southern442
Established Member
Northern 323's anyone? Or is it too early to say?
They are going to join the Birmingham fleet.Northern 323's anyone? Or is it too early to say?
They are going to join the Birmingham fleet.
Are they? So you know all the bidders for the next LM franchise are bidding 323s, do you?
If Northern doesn't do anything about the 150s, then trust me, they're gonna get rid of them by 2030. Nasty square boxes, they are.
It's been a long time since I've been on a 156, but they're just as old as any other BREL unit. They could maybe have air conditioning fitted to make them just as good as the 158s, but apart from that, they're probably not gonna last.
314s are gonners as well IIRC. I think that we'll also be seeing the scrapping of the 456s, SWT 455s, and most of the 321s as well, unless we see ROSCOs coming up with new and exciting ways of bunging diesel engines underneath vehicles for use on non-electrified lines. 458s will also have an unsure future I'd have thought.
They're really not bad units. Especially considering the alternatives of the time.
The ex460 458s (the ex Gatwick Express ones) have got an uncertain future as they have no pan well. The rest should have a good chance of finding a home as they have pan wells, the big questions is whether any of the internals are in place for conversion (wiring, electronics etc)
There is no (practical) way of making them 2020 compliant as single unit. I think the main PRM issues are the small end passenger doors, narrow passageway at the toilet end and the fact fitting a universal toilet would take up a huge amount of the total space available. Therefore their future most likely doesn't lie as single units, if they are not scrapped they are expected to either be reformed as a "new" 155 type unit or simply be permanently coupled to 150s or 156s as trailers.
As to the structural issues I've heard various claims that some of the class has problems with the chassis sagging under the weight of equipment that it was never originally meant to carry, not sure how true those are.
The ex460 458s (the ex Gatwick Express ones) have got an uncertain future as they have no pan well. The rest should have a good chance of finding a home as they have pan wells, the big questions is whether any of the internals are in place for conversion (wiring, electronics etc)
Wibble... I doubt it is beyond the realms of possibility to fit a pan well to those units which don't have a pan well, the questions that need asking are "is there anywhere that needs extra trains and are they actually suitable for the job".
It would be a different situation for every single electric train coming off lease if various bodies (including Network Rail, DfT, Welsh Government et al) were actually capable of coherently managing the electrification of a railway, let alone completing it efficiently and affordably, in a very short timescale, similar to the way in which BR completed many of it's fill-in schemes in the late 80s/early 90s.
Yeah, I suppose. Don't really know them though.
I was thinking on those lines earlier - if there was a will to electrify, the rolling stock will be available and that part of the cost is covered.
But you'd need a huge amount of infilling. Take Salisbury to Exeter as an example: 100 miles and a journey of nearly two hours. Allowing fifteen minutes layover at each end, the complete round trip would take 4 hours 30 minutes. With 2 trains per hour you'd need nine trains. If they were 458s, assume there are five journeys each way in the morning, and five in the evening, each of which needs two units. I think you need eight more units each time (I'm not an expert timetabler, obviously!). Seventeen trains, so allow three more for maintenance and spares, and that's not much more than half the class 458 fleet. Of course there wouldn't actually be a layover at Salisbury as the service would run through to Waterloo (I just assumed that to simplify the arithmetic), so we'd need more units and we might utilise 32 or 33 out of the 36 class 458s. But there's over 100 class 321s, fifty or more 319s which will be spare, twenty 360s from Greater Anglia, thirty nine 365s perhaps, over 100 of SWT's 455s with a lot of life left in them....how many miles need to be electrified to make use of over 300 4-coach EMUs?
So why are you complaining about them?![]()
I was thinking on those lines earlier - if there was a will to electrify, the rolling stock will be available and that part of the cost is covered.
But you'd need a huge amount of infilling. Take Salisbury to Exeter as an example: 100 miles and a journey of nearly two hours. Allowing fifteen minutes layover at each end, the complete round trip would take 4 hours 30 minutes. With 2 trains per hour you'd need nine trains. If they were 458s, assume there are five journeys each way in the morning, and five in the evening, each of which needs two units. I think you need eight more units each time (I'm not an expert timetabler, obviously!). Seventeen trains, so allow three more for maintenance and spares, and that's not much more than half the class 458 fleet. Of course there wouldn't actually be a layover at Salisbury as the service would run through to Waterloo (I just assumed that to simplify the arithmetic), so we'd need more units and we might utilise 32 or 33 out of the 36 class 458s. But there's over 100 class 321s, fifty or more 319s which will be spare, twenty 360s from Greater Anglia, thirty nine 365s perhaps, over 100 of SWT's 455s with a lot of life left in them....how many miles need to be electrified to make use of over 300 4-coach EMUs?
Why are 39 (?) Class 365s coming spare? What would replace the remaining Great Northern units?
The main issue would be if the pan well could be installed without compromising the crash structure.
I wasn't really thinking of lines like Exeter - Basingstoke, rather things like Hurst Green - Uckfield, Ore - Ashford, the rest of the North Downs, the Sudbury and Felixstowe branches, the local services between Chathill/Morpeth & Newcastle etc, which would just take advantage of having EMUs available cheaply rather than needing them in huge numbers or having to build new units in the first place.
I've heard this said about 153s quite a few times recently. Why are they in more urgent need of replacement than 150s and 156s then? Is it to do with build quality/parts, something like that?
I don't suppose the DRS Mark 2s have much of a future. If DRS intend to continue providing spot-hire cover after 2020 I assume that'll have to take the form of modified Mark 3s or new build LHCS.
The main issue would be are the trains proposed to be redeployed in an area without the 3rd rail (yes or no), and if they are how much work is required, realistic and affordable to enable them to use the 25kv system. Anything like that would be included in the process anyway.