dk1
Veteran Member
Lowestoft has 3 platforms, only needs 2!
Crewe strikes me as over engineered, left over from it's days as a major hub!
All 3 are in use at 09:07 Monday's-Friday's but being permissive platforms you could get away with 2.
Lowestoft has 3 platforms, only needs 2!
Crewe strikes me as over engineered, left over from it's days as a major hub!
Crewe still is a major interchange, with lines radiating in six directions.
If anything, the 1980s remodelling had too much emphsis on high speed running through the centre roads.
Crewe has all its operational flexibilty in completely the wrong place for today's needs! Plus lots of low speed turnouts in places where they would not be placed today.
Through Platforms 1, 5, 6 and 11 are over-utilised (ATW Manchester-Cardiffs can only use 5/6, Manchester terminators really have to use 1, North Wales-Euston Platforms 6/11 only), whereas the bays are very under-utilised and Platform 12 is so poorly connected to the rest of the station its use is avoided.
Vauxhall in central London - only 4 of 8 platforms in regular use
Vauxhall in central London - only 4 of 8 platforms in regular use
What about Inverness?
Obviously the track layout currently mandates the number of platforms in that it's effectively two separate stations. But if money were no object and things could be remodelled in such a way that any service to/from any destination could use any platform, would seven platforms still be needed for current service levels?
The island platforms at Esher and New Malden have been allows to fall into disuse. I imagine if the fast lines were side by side and the platforms for up and down fast mainlines an island, the same might have happened at Vauxhall.That's not quite right. Platforms 5/6 are on the main through lines and so get used only exceptionally. Platforms 1/2 are on the up Windsor lines, and these days the Windsor service, which is usually on the fast line, stops at the station. The same applies to platforms 3/4, on the down Windsor lines. Platform 7/8 are on the main local lines and all main local services stop there these days. So it's only the main through platforms that don't get used on any regular basis, two out of the total of eight, and it's useful to keep those two in operational condition for emergency use.
The island platforms at Esher and New Malden have been allows to fall into disuse. I imagine if the fast lines were side by side and the platforms for up and down fast mainlines an island, the same might have happened at Vauxhall.
How about Shrewsbury?
Two long, disused bays (P1&2); and P3 only getting occasional use by (IIRC) HOWL services.
[Vauxhall]That's not quite right. Platforms 5/6 are on the main through lines and so get used only exceptionally. Platforms 1/2 are on the up Windsor lines, and these days the Windsor service, which is usually on the fast line, stops at the station. The same applies to platforms 3/4, on the down Windsor lines. Platform 7/8 are on the main local lines and all main local services stop there these days. So it's only the main through platforms that don't get used on any regular basis, two out of the total of eight, and it's useful to keep those two in operational condition for emergency use.
[Vauxhall]
I wonder if by next December (when the former international platforms come into permanent normal use), the usual platforming at Vauxhall may be different again, with some of the lines being redesigned as a result of the throat changes?
Don't P5/6 get used reasonably often on Sunday mornings whenever a two track timetable is in use on the main line side for planned maintenance?
Main difference post-December is likely to be that more Windsor line services may be routed in via the Windsor Revsersible line rather than the Up Windsor, thus using Platform 1 rather than Platform 2 at Vauxhall.
There are five platforms at Scarborough and only 2 trains an hour for most of the day
Makes sense. Was really wondering if the line designations will stay the same in the long term, for instance could P1 just become an Up Windsor, rather than "reversible".
Be interesting to see if some sort of "end-state" track plan appears this summer?
I had a look to see if there was anything useful in the Network Change Notices, but as is usually the case there are no diagrams in the publicly accessible version...
Don't thing it's been suggested so Exeter Central. The main platforms are long - although I do like being able to leave out the back - and the bay platform is pointless as there seems to be no reason to not send any train through to St Davids
It's handy to have the reversible function, as if something goes bang with the points at nine elms, you can still bring one down the reversible and cross back at QTR.
Nuneaton all seem to have platforms that are rarely used.
Platform 3 and 4 I would guess aren't used much now since Virgin stopped calling during the day (I believe there's still peak services though?).
Been a while since I caught a train from Nuneaton.