ModernRailways
Established Member
- Joined
- 21 Apr 2011
- Messages
- 2,184
that doesn't seem to make sense.
They make lots of decisions that make no sense. I'm sure they just do it for the giggles at times.
that doesn't seem to make sense.
They make lots of decisions that make no sense. I'm sure they just do it for the giggles at times.
I don't see why Nexus didn't kill off more RGC trains and run more Monseaton ones? The trains to Regent are always empty and are a pain for the Airport trains, delaying them significantly in some cases.
Talking of peak trains being cancelled, does a service suspension between Monkseaton and North Shields really justify cancelling ALL peak services this afternoon!?
Yes, it frequently is, as that's the train I get home. That explains why, though, even if it doesn't make elbowing on to the 1712 any nicer.
I've seen a few occasions where it has run...and diverted to Regent Centre instead. Given the north half of the Coast loop is one of the busiest parts of the network, with the big car parks at FLE and Northumberland Park, that doesn't seem to make sense.
I must say though, it does look like they've been investing some hard cash into the rolling stock, lots of equipment that appears 'new' on the underside of many units.
Train which failed at Tynemouth had a seized gearbox, so unable to drive it away or get an assisting train to help. Had to be jacked up and put on wheel skates, which meant an overhead isolation. In addition, it failed in a bad place seeing as Tynemouth has points which allow turnbacks, which meant service had to be suspended between North Shields and Monkseaton.
Part of the problem when there is disruption is the fact that drivers are displaced. Under the current roster there are 70 duties (used to be 72 until the timetable changed), not including early and late standby, and any spare drivers. As the roster is fixed, there is no room for changes unless you have a decent number of spare drivers or drivers who are willing to work beyond their day (which again can bring problems for duties the next day due to the need for 12 hours rest in between shifts).
For this disruption it meant that some drivers were having to be based at Monument to work St. James - North Shields, which means additional travelling time from the signing on point at South Gosforth. Plus with trains turning back at Monkseaton, it means the timetable goes to pot on the Coast route. The easiest way to 'create' extra drivers is to cancel the shorts and put those drivers onto normal service trains, but this again has problems as most of the duties which contain short workings finish by about 6/7pm. Only other way to get drivers in is ask at short notice, which will normally only mean one or two extra drivers.
So in short, there is very little leeway in the diagrams. A delay of 6 minutes to one driver can mean that he/she is unable to pick up the next part of their duty. So when there is a large disruption, it is chaotic.
Perhaps the mooted speed increase to 100kmh will be needed to keep the Metros competitiveness against express bus services.
Are there any booked spare turns? (In theory and in reality?!).
I have two weeks in Newcastle at the beginning of July. I was lucky enough to catch 4001/4040 last year. What's the likelihood of the other two unrefurbished metro cars being in service this summer?
If you are visiting during the week, there will be a very good chance 4040 and 4083 are out as there are no spare sets at the minute and every available car is needed for service. 4001/02 unlikely to be out.
Doors fail all the time, nothing new. Normally worse in the summer due to the heat.
http://www.chroniclelive.co.uk/news/north-east-news/tyne-wear-metro-return-public-13214178
Thoughts? I am surprised that the punctuality stats are close to the 90s; have they changed the way they monitor them?
Thoughts?
Did anyone ever work out why 4040 was chosen as the fourth set not to be refurbished? 4001/4002 were obviously chosen due to being prototypes, while 4083, as mentioned earlier in this thread, was involved in an accident which took integrated transport to a new level.
Apologies if I've missed the answer somewhere in this thread!
I've noticed that Nexus have stated that Monkseaton trains will be cancelled for the foreseeable future, citing a particularly poor component. Does anyone know much about the current major headaches for maintenance?
It's really concerning that ~30 units are out of service. The major line closure has came at just the right time.
I've noticed that Nexus have stated that Monkseaton trains will be cancelled for the foreseeable future, citing a particularly poor component. Does anyone know much about the current major headaches for maintenance?
It's really concerning that ~30 units are out of service. The major line closure has came at just the right time.
FWIK, it's to do with the coupling system and the reason there's so many out of service is because the parts need to be manufactured as they can't just be bought off the shelf anymore. This will only become more and more common as the stock gets older, failure rates increase and more of the parts become obsolescent.
They could only ride the high for so long though. Service has been doing too well for the past couple of months
Is it really 30 units out of service ? reading the posts, it suggests that there are only 90 units - meaning that a third are out of use.
Metro had eight trains out of use yesterday, I assume this means 16 units. Where are the other 14 units ?
Is it really 30 units out of service ? reading the posts, it suggests that there are only 90 units - meaning that a third are out of use.
Metro had eight trains out of use yesterday, I assume this means 16 units. Where are the other 14 units ?
Anything to do with an (alleged) separation between two out of service Metrocars at Heworth?
Anything to do with an (alleged) separation between two out of service Metrocars at Heworth?
Looking at the Sort Out The Metro group and photos of said alleged incident...probably
I've heard nothing about this - any images? If they separated unintentionally then it would need reporting to the RAIB.
Could you reshare the photos here or direct link them please?