sieve requiring swathes of the concourse to be sealed off and barrier lines protected with tarpaulins. Also, not forgetting the contribution to employment with the bloke sitting outside of the lift.
It's a view pretty widely shared among front-line staff who actually deal with the trains and the general public. 24tph relies on every piece of the system working with absolute precision to the tightest of timings. That includes the general public, who work to nobody's timetable but their own, and the class 700 units, which AFAIK haven't had a single day without at least one unit losing time to technical faults.
I expect it to be a similar result to the London Bridge 10-15 opening back in January 2015. Computer models designed to fulfill a political goal rather than the realities on the ground resulted in absolute chaos and a less ambitious remedial timetable being imposed.
Fair enough. 24tph through single platforms in the core does seem a bit optimistic regardless of how many doors the 700s have. The proposed 16tph through London Bridge doesn't seem as manic but I guess getting the timings right in to the core will make things far tighter in practice. Suppose we'll see next year!
Is there any firm proposals or funding for said platforms? Off topic I appologise but saves a new thread for literally 1 question
Thanks for this. A lot of admitedly expensive but worth while and major improvements within easy reach and not to much work compared to some projects.
CP6 funding may or may not come clearer post election
I would suggest that the single platforms are not the limiting factor. After all the Victoria Line is, or shortly will be, running 36 trains per hour (and other London tube lines are pretty close behind) all with single platforms per direction.
The Victoria Line is a simple end-to-end route while Thameslink has junctions close to both ends of the core - one of these being a flat junction. Thameslink's frequency will be more limited by these junctions, its interactions with other, non-Thameslink services and limited train speeds than by the single platforms alone.
Looking at the construction of platform 1 has anyone seen any images of what the wall on the Tooley St side of P1 will look like?- I would hope it is high enough to stop anyone climbimg over or lobbing a bottle onto pedestrians below.



And the service to the Greenwich line from that platform will be drastically worse than what existed before work begun!