Stirling, Perth and Dundee maybe, but are there sufficient staff to allow this at the smaller stations?
During the day, yes.
Stirling, Perth and Dundee maybe, but are there sufficient staff to allow this at the smaller stations?
I remember downloading this a few years back. Much better!
![]()
A simpler solution would be to develop an electronic reservation system for bikes for access both on board and at stations - so you can delegate the duties to station staff for removing/adding bikes in the power cars.
For example;
Stirling, Perth, Pitlochry, Kingussie, Aviemore, Elgin, Inverurie, Dundee, Leuchars
All of the stations above are staffed and most are key interchange points of which trains normally sit for at least 3 minutes at a time upon arrival - sufficient time in my opinion.
A simpler solution would be to develop an electronic reservation system for bikes for access both on board and at stations - so you can delegate the duties to station staff for removing/adding bikes in the power cars.
For example;
Stirling, Perth, Pitlochry, Kingussie, Aviemore, Elgin, Inverurie, Dundee, Leuchars.
Is the cant part of the can't at these stations?
Wide doors, wide gaps on curved platforms, awkward cant and no stepboard isn't the best of mixes.
Virgin currently loads and unloads bikes from HSTs at these stations with no problem. As these routes require reservations for cycles (on both Virgin and ScotRail), the guard knows when to expect someone getting on/off with a bike, and is waiting at the cycle space door. Pretty straight-forward.
I remember downloading this a few years back. Much better!
![]()
More importantly, there are probably quite a few cyclists who are happy that the compartment that is storing their £8000 carbon fibre bike is safely locked until final destination.
PS - actually putting buffers on a production HST, as in Grand Central, is the most unsympathetic thing you can do to its appearance, but that's another thing entirely...
Oh yes, I know this particular bit of design vandalism was committed by BR relatively early in the life of the trains - I only mentioned Grand Central because that's where you see the victims now.You do know why a handful of power cars have buffers, right? It's nothing to do with Grand Central, they just ended up with those ones.
It's sort of a reasonable point and not ideal by any means but the 6 bike spaces in the power cars do make up for the overall loss of spaces to a fairly large extent. A lot of the pressure on the HML is from long distance cyclists doing either LEJOG or shorter touring routes in the Highlands out of Inverness. These can all be accommodated in the Power Car provision.
For me I think if they had a slightly more flexible policy that also allowed access to the power car provision at selected key intermediate locations that would probably be enough.
Maybe just Perth, Stirling, Dundee and Aviemore. That would cover nearly all the places with high demand for bike usage and still leave the Guard free to not worry about bikes for most of the journey.
wow, the 170 in that livery looks lovely.
Not a chance. In modern Scotland everything has to be branded with a Saltire. Any thing else is regarded as treason.
Not a chance. In modern Scotland everything has to be branded with a Saltire. Any thing else is regarded as treason.
Given all the BS nationalism we have these days isn't about time the stag and westie made a resurgence?
The saltire livery is livery very, very boring
Not true.
There are no Saltires on, or Gaelic signage for "Job Centre Plus"
I disagree. I very much like the livery, and it is entirely appropriate for the national rail operator to carry the national flag. It's hardly without precedent: Amtrak trains bear the US flag, and airlines often have their national flag represented (Virgin Atlantic being a notable example of an airline bearing the Union Flag).
I don't have a problem with the stag and westie, but I think the old Scotrail livery is very dated and really shouldn't make a comeback in that form.
The wider point is the hijacking of the Saltire by nationalists, it is now everywhere as part of the grievo max agenda along with Gaelic signs, even in parts of Scotland where Gaelic was never spoken. They are trying to create a shortbread tin image of a past utopia that never existed in Scotland.
The wider point is the hijacking of the Saltire by nationalists, it is now everywhere as part of the grievo max agenda along with Gaelic signs, even in parts of Scotland where Gaelic was never spoken. They are trying to create a shortbread tin image of a past utopia that never existed in Scotland.
The Saltire livery is very boring, however as a regular endurer of Scotrail, the colour of the trains is not really relevant, if they were reliable, ran on time, cleaner, offered a better standard of customer service then we might make progress. However none of these things are likely to happen soon.
Not true.
There are no Saltires on, or Gaelic signage for "Job Centre Plus"
ScotRail have been accused of introducing “new” trains – with 10million miles on the clock.
A fleet of refurbished InterCity 125 trains will come into service on routes from Glasgow and Edinburgh to Inverness and Aberdeen next year.
The 26 high-speed trains date back 40 years. They were introduced by British Rail in 1977.
Having travelled about 1000 miles a day, they have now each covered about 10million miles.
The InterCity 125s are being used by Great Western *Railway in England, where replacement electric stock is being phased in.
They are being leased for 12 years by Dutch operators Abellio, who will spend £54million refurbishing them...
