DarloRich
Veteran Member
It's quite easy to hire in the occasional few lorries for planned works on the railway.
it isnt that simple.
It's quite easy to hire in the occasional few lorries for planned works on the railway.
Given that works are planned months in advance, I doubt it would be that challenging.it isnt that simple.
i don't think it can - there inst the infrastructure or people to support it and customers now expect the parcel delivered to their door asap.
I am minded to disagre, or at least with the fact that people want a parcel delivered to their door ASAP.
The big issue people have with parcels is being out on delivery day, and many solve that busy having the, delivered to work. However our office can't be the only one that has banned personal parcel deliveries as the post room was full of them!
I think people want their parcel ASAP but are prepared to go to a convenient point to collect it. You will note Amazon lockers springing up all over the place, you can have goods from EBay delivered to Argos stores, Amazon deliver to certain petrol stations, corner shops etc.
Wouldn't it be remarkably convenient for a commuter to get back to their home station, and collect from a locker the parcel they ordered the previous day?
It would of course mean having station staff to put the parcels in the locker etc, but that could be good as more justification for them.
Wouldn't it be remarkably convenient for a commuter to get back to their home station, and collect from a locker the parcel they ordered the previous day?
It would of course mean having station staff to put the parcels in the locker etc, but that could be good as more justification for them.
I don't bother as i get same day delivery form Amazon to my home in the evening.
Is there 125mph electric stock going spare?
it isnt that simple.
it isnt that simple.
As someone who used to hire tractor units on a daily basis, it really is that simple. Especially for either RM or large parcels firms. Getting agency drivers in can be a little more tricky, but given the planned nature of most railway possessions, it can be sorted in good time.
Surely all of that is missing the point, though. Would it not fall to the railway to organise suitable replacement when they cannot fulfil their contracted obligations?!
Shaw, very few planes can fly in to City, and the pilots need to be specially trained and approved. I think there is a cargo version of the BAE 146 (I think the QT(, but i'm not sure how many are hanging around spare in the day.
Reliability of the infrastructure was a big issue in the contract moving to the roads/air. Railways could no longer guarantee to get the mail through by morning.
Overnight road closures have much less impact on mail services than overnight closures of key main lines. Think WC upgrade works
Surely all of that is missing the point, though. Would it not fall to the railway to organise suitable replacement when they cannot fulfil their contracted obligations?!
A Mk 4 would be easier to convert to roller shutters.
I am sure BR/RES/EWS had 2 Mk 3 sleepers converted at the RTC.
Was not a success!
That's a point; what were the Nightstar gen vans, weren't they MK3s?
A Mk 4 would be easier to convert to roller shutters.
I am sure BR/RES/EWS had 2 Mk 3 sleepers converted at the RTC.
Was not a success!
Issues, potentially, with people removing parcels and inserting bombs?
.
Doddle, of course, was the first go at doing that with collection at the busier end of the journey. Problem is that along came Collect+ etc with far lower overheads, so Doddle will probably fail
Is there 125mph electric stock going spare?
Having worked for and with a number of these online shops/delivery companies, in my experience it actually is pretty easy.
Smaller hauliers know that if they get a foot in the door it can be a real moneyspinner for them. And the giants want reliable hauliers who are there to dig them out of the hole they invariably end up in. I had a few contacts who I knew could pull a driver and a unit out of a hat if needed even at the busiest time of year. Usually you would find that he had a favour due from (or had simply subcontracted) another firm so it wouldn't even have been one of his units that turned up.
As someone who used to hire tractor units on a daily basis, it really is that simple. Especially for either RM or large parcels firms. Getting agency drivers in can be a little more tricky, but given the planned nature of most railway possessions, it can be sorted in good time.
Surely all of that is missing the point, though. Would it not fall to the railway to organise suitable replacement when they cannot fulfil their contracted obligations?!
For planned works, none of that presents any significant challenge. If you know twelve weeks in advance that the line is going to be shut, you simply tell your customers twelve weeks in advance that either collections will be early or deliveries will be late on the days affected. They can work around changes like that given enough notice.Getting the mail up the roads in the same timescale and same bulk as the train is, serving as many destinations ( quickly) as the train does is an issue, having the infrastructure to accept road over rail deliveries is an issue, driver hours are an issue on the roads but making sure the mail is in position for onward delivery ( and remember these were the days of posties delivering mail early and often twice) is very important.
For planned works, none of that presents any significant challenge. If you know twelve weeks in advance that the line is going to be shut, you simply tell your customers twelve weeks in advance that either collections will be early or deliveries will be late on the days affected. They can work around changes like that given enough notice.
Yes. I have never seen inside a UK gen van, but bet there were a few girders running the length of the body to spread the weight.
And it did not have holes cut in the side.
Cutting holes in Mk 3 stock is a no, no however.
There are many pics of the GNER Mk3 that had sideswipe damage.
Think it sat at Doncaster works for a long time.
It had steel welded in to stop it folding in two.
Yes. I have never seen inside a UK gen van, but bet there were a few girders running the length of the body to spread the weight.
And it did not have holes cut in the side.
Cutting holes in Mk 3 stock is a no, no however.
There are many pics of the GNER Mk3 that had sideswipe damage.
Think it sat at Doncaster works for a long time.
It had steel welded in to stop it folding in two.
Indeed. Having had a Google it would appear that the genny vans were former sleepers, and it looks like they simply replaced the porthole windows with grilles. The generator units were inside some sort of 'acoustic' housing, apparently, so I imagine the thing was quite substantial inside, as you say.
And if it's not suitable, you've got three months to find an alternative for those few days that are affected.That would depend on their contract particulars, presumably? Depending on your business, early delivery may not be suitable. And late delivery is certainly no good if your timescales are critical.
But what about the scheduled services on those lines (already at capacity)?
A