One thing I would definitely like to see is a station at Braehead in Glasgow, using the existing line that comes pretty close to the shopping centre. Extending it by a few hundred metres would take it almost to the door but cause issues as it would go across the car park.
Also, I haven't considered the capacity issues out of Central.
One thing I would definitely like to see is a station at Braehead in Glasgow, using the existing line that comes pretty close to the shopping centre. Extending it by a few hundred metres would take it almost to the door but cause issues as it would go across the car park.
Also, I haven't considered the capacity issues out of Central.
I'm not sure why you're puzzled. They announced when EDI gateway opened that the add-on fare for the tram to the airport would be £4, as opposed to the normal rate of £5. I don't think there's a bus alternative from Gateway. Nor does the standard-fare bus to the airport (35) call at Edinburgh park.
Although I suppose you could argue that there should be a flat rate to all EDI stations, to which the £4 could be added.
One thing I would definitely like to see is a station at Braehead in Glasgow, using the existing line that comes pretty close to the shopping centre. Extending it by a few hundred metres would take it almost to the door but cause issues as it would go across the car park.
Also, I haven't considered the capacity issues out of Central.
Why not add the fare on from the cheapest of the three locations to change at? And why charge £4 one way and £4 the other? How is £8 good value for a return from Edinburgh Gateway to Edinburgh Airport?
Why not add the fare on from the cheapest of the three locations to change at? And why charge £4 one way and £4 the other? How is £8 good value for a return from Edinburgh Gateway to Edinburgh Airport?
Aside from the indoor skiing, Braehead is just a big shopping centre that has nothing more than you'd find in the city centre, so I'm not hugely sure where the attraction would be in a dedicated rail link? If you're going to use that line, much better to serve Renfrew.
The reasons why people go there are irrelevant. The fact is lots of people go there and mostly by car.
The reasons why people go there are irrelevant. The fact is lots of people go there and mostly by car.
Using that existing line, there would be only one station in Scotland where you would get to Braehead without a change in Central Glasgow; Cardonald.
With the existing track layout, trains from Glasgow Central to Braehead wouldn't be able to call at Cardonald.
Why not? The old branch is immediately west of Cardonald. (Or is this down to the actual proximity being a problem).
To gain access to the branch from the east, trains must run through Cardonald station on the Up Ayr line (the middle line), which doesn't have a platform.
Presumably the installation of the extra infrastructure allowing trains to cross from the Up Ayr line is not exactly insurmountable?
Work on the second platform, which would be south of the railway line and beside Salisbury Walk, could be carried out as quickly as spring 2019.
Planning permission would be required but, if it got the go-ahead, work could be complete by spring 2020.
I presume it would consist of converting the existing (unused?) siding into a loop?Chance to look at plans for second platform at Dunbar Railway Station
I presume it would consist of converting the existing (unused?) siding into a loop?
No; it's just a new platform alongside the existing Down line.
This, and the above statement "south of the railway line and beside Salisbury Walk", describe a station with two platforms an enormous distance apart. No doubt cheaper than reconstructing the previous second platform and doubling the loop off the through line, but a long walk over the footbridge (fitted with lifts?) between new platform and ticket office.
What is the reason for the second platform, given that it doesn't seem to appear in the wishlist of Rail Action Group East Scotland? Would all westbound stoppers use it, or would the current platform continue to be bidirectional with the new one used only when two trains call at the same time?
Going back to the Braehead idea. I was there yesterday with my partner and step daughter. We went on bikes and it was a pleasant route.
I had a quick look at the end of the current line. A 200 metre extension would take you to the door of the shopping centre and about 800 metres (I estimate) to a site with a new station between Xcape (the ski slope (largest in UK and busy)) and between the main shopping centre.
I often run youth trips to Glasgow and it would be *much* easier getting there by train from Central as opposed to the bus.
I am convinced that there would be a significant shift and advantage by providing a station here. That could be as part of a wider or future Renfrew scheme or standalone. There is also opportunity to provide a new curve back onto the mainline, heading west, so that a semi-through service could be provided. It would certainly be busier than Cardonald I think.
A link would be helpful, or some indication of where the quote comes from.Chance to look at plans for second platform at Dunbar Railway Station
surely the whole point is to eliminate trains crossing lines on the flat.